RERA registered P52100046081 Active
Lodha Pune NIBM Project- Tower 7,8 and 9
Mohammadwadi, Pune · Residential / Group Housing by Lodha Developers Limited
Official record Updated from the register 16 September 2026. Anything filed since then is not here yet.
In short
Lodha Pune NIBM Project- Tower 7,8 and 9 in Mohammadwadi is MahaRERA-registered (P52100046081) and still under construction, with possession filed for December 2027. Buyers have already registered 290 sales here at a median ₹11,185 per sq ft of carpet — not an asking price. 2 complaints sit on the filing. Lodha Developers Limited is the promoter.
- Sold here at
- ₹11,185
- per sq ft, 290 registered sales
- Available
- 3 BHK
- 24 left · 936–2,476 sq ft
- Possession
- Dec 2027
- as filed with MahaRERA
Where this is
Mohammadwadi, PMC, Pune, 411060
No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.
Flat sizes on file
All 314 flats are filed unit by unit with the authority, the highest on floor 2. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
2 BHK 112 units · all sold
3 BHK 110 units · 16 available
4 BHK 27 units · all sold
Configuration not filed 65 units · 8 available
284 / 314
90% absorption rate · the promoter's two filings disagree
Visual area guide See what the filed sizes feel like 3 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
2 BHK 112 flats · none available
732 sq ft carpet as drawn, from 731–734 sq ft filed in this configuration
- Carpet, filed
- 732 sq ft
- Built-up
- about 878 sq ft
- Super built-up
- about 1,025 sq ft
Every room in this flat
Living and dining about 213 sq ft, Master bedroom about 142 sq ft, Second bedroom about 114 sq ft, Kitchen about 85 sq ft, Bath about 50 sq ft, Balcony about 50 sq ft, Second bath about 43 sq ft, Passage about 36 sq ft.
3 BHK 110 flats · 16 available
975 sq ft carpet as drawn, from 975–984 sq ft filed in this configuration
- Carpet, filed
- 975 sq ft
- Built-up
- about 1,170 sq ft
- Super built-up
- about 1,365 sq ft
Every room in this flat
Living and dining about 240 sq ft, Master bedroom about 160 sq ft, Second bedroom about 128 sq ft, Third bedroom about 104 sq ft, Kitchen about 96 sq ft, Bath about 56 sq ft, Balcony about 56 sq ft, Second bath about 48 sq ft, Passage about 48 sq ft, Third bath about 40 sq ft.
4 BHK 27 flats · none available
1,538 sq ft carpet as drawn
- Carpet, filed
- 1,538 sq ft
- Built-up
- about 1,846 sq ft
- Super built-up
- about 2,153 sq ft
Every room in this flat
Living and dining about 342 sq ft, Master bedroom about 228 sq ft, Second bedroom about 182 sq ft, Third bedroom about 148 sq ft, Kitchen about 137 sq ft, Fourth bedroom about 137 sq ft, Bath about 80 sq ft, Balcony about 80 sq ft, Passage about 80 sq ft, Second bath about 68 sq ft, Third bath about 57 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹10,376 to ₹19,822 per sq ft |
|---|---|
| Sold and booked | 277 sold, 13 booked |
| Still available | 24 flats, 731–2476 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Stable projection
No delay reported in the latest RERA filings. Construction is recorded against the original baseline date the promoter registered.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | MOHAMMADWADI · shown on this site as Mohammadwadi |
|---|---|
| Taluka | Haveli |
| Street, as filed | MOHAMMADWADI |
| Bounded north by | OPEN SPACE AND T10 |
| Bounded east by | ROAD |
| Bounded south by | AMENITY SPACE |
| Bounded west by | T6 AND OPEN SPACE |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Lodha Developers Limited |
|---|---|
| Registered office | 412, Floor 4 17G, 17G, Vardhaman Chamber, Cawasji Patel Road, Hornimon Circle, Fort, Mumbai City 400001 |
| Registered agents | 1 licensed agent may sell this project |
Professionals named on the filing
| Architect | Pradeepmkamble and associates CA/87/10471 |
|---|---|
| Engineer | Amar More NA |
| Engineer | K C Shah Designs LLP STR/S/270 & STR/840025361 |
| Chartered Accountant | Chirag Sarvaiya & Co 128378 |
| Chartered Accountant | M S K A 105047 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Complaints filed with MahaRERA
2 cases against this project, 0 with an order on record, filed between Mar 2026 and Mar 2026. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.
