Z Zomefy

RERA registered PR1260002500378 Active

Shreenidhi

Pashan, Pune · Residential / Group Housing by Govind Eknath Kokate HUF

Official record Updated from the register 24 September 2026. Anything filed since then is not here yet.

In short

Shreenidhi in Pashan is MahaRERA-registered (PR1260002500378) and still under construction, with possession filed for December 2029. No sales are registered in this project yet. Units the same size elsewhere in Pashan have registered at ₹8,480–13,590 per sq ft of carpet — the neighbourhood, not this building. About 7% of the 28 units are sold. Govind Eknath Kokate HUF is the promoter.

Stock image, not a photograph of Shreenidhi Stock image
Where
Pashan
pincode 411021
Nearby at
₹8,480–13,590
per sq ft, same sizes in Pashan
Available
2, 3 BHK
26 left · 732–960 sq ft
Now due
Dec 2029
4 months later than first promised
A stock photograph, not Shreenidhi. We have no picture of this site yet.

Where this is

Pashan, PMC, Pune, 411021

Street map of Pashan centred on the coordinate filed for Shreenidhi, about 1.4 km across.
Streets within about 700 m of the pin the promoter filed. Map data © OpenStreetMap contributors.
Village
Pashan
Taluka
Haveli
Pincode
411021
Coordinates
18.541993, 73.781615

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 28 flats are filed unit by unit with the authority, the highest on floor 7. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

2 BHK 14 units · 12 available

14 units 732 sq ft 68.0 sq m as filed

3 BHK 14 units · all available

14 units 960 sq ft 89.19 sq m as filed
Units sold

2 / 28

Early sales

7% absorption rate

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

2 BHK 14 flats · 12 available

732 sq ft carpet as drawn

Carpet, filed
732 sq ft
Built-up
about 878 sq ft
Super built-up
about 1,025 sq ft
Every room in this flat

Living and dining about 213 sq ft, Master bedroom about 142 sq ft, Second bedroom about 114 sq ft, Kitchen about 85 sq ft, Bath about 50 sq ft, Balcony about 50 sq ft, Second bath about 43 sq ft, Passage about 36 sq ft.

3 BHK 14 flats · 14 available

960 sq ft carpet as drawn

Carpet, filed
960 sq ft
Built-up
about 1,152 sq ft
Super built-up
about 1,344 sq ft
Every room in this flat

Living and dining about 236 sq ft, Master bedroom about 157 sq ft, Second bedroom about 126 sq ft, Third bedroom about 102 sq ft, Kitchen about 94 sq ft, Bath about 55 sq ft, Balcony about 55 sq ft, Second bath about 47 sq ft, Passage about 47 sq ft, Third bath about 39 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What flats like these cost nearby

No sale has been registered at Shreenidhi yet. 2 agreements have been filed, which is too few to divide into a rate anyone should act on.

₹8,480–13,590 per sq ft of carpet, median of 673 registered sales of the same configurations in Pashan
On sale here Registered in Pashan Which for this size is
2 BHK 732 sq ft ₹8,480/sq ft 178 sales, 9 projects ₹62.1 lakh middle half ₹7,400–13,244/sq ft
3 BHK 960 sq ft ₹13,590/sq ft 495 sales, 11 projects ₹1.3 crore middle half ₹12,203–14,737/sq ft

Each rate is what buyers contracted to pay for the same configuration in Pashan, over the carpet area on the same filing. Floor and facing move a rate, and a project new on the register can open above or below what its neighbours sold at two years ago, so the last column is arithmetic rather than a quote. See every rate registered in Pashan.

The government's valuation of the unsold flats

On sale here Carpet Valued at no less than
2 BHK 12 unsold 732 sq ft ₹55.6 lakh ₹7,602/sq ft
3 BHK 14 unsold 960 sq ft ₹73 lakh ₹7,601/sq ft

This is the Annual Statement of Rates value the promoter filed against each unsold flat — the state's valuation, not an asking price and not a discount. Stamp duty is charged on whichever is higher, this or the agreement value, so nothing here can be registered below it. Read it as the floor under the price you will be quoted, which in most Pune localities sits well above it.

Timeline audit

Original proposed Aug 2029
Current status Due Dec 2029

Revised projection

The completion date has moved from August 2029 to December 2029, 4 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

S.No. 122/9 (Old), 5/9(NEW),CTS No.598, Plot No. A is the plot this project is built on, as filed
Revenue village Pashan
TalukaHaveli
Street, as filed Sutarwadi
Bounded north by CTS 597
Bounded east by CTS 600
Bounded south by CTS 606
Bounded west by CTS 596 AND CTS 603

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerGovind Eknath Kokate HUF
Registered officeS No 5/9, Sutarwadi Link Road, Sri Ahobila Muth Sri Balaji Mandir, Pashan, Pune 411021

Professionals named on the filing

Architect Trpti Gupta CA/2002/29372
Engineer Tirumala Constructions
Chartered Accountant Phule Wagh & Associates LLP 180704

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

21 March 2026 is when an advocate last certified the title to this land
Title report Search report revised.pdf 21 March 2026 1 older version on file
Conveyance deed 7-12 Extract Declaration.pdf 16 July 2025 2 older versions on file
Promoter's declaration, Form B Form B.pdf 15 July 2025
Annexure A declaration Declaration .pdf 15 July 2025

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberPR1260002500378
Promoter Govind Eknath Kokate HUF
Project typeResidential / Group Housing · Building development
LocalityPashan — Haveli taluka, pincode 411021
Applied on16 July 2025
Registered on28 July 2025
Completion, as first filed15 August 2029
Due15 December 2029 4 months later
Units declared28
Units sold 2 of 28 sold (7%), 26 still unsold
Complaints0 on record with MahaRERA
Certificate on file Corrected certificate, issued 11 May 2026
Application referenceACK05072501852
Current statusActive
Record last changed 23 March 2026 · 6 months ago

Where the sold count comes from, and whether it holds up. 2 of 28 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 28 flats and reaches the same answer — 2 sold, every one with money recorded as received against a named flat, and 26 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 23 March 2026.

Common questions

Is Shreenidhi registered with MahaRERA?
Yes. It is registered as PR1260002500378, filed on 28 July 2025, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Shreenidhi due to be handed over?
The promoter has told MahaRERA December 2029. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Shreenidhi been delayed?
Yes. The first date filed was August 2029. It now stands at December 2029, 4 months later.
What does a flat in Shreenidhi cost?
Nothing has been registered in this project yet, so it has no price of its own. Units the same size elsewhere in Pashan have registered at ₹8,480–13,590 per square foot of carpet — the neighbourhood, not this building.
How many flats are left in Shreenidhi?
26 of 28 were still unsold at the promoter's last filing, in 2, 3 BHK, from 732–960 sq ft of carpet.
Are there complaints against Shreenidhi?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Shreenidhi?
Govind Eknath Kokate HUF, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 24 September 2026. The authority's own page for PR1260002500378 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Pashan