RERA registered P52100049849 Active
Vtp Euphoria Phase 4
Manjari Khurd, Pune · Residential / Group Housing by Ashdan Developers Private Limited
Official record Updated from the register 16 September 2026. Anything filed since then is not here yet.
In short
Vtp Euphoria Phase 4 in Manjari Khurd is MahaRERA-registered (P52100049849) and still under construction, with possession filed for March 2028. Buyers have already registered 204 sales here at a median ₹11,673 per sq ft of carpet — not an asking price. About 85% of the 240 units are sold. 1 complaint sits on the filing. Ashdan Developers Private Limited is the promoter.
- Sold here at
- ₹11,673
- per sq ft, 204 registered sales
- Available
- 2 BHK
- 11 left · 515–600 sq ft
- Possession
- Mar 2028
- as filed with MahaRERA
Where this is
Manjari Khurd, PMRDA, Pune, 412307
No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.
Flat sizes on file
All 240 flats are filed unit by unit with the authority, the highest on floor 30. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
2 BHK 240 units · 11 available
204 / 240
85% absorption rate
Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
2 BHK 240 flats · 11 available
515 sq ft carpet as drawn, from 515–600 sq ft filed in this configuration
- Carpet, filed
- 515 sq ft
- Built-up
- about 618 sq ft
- Super built-up
- about 721 sq ft
Every room in this flat
Living and dining about 150 sq ft, Master bedroom about 100 sq ft, Second bedroom about 80 sq ft, Kitchen about 60 sq ft, Bath about 35 sq ft, Balcony about 35 sq ft, Second bath about 30 sq ft, Passage about 25 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹10,333 to ₹15,464 per sq ft |
|---|---|
| Sold and booked | 199 sold, 5 booked |
| Still available | 11 flats, 515–600 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Stable projection
No delay reported in the latest RERA filings. Construction is recorded against the original baseline date the promoter registered.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | MANJARI KH · shown on this site as Manjari Khurd |
|---|---|
| Taluka | Haveli |
| Street, as filed | AWHALWADI ROAD |
| Bounded north by | PARKING AND CENTRAL AMENITIES |
| Bounded east by | DRIVE WAY AND 15 MTR ROAD |
| Bounded south by | DRIVE WAY COMPOUND WALL AND 12 MTR WIDE ROAD |
| Bounded west by | TOWER 2 |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Ashdan Developers Private Limited |
|---|---|
| Registered office | Level 8, 36/1/1, Solitaire World, Mumbai Pune Highway, Regency Classic, Baner, Pune 411045 |
| Registered agents | 36 licensed agents may sell this project |
Professionals named on the filing
| Architect | Ana Consortium Pvr Ltd PMRDA/ENG/672 |
|---|---|
| Architect | Vk Arch PMRDA/ENG/672 |
| Architect | VK Design & Projects PVT. LTD. CA/2002/29235 |
| Architect | Vk arch 29235 |
| Engineer | Girish Awinashe NA |
| Engineer | Girish Awinashe |
| Engineer | Mr Pravin Bhosale NA |
| Chartered Accountant | Bogati & Company 137351 |
| Chartered Accountant | S P A K & Co 172292 |
| Chartered Accountant | Sac And Co LLP 154711 |
| Chartered Accountant | Spak & Co. 172292 |
| Chartered Accountant | Sunil Shaha 037483 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Complaints filed with MahaRERA
1 case against this project, 1 with an order on record. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.
| Case number | Filed | Outcome |
|---|---|---|
| CC12601133 | Mar 2026 | Order passed Mar 2026 |
A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.
Title and ownership papers
| Title report 2TSR.pdf | 9 February 2023 |
|---|---|
| Promoter's declaration, Form B 9Form B_Euphoria Phase 4.pdf | 9 February 2023 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100049849 |
| Promoter | Ashdan Developers Private Limited |
| Project type | Residential / Group Housing · Building development |
| Locality | Manjari Khurd — Haveli taluka, pincode 412307 |
| Applied on | 12 February 2023 |
| Registered on | 06 March 2023 |
| Completion, as first filed | 31 March 2028 |
| Due | 31 March 2028 |
| Units declared | 240 |
| Units sold | 204 of 240 sold (85%), 36 still unsold |
| Complaints | 1 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 14 June 2023 |
| Application reference | REA52100130915 |
| Current status | Active |
| Record last changed | 05 December 2024 · 21 months ago |
Where the sold count comes from, and whether it holds up. 204 of 240 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 240 flats and reaches the same answer — 199 sold, every one with money recorded as received against a named flat, 5 booked with a price agreed but nothing received yet, and 11 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 05 December 2024.
Common questions
- Is Vtp Euphoria Phase 4 registered with MahaRERA?
- Yes. It is registered as P52100049849, filed on 06 March 2023, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Vtp Euphoria Phase 4 due to be handed over?
- The promoter has told MahaRERA March 2028. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Vtp Euphoria Phase 4 been delayed?
- No. March 2028 is the date first filed with the authority and it has not moved since.
- What did buyers actually pay in Vtp Euphoria Phase 4?
- A median of ₹11,673 per square foot of carpet, across 204 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many flats are left in Vtp Euphoria Phase 4?
- 11 of 240 were still unsold at the promoter's last filing, in 2 BHK, from 515–600 sq ft of carpet.
- Are there complaints against Vtp Euphoria Phase 4?
- 1 case has been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
- Who is building Vtp Euphoria Phase 4?
- Ashdan Developers Private Limited, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 16 September 2026. The authority's own page for P52100049849 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Manjari Khurd
Stock image
- Registered here
- ₹10,891
- On offer
- 2, 3 BHK
25 complaints
- Due
- Mar 2028
- Units
- 718
- Carpet
- 508–895
- Sold at
- ₹74 lakh
Stock image
- Registered here
- ₹9,170
- On offer
- 1, 2 BHK
2 complaints
- Done
- Sep 2025
- Units
- 780
- Carpet
- 384–677
- Sold at
- ₹59.2 lakh
Stock image
- Registered here
- ₹9,480
- On offer
- 1, 3 BHK
30 complaints
- Done
- Sep 2025
- Units
- 674
- Carpet
- 354–727
- Sold at
- ₹44.9 lakh