RERA registered P52100056095 Active
Supreme Towers Phase Ii
Mundhwa, Pune · Residential / Group Housing by Eastwood Realty LLP
Official record Updated from the register 24 September 2026. Anything filed since then is not here yet.
In short
Supreme Towers Phase Ii in Mundhwa is MahaRERA-registered (P52100056095) and still under construction, with possession filed for June 2029. Buyers have already registered 63 sales here at a median ₹21,884 per sq ft of carpet — not an asking price. 1 complaint sits on the filing. Eastwood Realty LLP is the promoter.
- Sold here at
- ₹21,884
- per sq ft, 63 registered sales
- Available
- 2 BHK, 3 BHK, 4 BHK, Duplex
- 50 left · 1,064–3,555 sq ft
- Possession
- Jun 2029
- as filed with MahaRERA
Where this is
Mundhwa, PMC, Pune, 411036
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Flat sizes on file
All 123 flats are filed unit by unit with the authority, the highest on floor 32. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
2 BHK 6 units · 5 available
3 BHK 58 units · 18 available
4 BHK 55 units · 23 available
Duplex 4 units · all available
50 / 123
41% absorption rate · the promoter's two filings disagree
Visual area guide See what the filed sizes feel like 3 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
2 BHK 6 flats · 5 available
1,064 sq ft carpet as drawn
- Carpet, filed
- 1,064 sq ft
- Built-up
- about 1,277 sq ft
- Super built-up
- about 1,490 sq ft
Every room in this flat
Living and dining about 310 sq ft, Master bedroom about 207 sq ft, Second bedroom about 165 sq ft, Kitchen about 124 sq ft, Bath about 72 sq ft, Balcony about 72 sq ft, Second bath about 62 sq ft, Passage about 52 sq ft.
3 BHK 58 flats · 18 available
1,292 sq ft carpet as drawn, from 1,292–1,306 sq ft filed in this configuration
- Carpet, filed
- 1,292 sq ft
- Built-up
- about 1,550 sq ft
- Super built-up
- about 1,809 sq ft
Every room in this flat
Living and dining about 318 sq ft, Master bedroom about 212 sq ft, Second bedroom about 169 sq ft, Third bedroom about 138 sq ft, Kitchen about 127 sq ft, Bath about 74 sq ft, Balcony about 74 sq ft, Second bath about 64 sq ft, Passage about 64 sq ft, Third bath about 53 sq ft.
4 BHK 55 flats · 23 available
1,937 sq ft carpet as drawn, from 1,937–1,954 sq ft filed in this configuration
- Carpet, filed
- 1,937 sq ft
- Built-up
- about 2,324 sq ft
- Super built-up
- about 2,712 sq ft
Every room in this flat
Living and dining about 430 sq ft, Master bedroom about 287 sq ft, Second bedroom about 230 sq ft, Third bedroom about 187 sq ft, Kitchen about 172 sq ft, Fourth bedroom about 172 sq ft, Bath about 100 sq ft, Balcony about 100 sq ft, Passage about 100 sq ft, Second bath about 86 sq ft, Third bath about 72 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹18,266 to ₹24,365 per sq ft |
|---|---|
| Sold and booked | 43 sold, 20 booked |
| Still available | 50 flats, 1064–3555 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Stable projection
No delay reported in the latest RERA filings. Construction is recorded against the original baseline date the promoter registered.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Mundhawa · shown on this site as Mundhwa |
|---|---|
| Taluka | Haveli |
| Street, as filed | Koregaon Park Mundhwa Raod |
| Bounded north by | Adj S no 81 82 Part |
| Bounded east by | 12m Internal road |
| Bounded south by | T1 Tower |
| Bounded west by | Open Space |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Eastwood Realty LLP |
|---|---|
| Registered office | 1404/05, 14th Floor, 1404, B Wing Amar Business Zone, Mahalunge Baner Road, Amar Business Zone, Baner, Pune 411045 |
Professionals named on the filing
| Architect | Architect Rushikesh H CA/1998/23423 |
|---|---|
| Architect | Rushikesh H CA/1998/23423 |
| Engineer | Amit Jayprakash Bille |
| Engineer | Shashank Kesare |
| Engineer | Shashank Kesare |
| Chartered Accountant | A N J K & Co LLP |
| Chartered Accountant | ANJK and Co LLP 182099 |
| Chartered Accountant | JASJIT and Co 149247 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Complaints filed with MahaRERA
1 case against this project, 1 with an order on record. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.
| Case number | Filed | Outcome |
|---|---|---|
| SM12600545 | Jul 2026 | Order passed Jul 2026 |
A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.
Title and ownership papers
| Title report Search and title report.pdf | 10 April 2024 |
|---|---|
| Promoter's declaration, Form B FORM B.pdf | 10 April 2024 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100056095 |
| Promoter | Eastwood Realty LLP |
| Project type | Residential / Group Housing · Building development |
| Locality | Mundhwa — Haveli taluka, pincode 411036 |
| Applied on | 15 April 2024 |
| Registered on | 10 May 2024 |
| Completion, as first filed | 30 June 2029 |
| Due | 30 June 2029 |
| Units declared | 123 |
| Units sold | 50 of 123 sold (41%), 73 still unsoldfilings disagree |
| Complaints | 1 on record with MahaRERA |
| Certificate on file | Corrected certificate, issued 20 August 2026 |
| Application reference | REA52100157271 |
| Current status | Active |
| Record last changed | 06 May 2026 · 5 months ago |
Where the sold count comes from, and whether it holds up. 50 of 123 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. And here the promoter's two filings do not agree. The quarterly report says 50 of 123 sold, leaving 73. The unit-by-unit list they file separately covers 123 flats and marks 43 sold with 50 left. We show both rather than quietly pick one, and the number to distrust is what is still available — ask the promoter which filing is current before believing a flat is free. Either way, this is only as current as the last change to the record, 06 May 2026.
Common questions
- Is Supreme Towers Phase Ii registered with MahaRERA?
- Yes. It is registered as P52100056095, filed on 10 May 2024, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Supreme Towers Phase Ii due to be handed over?
- The promoter has told MahaRERA June 2029. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Supreme Towers Phase Ii been delayed?
- No. June 2029 is the date first filed with the authority and it has not moved since.
- What did buyers actually pay in Supreme Towers Phase Ii?
- A median of ₹21,884 per square foot of carpet, across 63 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many flats are left in Supreme Towers Phase Ii?
- 50 of 123 were still unsold at the promoter's last filing, in 2, 3, 4 BHK + duplex, from 1,064–3,555 sq ft of carpet.
- Are there complaints against Supreme Towers Phase Ii?
- 1 case has been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
- Who is building Supreme Towers Phase Ii?
- Eastwood Realty LLP, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 24 September 2026. The authority's own page for P52100056095 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Mundhwa
Stock image
- Registered here
- ₹4,805
- On offer
- 1 BHK
- Due
- Apr 2030
- Units
- 87
- Carpet
- 384–388
- Sold at
- ₹18.7 lakh
Stock image
- Registered here
- ₹10,666
- On offer
- 2 BHK
1 complaint
- Due
- Oct 2026
- Units
- 88
- Carpet
- 786
- Sold at
- ₹83.4 lakh
Stock image
- Registered here
- ₹8,813
- On offer
- 2 BHK +2 more
- Due
- Jul 2027
- Units
- 128
- Carpet
- 534–8,459
- Sold at
- ₹70 lakh