RERA registered PM1260002501385 Active
Godrej Elaris
Mundhwa, Pune · Mixed by Godrej Properties Limited
Official record Updated from the register 21 September 2026. Anything filed since then is not here yet.
In short
Godrej Elaris in Mundhwa is MahaRERA-registered (PM1260002501385) and still under construction, with possession filed for September 2032. Buyers have already registered 316 sales here at a median ₹16,361 per sq ft of carpet — not an asking price. 2 complaints sit on the filing. Godrej Properties Limited is the promoter.
- Sold here at
- ₹16,361
- per sq ft, 316 registered sales
- Available
- 2 BHK, 3 BHK, 4 BHK, Shops
- 618 left · 700–2,307 sq ft
- Now due
- Sep 2032
- 4 months later than first promised
Where this is
Mundhwa, PMC, Pune, 411036
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Unit sizes on file
All 972 units are filed unit by unit with the authority, the highest on floor 33. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
2 BHK 290 units · 200 available
3 BHK 385 units · 229 available
4 BHK 212 units · 142 available
Shops 85 units · 47 available
64 further sizes, 64 units between them
275 / 972
28% absorption rate · the promoter's two filings disagree
Visual area guide See what the filed sizes feel like 3 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.
2 BHK 290 units · 200 available
811 sq ft carpet as drawn, from 811–1,044 sq ft filed in this configuration
- Carpet, filed
- 811 sq ft
- Built-up
- about 973 sq ft
- Super built-up
- about 1,135 sq ft
Every room in this unit
Living and dining about 236 sq ft, Master bedroom about 157 sq ft, Second bedroom about 126 sq ft, Kitchen about 94 sq ft, Bath about 55 sq ft, Balcony about 55 sq ft, Second bath about 47 sq ft, Passage about 39 sq ft.
3 BHK 385 units · 229 available
1,046 sq ft carpet as drawn, from 985–1,521 sq ft filed in this configuration
- Carpet, filed
- 1,046 sq ft
- Built-up
- about 1,255 sq ft
- Super built-up
- about 1,464 sq ft
Every room in this unit
Living and dining about 257 sq ft, Master bedroom about 171 sq ft, Second bedroom about 137 sq ft, Third bedroom about 111 sq ft, Kitchen about 103 sq ft, Bath about 60 sq ft, Balcony about 60 sq ft, Second bath about 51 sq ft, Passage about 51 sq ft, Third bath about 43 sq ft.
4 BHK 212 units · 142 available
1,782 sq ft carpet as drawn, from 1,314–1,782 sq ft filed in this configuration
- Carpet, filed
- 1,782 sq ft
- Built-up
- about 2,138 sq ft
- Super built-up
- about 2,495 sq ft
Every room in this unit
Living and dining about 396 sq ft, Master bedroom about 264 sq ft, Second bedroom about 211 sq ft, Third bedroom about 172 sq ft, Kitchen about 158 sq ft, Fourth bedroom about 158 sq ft, Bath about 92 sq ft, Balcony about 92 sq ft, Passage about 92 sq ft, Second bath about 79 sq ft, Third bath about 66 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹15,212 to ₹18,356 per sq ft |
|---|---|
| Sold and booked | 224 sold, 130 booked |
| Still available | 618 units, 196–2307 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
18 further sales are set aside. They divide out beyond ₹40,902 per sq ft, more than two and a half times this project's own median. A unit does not cost that much more than its neighbours on the same price list, so the usual cause is a carpet area filed too small for the agreement value printed beside it. Both figures are on the register exactly as shown — you can check them in the register itself — but no rate is computed from them here. Counted rather than quietly dropped.
