RERA registered P52100047282 Active
Presidential Tower
Pimple Saudagar, Pune · Residential / Group Housing by Govind Raviraj Developers LLP
Official record Updated from the register 16 September 2026. Anything filed since then is not here yet.
In short
Presidential Tower in Pimple Saudagar is MahaRERA-registered (P52100047282) and still under construction, with possession filed for December 2026. Buyers have already registered 105 sales here at a median ₹14,542 per sq ft of carpet — not an asking price. About 67% of the 170 units are sold. Govind Raviraj Developers LLP is the promoter.
- Sold here at
- ₹14,542
- per sq ft, 105 registered sales
- Available
- 2 BHK, 3 BHK, 4 BHK, Shops
- 56 left · 304–1,558 sq ft
- Possession
- Dec 2026
- as filed with MahaRERA
Where this is
Pimple Saudagar, PCMC, Pune, 411027
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Unit sizes on file
All 170 units are filed unit by unit with the authority, the highest on floor 24. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
2 BHK 18 units · all available
3 BHK 95 units · 25 available
4 BHK 47 units · 12 available
Shops 10 units · 1 available
114 / 170
67% absorption rate
Visual area guide See what the filed sizes feel like 3 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.
2 BHK 18 units · 18 available
484 sq ft carpet as drawn, from 484–493 sq ft filed in this configuration
- Carpet, filed
- 484 sq ft
- Built-up
- about 581 sq ft
- Super built-up
- about 678 sq ft
Every room in this unit
Living and dining about 141 sq ft, Master bedroom about 94 sq ft, Second bedroom about 75 sq ft, Kitchen about 56 sq ft, Bath about 33 sq ft, Balcony about 33 sq ft, Second bath about 28 sq ft, Passage about 23 sq ft.
3 BHK 95 units · 25 available
1,261 sq ft carpet as drawn, from 1,252–1,333 sq ft filed in this configuration
- Carpet, filed
- 1,261 sq ft
- Built-up
- about 1,513 sq ft
- Super built-up
- about 1,765 sq ft
Every room in this unit
Living and dining about 310 sq ft, Master bedroom about 207 sq ft, Second bedroom about 165 sq ft, Third bedroom about 134 sq ft, Kitchen about 124 sq ft, Bath about 72 sq ft, Balcony about 72 sq ft, Second bath about 62 sq ft, Passage about 62 sq ft, Third bath about 52 sq ft.
4 BHK 47 units · 12 available
1,555 sq ft carpet as drawn, from 1,555–1,562 sq ft filed in this configuration
- Carpet, filed
- 1,555 sq ft
- Built-up
- about 1,866 sq ft
- Super built-up
- about 2,177 sq ft
Every room in this unit
Living and dining about 346 sq ft, Master bedroom about 230 sq ft, Second bedroom about 184 sq ft, Third bedroom about 150 sq ft, Kitchen about 138 sq ft, Fourth bedroom about 138 sq ft, Bath about 81 sq ft, Balcony about 81 sq ft, Passage about 81 sq ft, Second bath about 69 sq ft, Third bath about 58 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹11,649 to ₹20,125 per sq ft |
|---|---|
| Sold and booked | 109 sold, 5 booked |
| Still available | 56 units, 279–1562 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
1 further sale is set aside. It divides out beyond ₹36,355 per sq ft, more than two and a half times this project's own median. A unit does not cost that much more than its neighbours on the same price list, so the usual cause is a carpet area filed too small for the agreement value printed beside it. Both figures are on the register exactly as shown — you can check them in the register itself — but no rate is computed from them here. Counted rather than quietly dropped.
Timeline audit
Stable projection
No delay reported in the latest RERA filings. Construction is recorded against the original baseline date the promoter registered.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Pimpale Saudagar · shown on this site as Pimple Saudagar |
|---|---|
| Taluka | Haveli |
| Street, as filed | PIMPLE SAUDAGAR |
| Bounded north by | CTS 1212 PART |
| Bounded east by | CTS 1211 PART |
| Bounded south by | 18 M ROAD |
| Bounded west by | CTS 1213 |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Govind Raviraj Developers LLP |
|---|---|
| Registered office | 1 To 5, Millenium Star Building, Dhole Patil Road, Ruby Hall, Pune 411001 |
Professionals named on the filing
| Architect | Arc Design Siddhi Sakla |
|---|---|
| Architect | Arc Liasoning Mahendra Thakur CA/2004/34769 |
| Architect | Dream space architect CA/2004/34769 |
| Engineer | Mahadev Todkar PEG/PMC/STE/2835/20 |
| Engineer | PLUMBING SACHIN Gurubheti |
| Engineer | Rcc Parag Chopada |
| Engineer | Vikas M Kale |
| Chartered Accountant | Agarwal Sarawgi and Associates 306478 |
| Chartered Accountant | Patel and Sharma 164398 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report 00 Revised SEARCH & TITLE REPORT_Adv VIJAY SHINDE_compressed.pdf | 24 September 2025 1 older version on file |
|---|---|
| Promoter's declaration, Form B FORM B_11zon.pdf | 30 August 2022 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100047282 |
| Promoter | Govind Raviraj Developers LLP |
| Project type | Residential / Group Housing · Building development |
| Locality | Pimple Saudagar — Haveli taluka, pincode 411027 |
| Applied on | 31 August 2022 |
| Registered on | 17 October 2022 |
| Completion, as first filed | 31 December 2026 |
| Due | 31 December 2026 |
| Units declared | 170 |
| Units sold | 114 of 170 sold (67%), 56 still unsold |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Corrected certificate, issued 13 August 2026 |
| Application reference | REA52100119230 |
| Current status | Active |
| Record last changed | 16 August 2025 · 13 months ago |
Where the sold count comes from, and whether it holds up. 114 of 170 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 170 units and reaches the same answer — 109 sold, every one with money recorded as received against a named unit, 5 booked with a price agreed but nothing received yet, and 56 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 16 August 2025.
Common questions
- Is Presidential Tower registered with MahaRERA?
- Yes. It is registered as P52100047282, filed on 17 October 2022, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Presidential Tower due to be handed over?
- The promoter has told MahaRERA December 2026. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Presidential Tower been delayed?
- No. December 2026 is the date first filed with the authority and it has not moved since.
- What did buyers actually pay in Presidential Tower?
- A median of ₹14,542 per square foot of carpet, across 105 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many units are left in Presidential Tower?
- 56 of 170 were still unsold at the promoter's last filing, in 2, 3, 4 BHK + shops, from 304–1,558 sq ft of carpet.
- Are there complaints against Presidential Tower?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Presidential Tower?
- Govind Raviraj Developers LLP, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 16 September 2026. The authority's own page for P52100047282 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Pimple Saudagar
Stock image
- Registered here
- ₹11,192
- On offer
- 2 BHK
- Due
- Mar 2027
- Units
- 16
- Carpet
- 657–820
- Sold at
- ₹73.8 lakh
Stock image
- Nearby
- ₹11,959–14,200
- On offer
- 2, 3, 4 BHK
- Due
- Dec 2029
- Units
- 65
- Carpet
- 643–2,406
- Typical flat
- ~₹1.3 crore
Stock image
- Registered here
- ₹14,073
- On offer
- 2, 3, 4, 6 BHK
- Due
- Oct 2030
- Units
- 284
- Carpet
- 769–3,200
- Sold at
- ₹1.2 crore