| Case number | Filed | Outcome |
|---|---|---|
| CC12601819 | Mar 2026 | No order on record |
| CC12601800 | Mar 2026 | No order on record |
A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.
Title and ownership papers
| Title report 1 Copy of the legal title report (3).pdf | 18 June 2022 |
|---|---|
| Promoter's declaration, Form B Form B.pdf | 18 June 2022 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100046081 |
| Promoter | Lodha Developers Limited |
| Project type | Residential / Group Housing · Building development |
| Locality | Mohammadwadi — Haveli taluka, pincode 411060 |
| Applied on | 18 June 2022 |
| Registered on | 20 June 2022 |
| Completion, as first filed | 31 December 2027 |
| Due | 31 December 2027 |
| Units declared | 314 |
| Units sold | 284 of 314 sold (90%), 30 still unsoldfilings disagree |
| Complaints | 2 on record with MahaRERA |
| Certificate on file | Corrected certificate, issued 06 October 2025 |
| Application reference | REA52100114132 |
| Current status | Active |
| Record last changed | 09 July 2026 · 2 months ago |
Where the sold count comes from, and whether it holds up. 284 of 314 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. And here the promoter's two filings do not agree. The quarterly report says 284 of 314 sold, leaving 30. The unit-by-unit list they file separately covers 314 flats and marks 277 sold with 24 left. We show both rather than quietly pick one, and the number to distrust is what is still available — ask the promoter which filing is current before believing a flat is free. Either way, this is only as current as the last change to the record, 09 July 2026.
Common questions
- Is Lodha Pune NIBM Project- Tower 7,8 and 9 registered with MahaRERA?
- Yes. It is registered as P52100046081, filed on 20 June 2022, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Lodha Pune NIBM Project- Tower 7,8 and 9 due to be handed over?
- The promoter has told MahaRERA December 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Lodha Pune NIBM Project- Tower 7,8 and 9 been delayed?
- No. December 2027 is the date first filed with the authority and it has not moved since.
- What did buyers actually pay in Lodha Pune NIBM Project- Tower 7,8 and 9?
- A median of ₹11,185 per square foot of carpet, across 290 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many flats are left in Lodha Pune NIBM Project- Tower 7,8 and 9?
- 24 of 314 were still unsold at the promoter's last filing, in 3 BHK, from 936–2,476 sq ft of carpet.
- Are there complaints against Lodha Pune NIBM Project- Tower 7,8 and 9?
- 2 cases have been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
- Who is building Lodha Pune NIBM Project- Tower 7,8 and 9?
- Lodha Developers Limited, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 16 September 2026. The authority's own page for P52100046081 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Mohammadwadi
Stock image
- Registered here
- ₹13,138
- On offer
- Duplex
- Due
- Nov 2030
- Units
- 74
- Carpet
- 1,307–2,594
- Sold at
- ₹1.8 crore
Stock image
- Registered here
- ₹11,500
- On offer
- 2, 3 BHK
1 complaint
- Due
- Dec 2031
- Units
- 145
- Carpet
- 641–993
- Sold at
- ₹98.9 lakh
Stock image
- Nearby
- ₹8,855–11,118
- On offer
- 1, 3 BHK + shops
1 complaint
- Due
- Dec 2030
- Units
- 86
- Carpet
- 504–1,683
- Sold at
- ₹97.7 lakh