Karma Iconic

Mundhwa, Pune · Residential / Group Housing by Karma Builders

Official record Updated from the register 16 September 2026. Anything filed since then is not here yet.

In short

Karma Iconic in Mundhwa is MahaRERA-registered (P52100026329) and still under construction, with possession filed for June 2027. Buyers have already registered 79 sales here at a median ₹7,334 per sq ft of carpet — not an asking price. About 49% of the 162 units are sold. 3 complaints sit on the filing. Karma Builders is the promoter.

Stock image, not a photograph of Karma Iconic Stock image
Where
Mundhwa
pincode 411036
Sold here at
₹7,334
per sq ft, 79 registered sales
Available
2, 3 BHK
57 left · 602–638 sq ft
Now due
Jun 2027
2 years later than first promised
A stock photograph, not Karma Iconic. We have no picture of this site yet.

Where this is

Mundhwa, PMC, Pune, 411036

Street map of Mundhwa centred on the coordinate filed for Karma Iconic, about 1.4 km across.
Streets within about 700 m of the pin the promoter filed. Map data © OpenStreetMap contributors.
Village
Mundhawa
Taluka
Haveli
Pincode
411036
Coordinates
19.387500, 75.163200

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 162 flats are filed unit by unit with the authority, the highest on floor 14. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

2 BHK 106 units · 27 available

8 units 602 sq ft 55.93 sq m as filed
98 units 610 sq ft 56.7 sq m as filed

3 BHK 56 units · 30 available

4 units 634 sq ft 58.89 sq m as filed
52 units 638 sq ft 59.23 sq m as filed
Units sold

79 / 162

Selling steadily

49% absorption rate

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

2 BHK 106 flats · 27 available

610 sq ft carpet as drawn, from 602–610 sq ft filed in this configuration

Carpet, filed
610 sq ft
Built-up
about 732 sq ft
Super built-up
about 854 sq ft
Every room in this flat

Living and dining about 178 sq ft, Master bedroom about 118 sq ft, Second bedroom about 95 sq ft, Kitchen about 71 sq ft, Bath about 41 sq ft, Balcony about 41 sq ft, Second bath about 36 sq ft, Passage about 30 sq ft.

3 BHK 56 flats · 30 available

638 sq ft carpet as drawn, from 634–638 sq ft filed in this configuration

Carpet, filed
638 sq ft
Built-up
about 766 sq ft
Super built-up
about 893 sq ft
Every room in this flat

Living and dining about 157 sq ft, Master bedroom about 105 sq ft, Second bedroom about 84 sq ft, Third bedroom about 68 sq ft, Kitchen about 63 sq ft, Bath about 37 sq ft, Balcony about 37 sq ft, Second bath about 31 sq ft, Passage about 31 sq ft, Third bath about 26 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹7,334 per sq ft of carpet, median of 79 registered sales
Range across those sales ₹6,120 to ₹15,685 per sq ft
Sold and booked 77 sold, 2 booked
Still available 57 flats, 602–638 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Jun 2025
Current status Due Jun 2027

Revised projection

The completion date has moved from June 2025 to June 2027, 2 years later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

S. NO. 9 TO 14 HISSA NO 1/61 PART is the plot this project is built on, as filed
Revenue village Mundhawa · shown on this site as Mundhwa
TalukaHaveli
Street, as filed KESHAVNAGAR
Bounded north by BY LAND BELONGING TO THE MUNICIPAL CORPORATION
Bounded east by BY 9 TO 14 HISSA NO 1-62 MUNDHAWA
Bounded south by BY 24 METER WIDE D P ROAD
Bounded west by BY S NO 9 TO 14 HISSA NO 1-60 MUNDHAWA

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerKarma Builders
Registered office2 D & E, Second Floor, Gulmohar Apartments, East Street, Above State Bank Of India, Camp, Pune 411001

Professionals named on the filing

Architect M/S A Design Studio CA/2005/36501
Engineer Gauri dhananjay Walhekar
Engineer Kailas Namdeo Nazirkar
Engineer Prkash Sitaram Choudhari PMC1627
Chartered Accountant Dipti Nitin Laddha 144098
Chartered Accountant Rajkumar Rajput 601634

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Complaints filed with MahaRERA

3 cases against this project, 2 with an order on record, filed between Jul 2025 and Aug 2026. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.

Case numberFiledOutcome
CC12605103 Aug 2026 No order on record
CC12503718 Oct 2025 Order passed Oct 2025
CC12502574 Jul 2025 Order passed Jul 2025

A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.

Title and ownership papers

3 March 2020 is when an advocate last certified the title to this land
Title report Legal Title Report .pdf 3 March 2020
Promoter's declaration, Form B form b .pdf 7 June 2025 1 older version on file

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100026329
Promoter Karma Builders
Project typeResidential / Group Housing · Building development
LocalityMundhwa — Haveli taluka, pincode 411036
Applied on04 September 2020
Registered on11 September 2020
Completion, as first filed30 June 2025
Due30 June 2027 2 years later
Units declared162
Units sold 79 of 162 sold (49%), 83 still unsold
Complaints3 on record with MahaRERA
Certificate on file Extension certificate, issued 09 July 2026
Application referenceREA52100075931
Current statusActive
Record last changed 17 August 2026 · 30 days ago

Where the sold count comes from, and whether it holds up. 79 of 162 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 162 flats and reaches the same answer — 77 sold, every one with money recorded as received against a named flat, 2 booked with a price agreed but nothing received yet, and 57 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 17 August 2026.

Common questions

Is Karma Iconic registered with MahaRERA?
Yes. It is registered as P52100026329, filed on 11 September 2020, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Karma Iconic due to be handed over?
The promoter has told MahaRERA June 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Karma Iconic been delayed?
Yes. The first date filed was June 2025. It now stands at June 2027, 2 years later.
What did buyers actually pay in Karma Iconic?
A median of ₹7,334 per square foot of carpet, across 79 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Karma Iconic?
57 of 162 were still unsold at the promoter's last filing, in 2, 3 BHK, from 602–638 sq ft of carpet.
Are there complaints against Karma Iconic?
3 cases have been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
Who is building Karma Iconic?
Karma Builders, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 16 September 2026. The authority's own page for P52100026329 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.