RERA registered PR1260002502853 Active
Ramraj Residency B Building
Malegaon BK, Pune · Residential / Group Housing by Ramchandra Dinkar Devkate
Official record Updated from the register 12 September 2026. Anything filed since then is not here yet.
In short
Ramraj Residency B Building in Malegaon BK is MahaRERA-registered (PR1260002502853) and still under construction, with possession filed for December 2030. No sales are registered in this project yet. Units the same size elsewhere in Malegaon BK have registered at ₹3,240 per sq ft of carpet — the neighbourhood, not this building. About 4% of the 24 units are sold. Ramchandra Dinkar Devkate is the promoter.
- Nearby at
- ₹3,240
- per sq ft, same sizes in Malegaon BK
- Available
- 1, 2 BHK
- 23 left · 493–716 sq ft
- Possession
- Dec 2030
- as filed with MahaRERA
Where this is
Malegaon BK, Pune, 413115
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Flat sizes on file
All 24 flats are filed unit by unit with the authority, the highest on floor 6. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
1 BHK 12 units · all available
2 BHK 12 units · 11 available
1 / 24
4% absorption rate
Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
1 BHK 12 flats · 12 available
493 sq ft carpet as drawn
- Carpet, filed
- 493 sq ft
- Built-up
- about 592 sq ft
- Super built-up
- about 690 sq ft
Every room in this flat
Living and dining about 185 sq ft, Master bedroom about 123 sq ft, Kitchen about 74 sq ft, Bath about 43 sq ft, Balcony about 43 sq ft, Passage about 25 sq ft.
2 BHK 12 flats · 11 available
716 sq ft carpet as drawn
- Carpet, filed
- 716 sq ft
- Built-up
- about 859 sq ft
- Super built-up
- about 1,002 sq ft
Every room in this flat
Living and dining about 209 sq ft, Master bedroom about 139 sq ft, Second bedroom about 111 sq ft, Kitchen about 83 sq ft, Bath about 49 sq ft, Balcony about 49 sq ft, Second bath about 42 sq ft, Passage about 35 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What flats like these cost nearby
No sale has been registered at Ramraj Residency B Building yet. 1 agreement has been filed, which is too few to divide into a rate anyone should act on.
| On sale here | Registered in Malegaon BK | Which for this size is |
|---|---|---|
| 2 BHK 716 sq ft | ₹3,240/sq ft 9 sales, 2 projects | ₹23.2 lakh middle half ₹3,164–3,242/sq ft |
1 BHK is also on sale here, and Malegaon BK has not registered enough sales of that to quote a rate for it.
Each rate is what buyers contracted to pay for the same configuration in Malegaon BK, over the carpet area on the same filing. Floor and facing move a rate, and a project new on the register can open above or below what its neighbours sold at two years ago, so the last column is arithmetic rather than a quote. See every rate registered in Malegaon BK.
The state values these at ₹2,233 per sq ft of carpet — one rate across all 23 still available, which puts the smallest at ₹11 lakh and the largest at ₹16 lakh. Stamp duty is charged on whichever is higher, this or the agreement value, so nothing here can be registered below it. Read it as the floor under the price you will be quoted, which in most Pune localities sits well above it.
Timeline audit
Stable projection
No delay reported in the latest RERA filings. Construction is recorded against the original baseline date the promoter registered.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Malegaon Kh. · shown on this site as Malegaon BK |
|---|---|
| Taluka | Baramati |
| Street, as filed | KVK ROAD |
| Bounded north by | GAT NO 124/8 |
| Bounded east by | 9 MTR ROAD |
| Bounded south by | 6 MTR WIDE ROAD |
| Bounded west by | AMENITY, OPEN SPACE & GAT NO 123 |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Ramchandra Dinkar Devkate |
|---|---|
| Registered office | 1, M. No. 563, Laxmi Nivas, Kvk Road, Devkate Patil Nagar, Sharada Nagar, Pune 413115 |
Professionals named on the filing
| Architect | Ganesh Ramdas Bhosale STATE/R/2022/APL/04302 |
|---|---|
| Engineer | Ganesh Ramdas Bhosale STATE/R/2022/APL/04302 |
| Chartered Accountant | Akash Sandip Khinvasara 619502 |
| Chartered Accountant | Samrat Garule And Associates 159024 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report Search.pdf | 22 December 2025 |
|---|---|
| Conveyance deed 124-7_Satbara 12-12-25.pdf | 22 December 2025 1 older version on file |
| Promoter's declaration, Form B Form B.pdf | 22 December 2025 |
| Annexure A declaration Ann A.pdf | 22 December 2025 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | PR1260002502853 |
| Promoter | Ramchandra Dinkar Devkate |
| Project type | Residential / Group Housing · Building development |
| Locality | Malegaon BK — Baramati taluka, pincode 413115 |
| Applied on | 22 December 2025 |
| Registered on | 16 March 2026 |
| Completion, as first filed | 31 December 2030 |
| Due | 31 December 2030 |
| Units declared | 24 |
| Units sold | 1 of 24 sold (4%), 23 still unsold |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 16 March 2026 |
| Application reference | ACK14122505373 |
| Current status | Active |
| Record last changed | 16 March 2026 · 6 months ago |
Where the sold count comes from, and whether it holds up. 1 of 24 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 24 flats and reaches the same answer — 0 sold, 1 booked with a price agreed but nothing received yet, and 23 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 16 March 2026.
Common questions
- Is Ramraj Residency B Building registered with MahaRERA?
- Yes. It is registered as PR1260002502853, filed on 16 March 2026, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Ramraj Residency B Building due to be handed over?
- The promoter has told MahaRERA December 2030. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Ramraj Residency B Building been delayed?
- No. December 2030 is the date first filed with the authority and it has not moved since.
- What does a flat in Ramraj Residency B Building cost?
- Nothing has been registered in this project yet, so it has no price of its own. Units the same size elsewhere in Malegaon BK have registered at ₹3,240 per square foot of carpet — the neighbourhood, not this building.
- How many flats are left in Ramraj Residency B Building?
- 23 of 24 were still unsold at the promoter's last filing, in 1, 2 BHK, from 493–716 sq ft of carpet.
- Are there complaints against Ramraj Residency B Building?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Ramraj Residency B Building?
- Ramchandra Dinkar Devkate, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 12 September 2026. The authority's own page for PR1260002502853 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects near Malegaon BK
Stock image
- Due
- Mar 2028
- Units
- —
- Carpet
- —
- Typical flat
- —
Stock image
- Registered here
- ₹3,240
- Due
- Dec 2028
- Units
- 16
- Carpet
- 512–679
- Sold at
- ₹19.5 lakh
Stock image
- Registered here
- ₹3,543
- On offer
- Row Houses
- Due
- Dec 2029
- Units
- 16
- Carpet
- 907–995
- Sold at
- ₹32.1 lakh