In short

Kothrud Pune -Tower A and B in Kothrud is MahaRERA-registered (PR1260002400041) and still under construction, with possession filed for September 2029. Buyers have already registered 6 sales here at a median ₹23,405 per sq ft of carpet — not an asking price. About 11% of the 57 units are sold. Lodha Developers Limited is the promoter.

Stock image, not a photograph of Kothrud Pune -Tower A and B Stock image
Where
Kothrud
pincode 411038
Sold here at
₹23,405
per sq ft, 6 registered sales
Available
3, 4 BHK
51 left · 1,388–3,052 sq ft
Possession
Sep 2029
as filed with MahaRERA
A stock photograph, not Kothrud Pune -Tower A and B. We have no picture of this site yet.

Where this is

Kothrud, PMC, Pune, 411038

Village
Kothrud
Taluka
Haveli
Pincode
411038
Coordinates
18.500822, 73.806076

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 57 flats are filed unit by unit with the authority, the highest on floor 26. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

3 BHK 37 units · 33 available

13 units 1388 sq ft 128.95 sq m as filed
17 units 1399 sq ft 129.99 sq m as filed
3 units 1407 sq ft 130.72 sq m as filed
4 units 1432 sq ft 133.04 sq m as filed

4 BHK 14 units · 13 available

13 units 1689 sq ft 156.93 sq m as filed
1 unit 1769 sq ft 164.34 sq m as filed

Configuration not filed 6 units · 5 available

1 unit 2545 sq ft 236.43 sq m as filed
1 unit 2607 sq ft 242.21 sq m as filed
1 unit 2898 sq ft 269.27 sq m as filed
1 unit 2964 sq ft 275.35 sq m as filed
1 unit 3052 sq ft 283.58 sq m as filed
1 unit 3555 sq ft 330.27 sq m as filed
Units sold

6 / 57

Early sales

11% absorption rate

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

3 BHK 37 flats · 33 available

1,399 sq ft carpet as drawn, from 1,388–1,432 sq ft filed in this configuration

Carpet, filed
1,399 sq ft
Built-up
about 1,679 sq ft
Super built-up
about 1,959 sq ft
Every room in this flat

Living and dining about 344 sq ft, Master bedroom about 229 sq ft, Second bedroom about 183 sq ft, Third bedroom about 149 sq ft, Kitchen about 138 sq ft, Bath about 80 sq ft, Balcony about 80 sq ft, Second bath about 69 sq ft, Passage about 69 sq ft, Third bath about 57 sq ft.

4 BHK 14 flats · 13 available

1,689 sq ft carpet as drawn, from 1,689–1,769 sq ft filed in this configuration

Carpet, filed
1,689 sq ft
Built-up
about 2,027 sq ft
Super built-up
about 2,365 sq ft
Every room in this flat

Living and dining about 375 sq ft, Master bedroom about 250 sq ft, Second bedroom about 200 sq ft, Third bedroom about 163 sq ft, Kitchen about 150 sq ft, Fourth bedroom about 150 sq ft, Bath about 88 sq ft, Balcony about 88 sq ft, Passage about 88 sq ft, Second bath about 75 sq ft, Third bath about 63 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹23,405 per sq ft of carpet, median of 6 registered sales
Range across those sales ₹22,056 to ₹27,853 per sq ft
Sold and booked 6 sold, 0 booked
Still available 51 flats, 1388–3555 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Sep 2029
Current status Due Sep 2029

Stable projection

No delay reported in the latest RERA filings. Construction is recorded against the original baseline date the promoter registered.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

CTS No 1721P, 1723P, 1724P is the plot this project is built on, as filed
Revenue village Kothrud
TalukaHaveli
Street, as filed Kothrud Road
Bounded north by OPEN SPACE
Bounded east by OPEN SPACE
Bounded south by OPEN SPACE
Bounded west by OPEN SPACE

All four boundaries are filed as the same thing, which satisfies the form without locating the plot. It is not a warning about the project — the survey number above does the locating — but it does mean the four rows here tell you one fact rather than four.

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerLodha Developers Limited
Registered office412, Floor 4 17G, 17G, Vardhaman Chamber, Cawasji Patel Road, Hornimon Circle, Fort, Mumbai City 400001

Professionals named on the filing

Architect Pradeepmkamble and associates CA/87/10471
Architect Vilas Desai & Associates CA/2008/43203
Engineer K C Shah Designs LLP STR/S/270 & STR/840025361
Engineer Pravakar Sahoo NA
Engineer Shripad Patil NA
Chartered Accountant Chirag Sarvaiya 128378
Chartered Accountant M S K A 105047

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

25 September 2024 is when an advocate last certified the title to this land
Title report RERA New Format-Kothrud Land.pdf 25 September 2024
Promoter's declaration, Form B Form B -Macrotech.pdf 12 September 2024
Disclosure of secured and unsecured loans Secured unsecured.pdf 13 September 2024

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberPR1260002400041
Promoter Lodha Developers Limited
Project typeResidential / Group Housing · Building development
LocalityKothrud — Haveli taluka, pincode 411038
Applied on16 September 2024
Registered on03 October 2024
Completion, as first filed30 September 2029
Due30 September 2029
Units declared57
Units sold 6 of 57 sold (11%), 51 still unsold
Complaints0 on record with MahaRERA
Certificate on file Corrected certificate, issued 21 August 2026
Application referenceACK09092400625
Current statusActive
Record last changed 10 June 2026 · 3 months ago

Where the sold count comes from, and whether it holds up. 6 of 57 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 57 flats and reaches the same answer — 6 sold, every one with money recorded as received against a named flat, and 51 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 10 June 2026.

Common questions

Is Kothrud Pune -Tower A and B registered with MahaRERA?
Yes. It is registered as PR1260002400041, filed on 03 October 2024, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Kothrud Pune -Tower A and B due to be handed over?
The promoter has told MahaRERA September 2029. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Kothrud Pune -Tower A and B been delayed?
No. September 2029 is the date first filed with the authority and it has not moved since.
What did buyers actually pay in Kothrud Pune -Tower A and B?
A median of ₹23,405 per square foot of carpet, across 6 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Kothrud Pune -Tower A and B?
51 of 57 were still unsold at the promoter's last filing, in 3, 4 BHK, from 1,388–3,052 sq ft of carpet.
Are there complaints against Kothrud Pune -Tower A and B?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Kothrud Pune -Tower A and B?
Lodha Developers Limited, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 21 September 2026. The authority's own page for PR1260002400041 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Kothrud

Stock image, not a photograph of Ashwamedh CHS Stock image
Registered here
₹20,502
On offer
2, 3 BHK
Under construction

Ashwamedh CHS

Vyas Vedvista Landmarks LLP · Kothrud

45 sold
Due
Apr 2027
Units
58
Carpet
669–1,000
Sold at
₹1.9 crore