K City Phase 3

Mundhwa, Pune · Residential / Group Housing by Unique Triaa Ventures

Official record Updated from the register 21 September 2026. Anything filed since then is not here yet.

In short

K City Phase 3 in Mundhwa is MahaRERA-registered (P52100052901) and still under construction, with possession filed for April 2029. Buyers have already registered 252 sales here at a median ₹9,246 per sq ft of carpet — not an asking price. Unique Triaa Ventures is the promoter.

Stock image, not a photograph of K City Phase 3 Stock image
Where
Mundhwa
pincode 411036
Sold here at
₹9,246
per sq ft, 252 registered sales
Available
3 BHK
4 left · 881 sq ft
Now due
Apr 2029
4 months later than first promised
A stock photograph, not K City Phase 3. We have no picture of this site yet.

Where this is

Mundhwa, PMC, Pune, 411036

Village
Mundhawa
Taluka
Haveli
Pincode
411036

The promoter filed a coordinate that falls outside Pune district, so it is not used here. The link above searches Maps by name and locality instead.

Flat sizes on file

All 256 flats are filed unit by unit with the authority, the highest on floor 13. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

2 BHK 128 units · all sold

128 units 680 sq ft 63.17 sq m as filed

3 BHK 128 units · 4 available

102 units 881 sq ft 81.81 sq m as filed
26 units 913 sq ft 84.78 sq m as filed
Units sold

197 / 256

Selling steadily

77% absorption rate · the promoter's two filings disagree

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

2 BHK 128 flats · none available

680 sq ft carpet as drawn

Carpet, filed
680 sq ft
Built-up
about 816 sq ft
Super built-up
about 952 sq ft
Every room in this flat

Living and dining about 198 sq ft, Master bedroom about 132 sq ft, Second bedroom about 106 sq ft, Kitchen about 79 sq ft, Bath about 46 sq ft, Balcony about 46 sq ft, Second bath about 40 sq ft, Passage about 33 sq ft.

3 BHK 128 flats · 4 available

881 sq ft carpet as drawn, from 881–913 sq ft filed in this configuration

Carpet, filed
881 sq ft
Built-up
about 1,057 sq ft
Super built-up
about 1,233 sq ft
Every room in this flat

Living and dining about 217 sq ft, Master bedroom about 144 sq ft, Second bedroom about 116 sq ft, Third bedroom about 94 sq ft, Kitchen about 87 sq ft, Bath about 51 sq ft, Balcony about 51 sq ft, Second bath about 43 sq ft, Passage about 43 sq ft, Third bath about 36 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹9,246 per sq ft of carpet, median of 252 registered sales
Range across those sales ₹6,553 to ₹11,195 per sq ft
Sold and booked 252 sold, 0 booked
Still available 4 flats, 680–913 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Dec 2028
Current status Due Apr 2029

Revised projection

The completion date has moved from December 2028 to April 2029, 4 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

S. No. 37/3A is the plot this project is built on, as filed
Revenue village Mundhawa · shown on this site as Mundhwa
TalukaHaveli
Street, as filed Near Renuka Mata Mandir
Bounded north by F Wing
Bounded east by Sr No 37 P
Bounded south by Open Space
Bounded west by Sr No 37 P

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerUnique Triaa Ventures
Registered office401 A, 401, City Bay, Dhole Patil, Boat Club Road, Pune 411001

Professionals named on the filing

Architect Hirak Shah CA/2004/32903
Engineer Sujit Suryawanshi REG/PMC/TEMP/0099/25
Chartered Accountant Darshan Shah 135271
Chartered Accountant Deo & Company 627486

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

5 September 2023 is when an advocate last certified the title to this land
Title report Title Search Report Annexure.PDF 5 September 2023 1 older version on file
Promoter's declaration, Form B Form B.pdf 22 August 2023

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100052901
Promoter Unique Triaa Ventures
Project typeResidential / Group Housing · Building development
LocalityMundhwa — Haveli taluka, pincode 411036
Applied on22 August 2023
Registered on05 October 2023
Completion, as first filed31 December 2028
Due30 April 2029 4 months later
Units declared256
Units sold 197 of 256 sold (77%), 59 still unsoldfilings disagree
Complaints0 on record with MahaRERA
Certificate on file Corrected certificate, issued 20 August 2026
Application referenceREA52100145168
Current statusActive
Record last changed 03 February 2026 · 8 months ago

Where the sold count comes from, and whether it holds up. 197 of 256 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. And here the promoter's two filings do not agree. The quarterly report says 197 of 256 sold, leaving 59. The unit-by-unit list they file separately covers 256 flats and marks 252 sold with 4 left. We show both rather than quietly pick one, and the number to distrust is what is still available — ask the promoter which filing is current before believing a flat is free. Either way, this is only as current as the last change to the record, 03 February 2026.

Common questions

Is K City Phase 3 registered with MahaRERA?
Yes. It is registered as P52100052901, filed on 05 October 2023, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is K City Phase 3 due to be handed over?
The promoter has told MahaRERA April 2029. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has K City Phase 3 been delayed?
Yes. The first date filed was December 2028. It now stands at April 2029, 4 months later.
What did buyers actually pay in K City Phase 3?
A median of ₹9,246 per square foot of carpet, across 252 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in K City Phase 3?
4 of 256 were still unsold at the promoter's last filing, in 3 BHK, from 881 sq ft of carpet.
Are there complaints against K City Phase 3?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building K City Phase 3?
Unique Triaa Ventures, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 21 September 2026. The authority's own page for P52100052901 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Mundhwa

Stock image, not a photograph of Blossom Park Building A Stock image
Registered here
₹9,758
On offer
2 BHK
Under construction

Blossom Park Building A

Kodre Ventures Prop Amit Prakash Kodre · Mundhwa

67 sold
Slipped 4 months
Due
Apr 2028
Units
48
Carpet
809–847
Sold at
₹80.3 lakh
P52100080586