RERA registered PM1261012600060 Active
F Signature
Punawale, Pune · Mixed by Esvee Dream Homes LLP, Essen Landmarks
Official record Updated from the register 16 September 2026. Anything filed since then is not here yet.
In short
F Signature in Punawale is MahaRERA-registered (PM1261012600060) and still under construction, with possession filed for June 2030. Buyers have already registered 26 sales here at a median ₹11,150 per sq ft of carpet — not an asking price. About 5% of the 482 units are sold. Esvee Dream Homes LLP, Essen Landmarks is the promoter.
- Sold here at
- ₹11,150
- per sq ft, 26 registered sales
- Available
- 2 BHK, 3 BHK, Office Space, Shops
- 456 left · 637–4,216 sq ft
- Possession
- Jun 2030
- as filed with MahaRERA
Where this is
Punawale, PCMC, Pune, 411033
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Unit sizes on file
All 482 units are filed unit by unit with the authority, the highest on floor 28. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
2 BHK 299 units · 290 available
3 BHK 171 units · 154 available
Office Space 3 units · all available
3 units have no usable carpet area on file, so they are counted above but not drawn.
Shops 9 units · all available
26 / 482
5% absorption rate
Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.
2 BHK 299 units · 290 available
637 sq ft carpet as drawn, from 637–645 sq ft filed in this configuration
- Carpet, filed
- 637 sq ft
- Built-up
- about 764 sq ft
- Super built-up
- about 892 sq ft
Every room in this unit
Living and dining about 186 sq ft, Master bedroom about 124 sq ft, Second bedroom about 99 sq ft, Kitchen about 74 sq ft, Bath about 43 sq ft, Balcony about 43 sq ft, Second bath about 37 sq ft, Passage about 31 sq ft.
3 BHK 171 units · 154 available
902 sq ft carpet as drawn, from 819–904 sq ft filed in this configuration
- Carpet, filed
- 902 sq ft
- Built-up
- about 1,082 sq ft
- Super built-up
- about 1,263 sq ft
Every room in this unit
Living and dining about 222 sq ft, Master bedroom about 148 sq ft, Second bedroom about 118 sq ft, Third bedroom about 96 sq ft, Kitchen about 89 sq ft, Bath about 52 sq ft, Balcony about 52 sq ft, Second bath about 44 sq ft, Passage about 44 sq ft, Third bath about 37 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹8,852 to ₹12,045 per sq ft |
|---|---|
| Sold and booked | 1 sold, 25 booked |
| Still available | 456 units, 637–4216 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Stable projection
No delay reported in the latest RERA filings. Construction is recorded against the original baseline date the promoter registered.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Punawale |
|---|---|
| Taluka | Mulshi |
| Street, as filed | Punawale |
| Bounded north by | By Adjacent Gaothan |
| Bounded east by | By Adjacent plot no 2 and S no 10 (P) |
| Bounded south by | By 18 M D P Road and Plot no 3 |
| Bounded west by | By remaining area from S no 10 and 11 (P) |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Esvee Dream Homes LLP, Essen Landmarks |
|---|---|
| Registered office | Plot No. S23, Transport Nagari, Nigadi, Nigdi, Near Hotel Vridavan, Pune 411044 |
Professionals named on the filing
| Architect | Manoj Tatooskar CA/91/13744 |
|---|---|
| Engineer | Rohinee Badgujar |
| Chartered Accountant | Ms Rinkesh Gupta & Associates 079971 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report Format A Rera search pdf.pdf | 1 April 2026 |
|---|---|
| Conveyance deed REGISTERED EXCHANGE DEED Part 1.pdf | 1 April 2026 7 older versions on file |
| Promoter's declaration, Form B Form B.pdf | 1 April 2026 |
| Annexure A declaration Annexure A.pdf | 1 April 2026 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | PM1261012600060 |
| Promoter | Esvee Dream Homes LLP, Essen Landmarks |
| Project type | Mixed · Building development |
| Locality | Punawale — Mulshi taluka, pincode 411033 |
| Applied on | 02 April 2026 |
| Registered on | 10 April 2026 |
| Completion, as first filed | 30 June 2030 |
| Due | 30 June 2030 |
| Units declared | 482 |
| Units sold | 26 of 482 sold (5%), 456 still unsold |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 10 April 2026 |
| Application reference | ACK27032607623 |
| Current status | Active |
| Record last changed | 10 April 2026 · 5 months ago |
Where the sold count comes from, and whether it holds up. 26 of 482 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 482 units and reaches the same answer — 1 sold, every one with money recorded as received against a named unit, 25 booked with a price agreed but nothing received yet, and 456 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 10 April 2026.
Common questions
- Is F Signature registered with MahaRERA?
- Yes. It is registered as PM1261012600060, filed on 10 April 2026, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is F Signature due to be handed over?
- The promoter has told MahaRERA June 2030. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has F Signature been delayed?
- No. June 2030 is the date first filed with the authority and it has not moved since.
- What did buyers actually pay in F Signature?
- A median of ₹11,150 per square foot of carpet, across 26 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many units are left in F Signature?
- 456 of 482 were still unsold at the promoter's last filing, in 2, 3 BHK +2 more, from 637–4,216 sq ft of carpet.
- Are there complaints against F Signature?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building F Signature?
- Esvee Dream Homes LLP, Essen Landmarks, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 16 September 2026. The authority's own page for PM1261012600060 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Punawale
Stock image
- Registered here
- ₹8,974
- On offer
- 2, 3 BHK
- Due
- Dec 2026
- Units
- 42
- Carpet
- 595–819
- Sold at
- ₹72 lakh
Stock image
- Nearby
- ₹8,982–9,312
- On offer
- 2, 3 BHK + 1 RK
- Due
- Dec 2026
- Units
- 49
- Carpet
- 293–875
- Typical flat
- ~₹55.9 lakh
Stock image
- Nearby
- ₹8,982–9,312
- On offer
- 2, 3 BHK
- Due
- Dec 2030
- Units
- 58
- Carpet
- 709–952
- Typical flat
- ~₹72.1 lakh