RERA registered PR1260002502416 Active
Shree Chsl
Kothrud, Pune · Residential / Group Housing by Kotibhaskar Infrastructures &Developers Pvt.Ltd.
Official record Updated from the register 16 September 2026. Anything filed since then is not here yet.
In short
Shree Chsl in Kothrud is MahaRERA-registered (PR1260002502416) and still under construction, with possession filed for December 2028. Buyers have already registered 4 sales here at a median ₹22,669 per sq ft of carpet — not an asking price. About 9% of the 46 units are sold. Kotibhaskar Infrastructures &Developers Pvt.Ltd. is the promoter.
- Sold here at
- ₹22,669
- per sq ft, 4 registered sales
- Available
- 2, 3, 4 BHK
- 42 left · 603–1,231 sq ft
- Possession
- Dec 2028
- as filed with MahaRERA
Where this is
Kothrud, PMC, Pune, 411038
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Flat sizes on file
All 46 flats are filed unit by unit with the authority, the highest on floor 12. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
2 BHK 14 units · all available
3 BHK 23 units · 20 available
4 BHK 9 units · 8 available
4 / 46
9% absorption rate
Visual area guide See what the filed sizes feel like 3 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
2 BHK 14 flats · 14 available
699 sq ft carpet as drawn, from 603–700 sq ft filed in this configuration
- Carpet, filed
- 699 sq ft
- Built-up
- about 839 sq ft
- Super built-up
- about 979 sq ft
Every room in this flat
Living and dining about 204 sq ft, Master bedroom about 136 sq ft, Second bedroom about 109 sq ft, Kitchen about 81 sq ft, Bath about 48 sq ft, Balcony about 48 sq ft, Second bath about 41 sq ft, Passage about 34 sq ft.
3 BHK 23 flats · 20 available
1,061 sq ft carpet as drawn, from 674–1,231 sq ft filed in this configuration
- Carpet, filed
- 1,061 sq ft
- Built-up
- about 1,273 sq ft
- Super built-up
- about 1,485 sq ft
Every room in this flat
Living and dining about 261 sq ft, Master bedroom about 174 sq ft, Second bedroom about 139 sq ft, Third bedroom about 113 sq ft, Kitchen about 104 sq ft, Bath about 61 sq ft, Balcony about 61 sq ft, Second bath about 52 sq ft, Passage about 52 sq ft, Third bath about 43 sq ft.
4 BHK 9 flats · 8 available
1,231 sq ft carpet as drawn, from 1,155–1,231 sq ft filed in this configuration
- Carpet, filed
- 1,231 sq ft
- Built-up
- about 1,477 sq ft
- Super built-up
- about 1,723 sq ft
Every room in this flat
Living and dining about 274 sq ft, Master bedroom about 182 sq ft, Second bedroom about 146 sq ft, Third bedroom about 119 sq ft, Kitchen about 109 sq ft, Fourth bedroom about 109 sq ft, Bath about 64 sq ft, Balcony about 64 sq ft, Passage about 64 sq ft, Second bath about 55 sq ft, Third bath about 46 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹15,025 to ₹27,045 per sq ft |
|---|---|
| Sold and booked | 0 sold, 4 booked |
| Still available | 42 flats, 603–1231 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Stable projection
No delay reported in the latest RERA filings. Construction is recorded against the original baseline date the promoter registered.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Kothrud |
|---|---|
| Taluka | Haveli |
| Street, as filed | S.NO. 27/5, 6, CTS 450 & 451, PLOT NO. 5 & 6 |
| Bounded north by | BY ROAD |
| Bounded east by | BY CTS 448 & CTS 452 |
| Bounded south by | BY CTS 449 |
| Bounded west by | BY ROAD |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Kotibhaskar Infrastructures &Developers Pvt.Ltd. |
|---|---|
| Registered office | F.P No. 71/A/1, Gurukrupa, Lane No. 15, Prabhat Road, Diagonally Opp. Symboisis School, Erandwane, Pune 411004 |
Professionals named on the filing
| Architect | Pushan Limaye CA/2013/61678 |
|---|---|
| Engineer | Shridhar Shet na |
| Chartered Accountant | Amit Anil Shende 132703 |
| Chartered Accountant | Omkar Chandak 163445 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report SHREE - TSR RERA.pdf | 31 January 2026 2 older versions on file |
|---|---|
| Promoter's declaration, Form B Form B-Promoter Declaration.pdf | 31 January 2026 |
| Annexure A declaration Annexure A- Declaration- Cum- Undertaking (1).pdf | 9 January 2026 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | PR1260002502416 |
| Promoter | Kotibhaskar Infrastructures &Developers Pvt.Ltd. |
| Project type | Residential / Group Housing · Building development |
| Locality | Kothrud — Haveli taluka, pincode 411038 |
| Applied on | 09 January 2026 |
| Registered on | 20 February 2026 |
| Completion, as first filed | 31 December 2028 |
| Due | 31 December 2028 |
| Units declared | 46 |
| Units sold | 4 of 46 sold (9%), 42 still unsold |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 20 February 2026 |
| Application reference | ACK06012605873 |
| Current status | Active |
| Record last changed | 20 February 2026 · 7 months ago |
Where the sold count comes from, and whether it holds up. 4 of 46 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 46 flats and reaches the same answer — 0 sold, 4 booked with a price agreed but nothing received yet, and 42 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 20 February 2026.
Common questions
- Is Shree Chsl registered with MahaRERA?
- Yes. It is registered as PR1260002502416, filed on 20 February 2026, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Shree Chsl due to be handed over?
- The promoter has told MahaRERA December 2028. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Shree Chsl been delayed?
- No. December 2028 is the date first filed with the authority and it has not moved since.
- What did buyers actually pay in Shree Chsl?
- A median of ₹22,669 per square foot of carpet, across 4 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many flats are left in Shree Chsl?
- 42 of 46 were still unsold at the promoter's last filing, in 2, 3, 4 BHK, from 603–1,231 sq ft of carpet.
- Are there complaints against Shree Chsl?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Shree Chsl?
- Kotibhaskar Infrastructures &Developers Pvt.Ltd., as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 16 September 2026. The authority's own page for PR1260002502416 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Kothrud
Stock image
- Nearby
- ₹15,282–17,382
- On offer
- 2, 3 BHK
- Due
- Jun 2028
- Units
- 21
- Carpet
- 740–1,217
- Typical flat
- ~₹1.7 crore
Stock image
- Nearby
- ₹13,582–17,382
- On offer
- 1, 2, 3 BHK +2 more
- Due
- Apr 2030
- Units
- 54
- Carpet
- 121–4,476
- Typical unit
- ~₹87.5 lakh
Stock image
- Registered here
- ₹20,142
- On offer
- 2 BHK + shops
1 complaint
- Due
- May 2028
- Units
- 84
- Carpet
- 210–1,610
- Sold at
- ₹1.9 crore