RERA registered P52100076955 Active
Twilight Terrace
Pirangut, Pune · Residential / Group Housing by Shri Swami Samarath Developers
Official record Updated from the register 04 October 2026. Anything filed since then is not here yet.
In short
Twilight Terrace in Pirangut is MahaRERA-registered (P52100076955) and still under construction, with possession filed for July 2027. Buyers have already registered 18 sales here at a median ₹7,200 per sq ft of carpet — not an asking price. About 45% of the 40 units are sold. Shri Swami Samarath Developers is the promoter.
- Sold here at
- ₹7,200
- per sq ft, 18 registered sales
- Available
- 1, 2 BHK
- 22 left · 378–555 sq ft
- Now due
- Jul 2027
- 4 months later than first promised
Where this is
Pirangut, Rural, Pune, 412115
No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.
Flat sizes on file
All 40 flats are filed unit by unit with the authority, the highest on floor 4. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
1 BHK 16 units · 12 available
2 BHK 24 units · 10 available
18 / 40
45% absorption rate
Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
1 BHK 16 flats · 12 available
378 sq ft carpet as drawn, from 378–404 sq ft filed in this configuration
- Carpet, filed
- 378 sq ft
- Built-up
- about 454 sq ft
- Super built-up
- about 529 sq ft
Every room in this flat
Living and dining about 142 sq ft, Master bedroom about 94 sq ft, Kitchen about 57 sq ft, Bath about 33 sq ft, Balcony about 33 sq ft, Passage about 19 sq ft.
2 BHK 24 flats · 10 available
555 sq ft carpet as drawn, from 526–555 sq ft filed in this configuration
- Carpet, filed
- 555 sq ft
- Built-up
- about 666 sq ft
- Super built-up
- about 777 sq ft
Every room in this flat
Living and dining about 162 sq ft, Master bedroom about 108 sq ft, Second bedroom about 86 sq ft, Kitchen about 65 sq ft, Bath about 38 sq ft, Balcony about 38 sq ft, Second bath about 32 sq ft, Passage about 27 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹3,287 to ₹9,910 per sq ft |
|---|---|
| Sold and booked | 18 sold, 0 booked |
| Still available | 22 flats, 378–555 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Revised projection
The completion date has moved from March 2027 to July 2027, 4 months later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Taluka | Mulshi |
|---|---|
| Street, as filed | PAUD ROAD |
| Bounded north by | ADJ 251P |
| Bounded east by | 9M WIDE ROAD |
| Bounded south by | ADJ 259P |
| Bounded west by | ADJ 259P |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Shri Swami Samarath Developers |
|---|---|
| Registered office | 01, Swami Nivas, Bhugaon Road, Near Temple, Bhuagon, Pune 412115 |
Professionals named on the filing
| Architect | Yogiraj Associates PMRDA ENG 322 |
|---|---|
| Engineer | Shrikant Matre PMRDA ENG 359 |
| Chartered Accountant | Dinesh Kudale 141087 |
| Chartered Accountant | Sagar R Pujari & Associates 140060 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report Search 251 com.pdf | 27 June 2024 1 older version on file |
|---|---|
| Promoter's declaration, Form B Undertaking Form B.pdf | 27 February 2024 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100076955 |
| Promoter | Shri Swami Samarath Developers |
| Project type | Residential / Group Housing · Building development |
| Locality | Pirangut — Mulshi taluka, pincode 412115 |
| Applied on | 01 March 2024 |
| Registered on | 09 July 2024 |
| Completion, as first filed | 31 March 2027 |
| Due | 31 July 2027 4 months later |
| Units declared | 40 |
| Units sold | 18 of 40 sold (45%), 22 still unsold |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 09 July 2024 |
| Application reference | REA52100154932 |
| Current status | Active |
| Record last changed | 09 July 2024 · over 2 years ago 2 years untouched |
Where the sold count comes from, and whether it holds up. 18 of 40 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 40 flats and reaches the same answer — 18 sold, every one with money recorded as received against a named flat, and 22 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 09 July 2024.
MahaRERA has not recorded a change to this project's record in 2 years, while still listing it as under construction. That date moves on status changes and system updates as well as on anything the promoter files, so it is not proof the site is idle — but on a project still being sold, it is worth asking the promoter what has been filed since.
Common questions
- Is Twilight Terrace registered with MahaRERA?
- Yes. It is registered as P52100076955, filed on 09 July 2024, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Twilight Terrace due to be handed over?
- The promoter has told MahaRERA July 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Twilight Terrace been delayed?
- Yes. The first date filed was March 2027. It now stands at July 2027, 4 months later.
- What did buyers actually pay in Twilight Terrace?
- A median of ₹7,200 per square foot of carpet, across 18 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many flats are left in Twilight Terrace?
- 22 of 40 were still unsold at the promoter's last filing, in 1, 2 BHK, from 378–555 sq ft of carpet.
- Are there complaints against Twilight Terrace?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Twilight Terrace?
- Shri Swami Samarath Developers, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 04 October 2026. The authority's own page for P52100076955 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Pirangut
Stock image
- Due
- Jul 2029
- Units
- —
- Carpet
- —
- Typical flat
- —
Stock image
- Registered here
- ₹5,787
- On offer
- 2, 3 BHK
3 complaints
- Due
- Feb 2028
- Units
- 175
- Carpet
- 484–635
- Sold at
- ₹30.9 lakh
Stock image
Plot No. B-01 To B-21 Viva,Pirangut,Pune
Pact Real Estate Private Limited · Pirangut
- Due
- Nov 2026
- Units
- 21
- Carpet
- —
- Typical unit
- —