RERA registered P52100049435 Active
Godrej Hill Retreat 2
Mahalunge, Pune · Others by Mahalunge Township Developers Private Limited
Official record Updated from the register 04 October 2026. Anything filed since then is not here yet.
In short
Godrej Hill Retreat 2 in Mahalunge is MahaRERA-registered (P52100049435) and still under construction, with possession filed for March 2027. Buyers have already registered 555 sales here at a median ₹11,726 per sq ft of carpet — not an asking price. About 99% of the 575 units are sold. 4 complaints sit on the filing. Mahalunge Township Developers Private Limited is the promoter.
- Sold here at
- ₹11,726
- per sq ft, 555 registered sales
- Available
- 2 BHK, Shops
- 6 left · 632–1,042 sq ft
- Possession
- Mar 2027
- as filed with MahaRERA
Where this is
Mahalunge, PMRDA, Pune, 411045
No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.
Unit sizes on file
All 575 units are filed unit by unit with the authority, the highest on floor 32. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
1 BHK 197 units · all sold
6 further sizes, 10 units between them
2 BHK 295 units · 2 available
3 BHK 64 units · all sold
Configuration not filed 1 unit · all sold
Shops 18 units · 4 available
5 further sizes, 5 units between them
569 / 575
99% absorption rate
Visual area guide See what the filed sizes feel like 3 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.
1 BHK 197 units · none available
402 sq ft carpet as drawn, from 367–458 sq ft filed in this configuration
- Carpet, filed
- 402 sq ft
- Built-up
- about 482 sq ft
- Super built-up
- about 563 sq ft
Every room in this unit
Living and dining about 151 sq ft, Master bedroom about 100 sq ft, Kitchen about 60 sq ft, Bath about 35 sq ft, Balcony about 35 sq ft, Passage about 20 sq ft.
2 BHK 295 units · 2 available
632 sq ft carpet as drawn, from 606–643 sq ft filed in this configuration
- Carpet, filed
- 632 sq ft
- Built-up
- about 758 sq ft
- Super built-up
- about 885 sq ft
Every room in this unit
Living and dining about 184 sq ft, Master bedroom about 123 sq ft, Second bedroom about 98 sq ft, Kitchen about 74 sq ft, Bath about 43 sq ft, Balcony about 43 sq ft, Second bath about 37 sq ft, Passage about 31 sq ft.
3 BHK 64 units · none available
886 sq ft carpet as drawn, from 879–895 sq ft filed in this configuration
- Carpet, filed
- 886 sq ft
- Built-up
- about 1,063 sq ft
- Super built-up
- about 1,240 sq ft
Every room in this unit
Living and dining about 218 sq ft, Master bedroom about 145 sq ft, Second bedroom about 116 sq ft, Third bedroom about 94 sq ft, Kitchen about 87 sq ft, Bath about 51 sq ft, Balcony about 51 sq ft, Second bath about 44 sq ft, Passage about 44 sq ft, Third bath about 36 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹10,076 to ₹15,651 per sq ft |
|---|---|
| Sold and booked | 567 sold, 2 booked |
| Still available | 6 units, 240–1042 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Stable projection
No delay reported in the latest RERA filings. Construction is recorded against the original baseline date the promoter registered.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Mahalunge |
|---|---|
| Taluka | Mulshi |
| Street, as filed | MDR Road |
| Bounded north by | 15 m wide road |
| Bounded east by | 12 m wide road |
| Bounded south by | Godrej Hill Retreat Sector R7 Part |
| Bounded west by | 30 m wide road |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Mahalunge Township Developers Private Limited |
|---|---|
| Registered office | 5, Godrej One, Eastern Express Highway, Vikhroli East, Pirojshanagar, Mumbai Suburban 400079 |
Professionals named on the filing
| Architect | ANA Consortium Pvt Ltd PMRDA/ENG/672 |
|---|---|
| Engineer | Ashish Marathe |
| Engineer | Ashish Marathe |
| Engineer | Samarth Constro Consultants LLP |
| Chartered Accountant | BSR & Co. LLP 129402 |
| Chartered Accountant | MD Deshpande and CO 166637 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Complaints filed with MahaRERA
4 cases against this project, 2 with an order on record, filed between Dec 2024 and Jun 2026. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.
| Case number | Filed | Outcome |
|---|---|---|
| CC12603516 | Jun 2026 | No order on record |
| CC12501968 | Jun 2025 | No order on record |
| CC12500492 | Feb 2025 | Order passed Feb 2025 |
| CC12400984 | Dec 2024 | Order passed Dec 2024 |
A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.
Title and ownership papers
| Title report RERA Title Report February 6 2023 issued.pdf | 6 February 2023 |
|---|---|
| Promoter's declaration, Form B FORM B_ UPDATED.pdf | 18 January 2023 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100049435 |
| Promoter | Mahalunge Township Developers Private Limited |
| Project type | Others · Building development |
| Locality | Mahalunge — Mulshi taluka, pincode 411045 |
| Applied on | 20 January 2023 |
| Registered on | 14 February 2023 |
| Completion, as first filed | 28 March 2027 |
| Due | 28 March 2027 |
| Units declared | 575 |
| Units sold | 569 of 575 sold (99%), 6 still unsold |
| Complaints | 4 on record with MahaRERA |
| Certificate on file | Corrected certificate, issued 07 January 2026 |
| Application reference | REA52100129352 |
| Current status | Active |
| Record last changed | 02 July 2026 · 3 months ago |
Where the sold count comes from, and whether it holds up. 569 of 575 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 575 units and reaches the same answer — 567 sold, every one with money recorded as received against a named unit, 2 booked with a price agreed but nothing received yet, and 6 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 02 July 2026.
Common questions
- Is Godrej Hill Retreat 2 registered with MahaRERA?
- Yes. It is registered as P52100049435, filed on 14 February 2023, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Godrej Hill Retreat 2 due to be handed over?
- The promoter has told MahaRERA March 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Godrej Hill Retreat 2 been delayed?
- No. March 2027 is the date first filed with the authority and it has not moved since.
- What did buyers actually pay in Godrej Hill Retreat 2?
- A median of ₹11,726 per square foot of carpet, across 555 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many units are left in Godrej Hill Retreat 2?
- 6 of 575 were still unsold at the promoter's last filing, in 2 BHK + shops, from 632–1,042 sq ft of carpet.
- Are there complaints against Godrej Hill Retreat 2?
- 4 cases have been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
- Who is building Godrej Hill Retreat 2?
- Mahalunge Township Developers Private Limited, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 04 October 2026. The authority's own page for P52100049435 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Mahalunge
Stock image
- Registered here
- ₹9,495
- On offer
- 1, 2, 3 BHK
14 complaints
- Done
- May 2026
- Units
- 784
- Carpet
- 430–5,405
- Sold at
- ₹53.9 lakh
Stock image
- Registered here
- ₹12,565
- Due
- Oct 2027
- Units
- 324
- Carpet
- 120–292
- Sold at
- ₹17 lakh
Stock image
- Nearby
- ₹11,135
- On offer
- 3 BHK + shops
- Due
- Oct 2029
- Units
- 17
- Carpet
- 120–871
- Typical unit
- ~₹33 lakh