RERA registered PR1260002600396 Active
Samarth
Pune Camp, Pune · Residential / Group Housing by Aarambh Constructions
Official record Updated from the register 16 September 2026. Anything filed since then is not here yet.
In short
Samarth in Pune Camp is MahaRERA-registered (PR1260002600396) and still under construction, with possession filed for December 2028. No sales are registered in this project yet. Units the same size elsewhere in Pune Camp have registered at ₹10,781–24,285 per sq ft of carpet — the neighbourhood, not this building. None of the units are filed as sold yet. Aarambh Constructions is the promoter.
- Nearby at
- ₹10,781–24,285
- per sq ft, same sizes in Pune Camp
- Available
- 2, 3 BHK
- 8 left · 717–963 sq ft
- Possession
- Dec 2028
- as filed with MahaRERA
Where this is
Pune Camp, Cantonment, Pune, 411002
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Flat sizes on file
All 8 flats are filed unit by unit with the authority, the highest on floor 4. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
2 BHK 4 units · all available
3 BHK 4 units · all available
0 / 8
0% absorption rate
Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
2 BHK 4 flats · 4 available
717 sq ft carpet as drawn
- Carpet, filed
- 717 sq ft
- Built-up
- about 860 sq ft
- Super built-up
- about 1,004 sq ft
Every room in this flat
Living and dining about 209 sq ft, Master bedroom about 139 sq ft, Second bedroom about 111 sq ft, Kitchen about 84 sq ft, Bath about 49 sq ft, Balcony about 49 sq ft, Second bath about 42 sq ft, Passage about 35 sq ft.
3 BHK 4 flats · 4 available
963 sq ft carpet as drawn
- Carpet, filed
- 963 sq ft
- Built-up
- about 1,156 sq ft
- Super built-up
- about 1,348 sq ft
Every room in this flat
Living and dining about 237 sq ft, Master bedroom about 158 sq ft, Second bedroom about 126 sq ft, Third bedroom about 103 sq ft, Kitchen about 95 sq ft, Bath about 55 sq ft, Balcony about 55 sq ft, Second bath about 47 sq ft, Passage about 47 sq ft, Third bath about 39 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What flats like these cost nearby
No sale has been registered at Samarth yet. The promoter has filed no agreement values, so nothing below is this project's own price.
| On sale here | Registered in Pune Camp | Which for this size is |
|---|---|---|
| 2 BHK 717 sq ft | ₹10,781/sq ft 327 sales, 9 projects | ₹77.3 lakh middle half ₹10,091–24,778/sq ft |
| 3 BHK 963 sq ft | ₹24,285/sq ft 70 sales, 4 projects | ₹2.3 crore middle half ₹10,215–25,358/sq ft |
Each rate is what buyers contracted to pay for the same configuration in Pune Camp, over the carpet area on the same filing. Floor and facing move a rate, and a project new on the register can open above or below what its neighbours sold at two years ago, so the last column is arithmetic rather than a quote. See every rate registered in Pune Camp.
The state values these at ₹8,619 per sq ft of carpet — one rate across all 8 still available, which puts the smallest at ₹61.8 lakh and the largest at ₹83 lakh. Stamp duty is charged on whichever is higher, this or the agreement value, so nothing here can be registered below it. Read it as the floor under the price you will be quoted, which in most Pune localities sits well above it.
Timeline audit
Stable projection
No delay reported in the latest RERA filings. Construction is recorded against the original baseline date the promoter registered.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Pune (CB) · shown on this site as Pune Camp |
|---|---|
| Taluka | Pune City |
| Street, as filed | CTS.NO. 575 |
| Bounded north by | GOVERNMENT ROAD |
| Bounded east by | S.NO. 574 |
| Bounded south by | S.NO. 590 AND 591 |
| Bounded west by | S.NO. 577 |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Aarambh Constructions |
|---|---|
| Registered office | Shop No. 1, 383, Unity Classics, Sadashiv Peth, Pune 411030 |
Professionals named on the filing
| Architect | Nitin Baliram Shinde PMC/SUPV-1/LIC.NO.0091 |
|---|---|
| Engineer | Sv And Associates 783 |
| Chartered Accountant | Ninad Prataprao Shete 167354 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report Search Report.pdf | 9 April 2026 |
|---|---|
| Conveyance deed Purchase Deed_11zon.pdf | 7 May 2026 |
| Promoter's declaration, Form B Form B Affidaviat Cum Declaration New.pdf | 9 April 2026 |
| Annexure A declaration Annexure A - Declaration Cum Undertaking.pdf | 9 April 2026 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | PR1260002600396 |
| Promoter | Aarambh Constructions |
| Project type | Residential / Group Housing · Building development |
| Locality | Pune Camp — Pune City taluka, pincode 411002 |
| Applied on | 11 March 2026 |
| Registered on | 12 May 2026 |
| Completion, as first filed | 28 December 2028 |
| Due | 28 December 2028 |
| Units declared | 8 |
| Units sold | None sold yet, all 8 on the market |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 12 May 2026 |
| Application reference | ACK14022606664 |
| Current status | Active |
| Record last changed | 12 May 2026 · 4 months ago |
Nothing has sold yet. The promoter's quarterly progress report says none of the 8 flats are gone, and the unit-by-unit list they file separately says the same: all 8 still unsold. On a project this new that is normal rather than a warning, and it means every carpet area filed here is still available. Either way, this is only as current as the last change to the record, 12 May 2026.
Common questions
- Is Samarth registered with MahaRERA?
- Yes. It is registered as PR1260002600396, filed on 12 May 2026, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Samarth due to be handed over?
- The promoter has told MahaRERA December 2028. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Samarth been delayed?
- No. December 2028 is the date first filed with the authority and it has not moved since.
- What does a flat in Samarth cost?
- Nothing has been registered in this project yet, so it has no price of its own. Units the same size elsewhere in Pune Camp have registered at ₹10,781–24,285 per square foot of carpet — the neighbourhood, not this building.
- How many flats are left in Samarth?
- 8 of 8 were still unsold at the promoter's last filing, in 2, 3 BHK, from 717–963 sq ft of carpet.
- Are there complaints against Samarth?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Samarth?
- Aarambh Constructions, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 16 September 2026. The authority's own page for PR1260002600396 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Pune Camp
Stock image
- Registered here
- ₹11,103
- Due
- Feb 2027
- Units
- 84
- Carpet
- 404–646
- Sold at
- ₹50.9 lakh
Stock image
- On offer
- Offices
- Due
- Dec 2028
- Units
- 38
- Carpet
- 3,342–8,092
- Sold at
- ₹27.6 crore
Stock image
- Valued from
- ₹7,663
- On offer
- Offices
- Due
- Dec 2026
- Units
- 22
- Carpet
- 666–1,206
- Sold at
- ₹1.1 crore