Building B2 Eon Homes

Maan, Pune · Residential / Group Housing by Hinjawadi Infradevelopment Pvt Ltd

Official record Updated from the register 23 September 2026. Anything filed since then is not here yet.

In short

Building B2 Eon Homes in Maan is MahaRERA-registered (P52100048176) and still under construction, with possession filed for December 2027. Buyers have already registered 142 sales here at a median ₹10,733 per sq ft of carpet — not an asking price. About 78% of the 183 units are sold. Hinjawadi Infradevelopment Pvt Ltd is the promoter.

Stock image, not a photograph of Building B2 Eon Homes Stock image
Where
Maan
pincode 411057
Sold here at
₹10,733
per sq ft, 142 registered sales
Available
2 BHK
40 left · 836–958 sq ft
Possession
Dec 2027
as filed with MahaRERA
A stock photograph, not Building B2 Eon Homes. We have no picture of this site yet.

Where this is

Maan, PMRDA, Pune, 411057

Street map of Maan centred on the coordinate filed for Building B2 Eon Homes, about 1.4 km across.
Streets within about 700 m of the pin the promoter filed. Map data © OpenStreetMap contributors.
Village
Man
Taluka
Mulshi
Pincode
411057
Coordinates
18.578773, 73.690855

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 183 flats are filed unit by unit with the authority, the highest on floor 23. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

2 BHK 183 units · 40 available

46 units 836 sq ft 77.65 sq m as filed
46 units 839 sq ft 77.98 sq m as filed
45 units 958 sq ft 88.99 sq m as filed
44 units 973 sq ft 90.42 sq m as filed

2 units have no usable carpet area on file, so they are counted above but not drawn.

Units sold

143 / 183

Selling steadily

78% absorption rate

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

2 BHK 183 flats · 40 available

836 sq ft carpet as drawn, from 836–973 sq ft filed in this configuration

Carpet, filed
836 sq ft
Built-up
about 1,003 sq ft
Super built-up
about 1,170 sq ft
Every room in this flat

Living and dining about 243 sq ft, Master bedroom about 162 sq ft, Second bedroom about 130 sq ft, Kitchen about 97 sq ft, Bath about 57 sq ft, Balcony about 57 sq ft, Second bath about 49 sq ft, Passage about 41 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹10,733 per sq ft of carpet, median of 142 registered sales
Range across those sales ₹9,082 to ₹11,868 per sq ft
Sold and booked 138 sold, 5 booked
Still available 40 flats, 836–973 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. 1 sale is left out of the median because the filed area or price is not credible — the register is typed in by promoters and some entries are wrong. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Dec 2027
Current status Due Dec 2027

Stable projection

No delay reported in the latest RERA filings. Construction is recorded against the original baseline date the promoter registered.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

Plot R-3/1 Part is the plot this project is built on, as filed
Revenue village Man · shown on this site as Maan
TalukaMulshi
Street, as filed Adjacent to Tech Mahindra
Bounded north by Portion of layout Podium
Bounded east by Portion of layout
Bounded south by Portion of layout Pheriphery road and compound wal
Bounded west by Portion of layout Building B1

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerHinjawadi Infradevelelopment Private Limited
Registered office1, 202, Adams Court, Baner Road, Opp.Hotel Mahabaleshwar, Baner, Pune 411045
Registered agents 10 licensed agents may sell this project

Professionals named on the filing

Chartered Accountant Mantri Maru and Co. 148821

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

7 December 2022 is when an advocate last certified the title to this land
Title report B2 Plot explaination.pdf 7 December 2022 2 older versions on file
Promoter's declaration, Form B correceted form B.pdf 1 December 2022

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100048176
Promoter Hinjawadi Infradevelopment Pvt Ltd
Project typeResidential / Group Housing · Building development
LocalityMaan — Mulshi taluka, pincode 411057
Applied on01 December 2022
Registered on15 December 2022
Completion, as first filed31 December 2027
Due31 December 2027
Units declared183
Units sold 143 of 183 sold (78%), 40 still unsold
Complaints0 on record with MahaRERA
Certificate on file Original registration certificate, issued 15 December 2022
Application referenceREA52100125410
Current statusActive
Record last changed 15 December 2022 · over 3 years ago 3 years untouched

Where the sold count comes from, and whether it holds up. 143 of 183 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 183 flats and reaches the same answer — 138 sold, every one with money recorded as received against a named flat, 5 booked with a price agreed but nothing received yet, and 40 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 15 December 2022.

MahaRERA has not recorded a change to this project's record in 3 years, while still listing it as under construction. That date moves on status changes and system updates as well as on anything the promoter files, so it is not proof the site is idle — but on a project still being sold, it is worth asking the promoter what has been filed since.

Common questions

Is Building B2 Eon Homes registered with MahaRERA?
Yes. It is registered as P52100048176, filed on 15 December 2022, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Building B2 Eon Homes due to be handed over?
The promoter has told MahaRERA December 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Building B2 Eon Homes been delayed?
No. December 2027 is the date first filed with the authority and it has not moved since.
What did buyers actually pay in Building B2 Eon Homes?
A median of ₹10,733 per square foot of carpet, across 142 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Building B2 Eon Homes?
40 of 183 were still unsold at the promoter's last filing, in 2 BHK, from 836–958 sq ft of carpet.
Are there complaints against Building B2 Eon Homes?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Building B2 Eon Homes?
Hinjawadi Infradevelopment Pvt Ltd, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 23 September 2026. The authority's own page for P52100048176 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.