Z Zomefy

RERA registered PR1260002501663 Active

Shivkunj

Narayangaon, Pune · Residential / Group Housing by Durva Developers

Official record Updated from the register 04 October 2026. Anything filed since then is not here yet.

In short

Shivkunj in Narayangaon is MahaRERA-registered (PR1260002501663) and still under construction, with possession filed for January 2029. Buyers have already registered 4 sales here at a median ₹3,982 per sq ft of carpet — not an asking price. About 6% of the 72 units are sold. Durva Developers is the promoter.

Stock image, not a photograph of Shivkunj Stock image
Where
Narayangaon
pincode 410504
Sold here at
₹3,982
per sq ft, 4 registered sales
Available
2 BHK
40 left · 715–770 sq ft
Now due
Jan 2029
4 months later than first promised
A stock photograph, not Shivkunj. We have no picture of this site yet.

Where this is

Narayangaon, Junnar, Pune, 410504

Street map of Narayangaon centred on the coordinate filed for Shivkunj, about 1.4 km across.
Streets within about 700 m of the pin the promoter filed. Map data © OpenStreetMap contributors.
Village
Narayangaon
Taluka
Junnar
Pincode
410504
Coordinates
19.117785, 73.974070

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 72 flats are filed unit by unit with the authority, the highest on floor 6. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

2 BHK 72 units · 40 available

12 units 635 sq ft 59.0 sq m as filed
12 units 715 sq ft 66.43 sq m as filed
12 units 730 sq ft 67.85 sq m as filed
12 units 741 sq ft 68.85 sq m as filed
24 units 770 sq ft 71.53 sq m as filed
Units sold

4 / 72

Early sales

6% absorption rate

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

2 BHK 72 flats · 40 available

770 sq ft carpet as drawn, from 635–770 sq ft filed in this configuration

Carpet, filed
770 sq ft
Built-up
about 924 sq ft
Super built-up
about 1,078 sq ft
Every room in this flat

Living and dining about 224 sq ft, Master bedroom about 150 sq ft, Second bedroom about 120 sq ft, Kitchen about 90 sq ft, Bath about 52 sq ft, Balcony about 52 sq ft, Second bath about 45 sq ft, Passage about 37 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹3,982 per sq ft of carpet, median of 4 registered sales
Range across those sales ₹3,896 to ₹4,363 per sq ft
Sold and booked 4 sold, 0 booked
Still available 40 flats, 635–770 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Sep 2028
Current status Due Jan 2029

Revised projection

The completion date has moved from September 2028 to January 2029, 4 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

S No 289 Gat No 289/3 289/10 290/4 290/5 & 290/6 Narayangaon is the plot this project is built on, as filed
Revenue village Narayangaon
TalukaJunnar
Bounded north by Adjacent road
Bounded east by Adjacent 290P
Bounded south by Adjacent S No 291P
Bounded west by Pune Nashik Highway

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerDurva Developers
Registered officeMilkat No-1054/32, Shop No-G 23, Fulsundar Market, Narayangaon, Junnar, Pune 410504

Professionals named on the filing

Architect Vision Architects CA/08/42879
Engineer Vivek Naik
Chartered Accountant C M Ambore and Company 634797
Chartered Accountant Mangesh Surwase and CO. 608533

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

21 November 2025 is when an advocate last certified the title to this land
Title report Format A Legal title report corrected.pdf 21 November 2025
Promoter's declaration, Form B FORM B promoter.pdf 30 October 2025
Annexure A declaration Declaration Cum undertaking Annexure A.pdf 30 October 2025

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberPR1260002501663
Promoter Durva Developers
Project typeResidential / Group Housing · Building development
LocalityNarayangaon — Junnar taluka, pincode 410504
Applied on31 October 2025
Registered on03 December 2025
Completion, as first filed30 September 2028
Due30 January 2029 4 months later
Units declared72
Units sold 4 of 72 sold (6%), 68 still unsold
Complaints0 on record with MahaRERA
Certificate on file Original registration certificate, issued 03 December 2025
Application referenceACK19102504116
Current statusActive
Record last changed 08 June 2026 · 4 months ago

Where the sold count comes from, and whether it holds up. 4 of 72 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 72 flats and reaches the same answer — 4 sold, every one with money recorded as received against a named flat, and 40 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 08 June 2026.

Common questions

Is Shivkunj registered with MahaRERA?
Yes. It is registered as PR1260002501663, filed on 03 December 2025, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Shivkunj due to be handed over?
The promoter has told MahaRERA January 2029. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Shivkunj been delayed?
Yes. The first date filed was September 2028. It now stands at January 2029, 4 months later.
What did buyers actually pay in Shivkunj?
A median of ₹3,982 per square foot of carpet, across 4 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Shivkunj?
40 of 72 were still unsold at the promoter's last filing, in 2 BHK, from 715–770 sq ft of carpet.
Are there complaints against Shivkunj?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Shivkunj?
Durva Developers, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 04 October 2026. The authority's own page for PR1260002501663 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Narayangaon

Stock image, not a photograph of Silver Park Stock image
Nearby
₹4,057
On offer
1 BHK
Under construction

Silver Park

Jaihind Properties · Narayangaon

0 sold

1 complaint

Due
Dec 2027
Units
1
Carpet
462
Typical flat
~₹18.7 lakh
P52100028984
Stock image, not a photograph of Suyog Samrajya Stock image
Nearby
₹4,048–4,057
On offer
1, 2, 3 BHK +2 more
Under construction

Suyog Samrajya

Ashirwad Infrastructures · Narayangaon

0 sold
Slipped 4 months
Due
Apr 2028
Units
279
Carpet
108–931
Typical unit
~₹15.3 lakh
P52100076678