Z Zomefy

RERA registered P52100051395 Active

Vijay Skyline

Nigdi, Pune · Residential / Group Housing by Chaya Realities

Official record Updated from the register 04 October 2026. Anything filed since then is not here yet.

In short

Vijay Skyline in Nigdi is MahaRERA-registered (P52100051395) and still under construction, with possession filed for July 2027. Buyers have already registered 5 sales here at a median ₹9,934 per sq ft of carpet — not an asking price. About 45% of the 11 units are sold. Chaya Realities is the promoter.

Stock image, not a photograph of Vijay Skyline Stock image
Where
Nigdi
pincode 411044
Sold here at
₹9,934
per sq ft, 5 registered sales
Available
3 BHK
6 left · 887–956 sq ft
Now due
Jul 2027
2.3 years later than first promised
A stock photograph, not Vijay Skyline. We have no picture of this site yet.

Where this is

Nigdi, Pune, 411044

Village
Pimpri Chinchawad (M Corp.)
Taluka
Haveli
Pincode
411044
Coordinates
18.651502, 73.775083

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 11 flats are filed unit by unit with the authority, the highest on floor 6. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

3 BHK 11 units · 6 available

5 units 887 sq ft 82.36 sq m as filed
5 units 956 sq ft 88.84 sq m as filed
1 unit 1843 sq ft 171.2 sq m as filed
Units sold

5 / 11

Selling steadily

45% absorption rate

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

3 BHK 11 flats · 6 available

887 sq ft carpet as drawn, from 887–1,843 sq ft filed in this configuration

Carpet, filed
887 sq ft
Built-up
about 1,064 sq ft
Super built-up
about 1,242 sq ft
Every room in this flat

Living and dining about 218 sq ft, Master bedroom about 145 sq ft, Second bedroom about 116 sq ft, Third bedroom about 95 sq ft, Kitchen about 87 sq ft, Bath about 51 sq ft, Balcony about 51 sq ft, Second bath about 44 sq ft, Passage about 44 sq ft, Third bath about 36 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹9,934 per sq ft of carpet, median of 5 registered sales
Range across those sales ₹8,366 to ₹10,847 per sq ft
Sold and booked 0 sold, 5 booked
Still available 6 flats, 887–1843 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Mar 2025
Current status Due Jul 2027

Revised projection

The completion date has moved from March 2025 to July 2027, 2.3 years later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

Sector No 27A Plot No 412 Akurdi Pradhikaran is the plot this project is built on, as filed
Revenue village Pimpri Chinchawad (M Corp.) · shown on this site as Nigdi
TalukaHaveli
Street, as filed Akurdi Pradhikaran
Bounded north by Compound wall
Bounded east by 24 M wide road
Bounded south by 24 M wide road
Bounded west by Compound wall

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerChaya Realities
Registered officeSector No 27A, Plot No 412, Akurdi Pradhikaran, Pimpri Chinchwad, Pcntda, Pune 411044

Professionals named on the filing

Architect Versatile Studio CA/2011/50998
Engineer Bharat Vitthal Chavan CHAVAN ENGINEERS AND CONTRACTORS
Engineer S K Consultants & Engineers STATE/R/2024/APL/14306
Chartered Accountant N B Sayed & Associates 631662
Chartered Accountant Reet Anand Meghrajani 513418
Chartered Accountant S U N S V G & Associates 112287

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

10 May 2023 is when an advocate last certified the title to this land
Title report Format A Legal search report.pdf 10 May 2023
Promoter's declaration, Form B FORM B.pdf 23 April 2025 1 older version on file

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100051395
Promoter Chaya Realities
Project typeResidential / Group Housing · Building development
LocalityNigdi — Haveli taluka, pincode 411044
Applied on12 May 2023
Registered on08 June 2023
Completion, as first filed31 March 2025
Due31 July 2027 2.3 years later
Units declared11
Units sold 5 of 11 sold (45%), 6 still unsold
Complaints0 on record with MahaRERA
Certificate on file Extension certificate, issued 20 August 2026
Application referenceREA52100138828
Current statusActive
Record last changed 08 June 2026 · 4 months ago

Where the sold count comes from, and whether it holds up. 5 of 11 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 11 flats and reaches the same answer — 0 sold, 5 booked with a price agreed but nothing received yet, and 6 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 08 June 2026.

Common questions

Is Vijay Skyline registered with MahaRERA?
Yes. It is registered as P52100051395, filed on 08 June 2023, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Vijay Skyline due to be handed over?
The promoter has told MahaRERA July 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Vijay Skyline been delayed?
Yes. The first date filed was March 2025. It now stands at July 2027, 2.3 years later.
What did buyers actually pay in Vijay Skyline?
A median of ₹9,934 per square foot of carpet, across 5 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Vijay Skyline?
6 of 11 were still unsold at the promoter's last filing, in 3 BHK, from 887–956 sq ft of carpet.
Are there complaints against Vijay Skyline?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Vijay Skyline?
Chaya Realities, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 04 October 2026. The authority's own page for P52100051395 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Nigdi