Timeline audit
Revised projection
The completion date has moved from May 2032 to September 2032, 4 months later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Mundhwa South · shown on this site as Mundhwa |
|---|---|
| Taluka | Pune City |
| Street, as filed | Mundhwa |
| Bounded north by | S.No.46(part) |
| Bounded east by | S.No.45, 47 and 48 |
| Bounded south by | S.No.46(part) |
| Bounded west by | S.No.64 and 65 |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Godrej Properties Limited |
|---|---|
| Registered office | 5, Godrej One, Eastern Express Highway, Pirojshanagar, Vikhroli East, Mumbai Suburban 400079 |
| Registered agents | 6 licensed agents may sell this project |
Professionals named on the filing
| Architect | Gaurav Sanan CA-99/25531 |
|---|---|
| Engineer | Samartha Constro Consultants LLP AAO-5239 |
| Chartered Accountant | Omkar Deshpande 166637 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Complaints filed with MahaRERA
2 cases against this project, 2 with an order on record, filed between Feb 2026 and Feb 2026. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.
| Case number | Filed | Outcome |
|---|---|---|
| CC12601010 | Feb 2026 | Order passed Feb 2026 |
| CC12600726 | Feb 2026 | Order passed Feb 2026 |
A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.
Title and ownership papers
| Title report RERA Issued Memo - Mundhwa - Godrej - 27102025_compressed.pdf | 28 October 2025 |
|---|---|
| Conveyance deed Deed of Conveyance-GPL-Classic.pdf | 28 October 2025 3 older versions on file |
| Promoter's declaration, Form B Form B_rotated.pdf | 29 October 2025 |
| Annexure A declaration 36 Declaration Cum Undertaking Annexure A (1).pdf | 28 October 2025 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | PM1260002501385 |
| Promoter | Godrej Properties Limited |
| Project type | Mixed · Building development |
| Locality | Mundhwa — Pune City taluka, pincode 411036 |
| Applied on | 28 October 2025 |
| Registered on | 03 November 2025 |
| Completion, as first filed | 16 May 2032 |
| Due | 16 September 2032 4 months later |
| Units declared | 972 |
| Units sold | 275 of 972 sold (28%), 697 still unsoldfilings disagree |
| Complaints | 2 on record with MahaRERA |
| Certificate on file | Corrected certificate, issued 05 June 2026 |
| Application reference | ACK07102503873 |
| Current status | Active |
| Record last changed | 02 June 2026 · 4 months ago |
Where the sold count comes from, and whether it holds up. 275 of 972 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. And here the promoter's two filings do not agree. The quarterly report says 275 of 972 sold, leaving 697. The unit-by-unit list they file separately covers 972 units and marks 224 sold with 618 left. We show both rather than quietly pick one, and the number to distrust is what is still available — ask the promoter which filing is current before believing a unit is free. Either way, this is only as current as the last change to the record, 02 June 2026.
Common questions
- Is Godrej Elaris registered with MahaRERA?
- Yes. It is registered as PM1260002501385, filed on 03 November 2025, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Godrej Elaris due to be handed over?
- The promoter has told MahaRERA September 2032. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Godrej Elaris been delayed?
- Yes. The first date filed was May 2032. It now stands at September 2032, 4 months later.
- What did buyers actually pay in Godrej Elaris?
- A median of ₹16,361 per square foot of carpet, across 316 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many units are left in Godrej Elaris?
- 618 of 972 were still unsold at the promoter's last filing, in 2, 3, 4 BHK + shops, from 700–2,307 sq ft of carpet.
- Are there complaints against Godrej Elaris?
- 2 cases have been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
- Who is building Godrej Elaris?
- Godrej Properties Limited, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 21 September 2026. The authority's own page for PM1260002501385 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Mundhwa
Stock image
- Registered here
- ₹12,270
- On offer
- 2, 3, 4 BHK
- Due
- Apr 2028
- Units
- 140
- Carpet
- 903–1,509
- Sold at
- ₹1.4 crore
Stock image
- Due
- Dec 2028
- Units
- 9
- Carpet
- 634–935
- Sold at
- ₹1.8 crore
Stock image
- Nearby
- ₹9,677–11,168
- On offer
- 2, 3 BHK + shops
- Due
- Aug 2029
- Units
- 114
- Carpet
- 361–1,156
- Typical unit
- ~₹1.2 crore