Z Zomefy

RERA registered P52100079794 Active

Savali Paradise Wing - B

Kondhwa Budruk, Pune · Residential / Group Housing by Ramdas Anant Hagavane

Official record Updated from the register 24 September 2026. Anything filed since then is not here yet.

In short

Savali Paradise Wing - B in Kondhwa Budruk is MahaRERA-registered (P52100079794) and still under construction, with possession filed for October 2027. Buyers have already registered 25 sales here at a median ₹7,139 per sq ft of carpet — not an asking price. Ramdas Anant Hagavane is the promoter.

Stock image, not a photograph of Savali Paradise Wing - B Stock image
Where
Kondhwa Budruk
pincode 411048
Sold here at
₹7,139
per sq ft, 25 registered sales
Available
1, 2 BHK
29 left · 429–630 sq ft
Now due
Oct 2027
4 months later than first promised
A stock photograph, not Savali Paradise Wing - B. We have no picture of this site yet.

Where this is

Kondhwa Budruk, PMC, Pune, 411048

Village
kondhwa BK
Taluka
Haveli
Pincode
411048

No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.

Flat sizes on file

All 54 flats are filed unit by unit with the authority, the highest on floor 11. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

1 BHK 2 units · all available

2 units 429 sq ft 39.88 sq m as filed

2 BHK 52 units · 27 available

9 units 598 sq ft 55.6 sq m as filed
43 units 630 sq ft 58.56 sq m as filed
Units sold

15 / 54

Early sales

28% absorption rate · the promoter's two filings disagree

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

1 BHK 2 flats · 2 available

429 sq ft carpet as drawn

Carpet, filed
429 sq ft
Built-up
about 515 sq ft
Super built-up
about 601 sq ft
Every room in this flat

Living and dining about 161 sq ft, Master bedroom about 107 sq ft, Kitchen about 64 sq ft, Bath about 38 sq ft, Balcony about 38 sq ft, Passage about 21 sq ft.

2 BHK 52 flats · 27 available

630 sq ft carpet as drawn, from 598–630 sq ft filed in this configuration

Carpet, filed
630 sq ft
Built-up
about 756 sq ft
Super built-up
about 882 sq ft
Every room in this flat

Living and dining about 183 sq ft, Master bedroom about 122 sq ft, Second bedroom about 98 sq ft, Kitchen about 73 sq ft, Bath about 43 sq ft, Balcony about 43 sq ft, Second bath about 37 sq ft, Passage about 31 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹7,139 per sq ft of carpet, median of 25 registered sales
Range across those sales ₹6,346 to ₹7,139 per sq ft
Sold and booked 14 sold, 11 booked
Still available 29 flats, 429–630 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Jun 2027
Current status Due Oct 2027

Revised projection

The completion date has moved from June 2027 to October 2027, 4 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

S.No.59, 60, Hissa No. 2/15/17A, 1/8/3A, 2B/1, 2B/2, 2C is the plot this project is built on, as filed
Revenue village kondhwa BK · shown on this site as Kondhwa Budruk
TalukaHaveli
Street, as filed Lane no 12
Bounded north by Plot S No 60 balance area
Bounded east by Plot S No 60 1
Bounded south by Plot S No 60 2B 2
Bounded west by Plot of Rathi

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerRamdas Anant Hagavane
Registered officeOffice No 3, S. No. 87/15B, Azad Nagar, Sakhai Plaza New D.P. Road, Opp Paranjape School, Kothrud, Pune 411038

Professionals named on the filing

Architect DD Architects CA/2004/34694
Engineer Avadhoot Khambe
Engineer Merit Greens
Chartered Accountant D.B. Gandhi & Associates 044008
Chartered Accountant Sunil Nimbalkar & Associates 197121
Chartered Accountant Shrikant Mantri & Co 111204

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

12 March 2025 is when an advocate last certified the title to this land
Title report MAHA RERA LEGAL TITLE REPORT( HAGAVANE)_0001 (1).pdf 12 March 2025
Promoter's declaration, Form B Form B Affidavit cum Declaration.pdf 25 January 2025

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100079794
Promoter Ramdas Anant Hagavane
Project typeResidential / Group Housing · Building development
LocalityKondhwa Budruk — Haveli taluka, pincode 411048
Applied on25 January 2025
Registered on26 March 2025
Completion, as first filed30 June 2027
Due30 October 2027 4 months later
Units declared54
Units sold 15 of 54 sold (28%), 39 still unsoldfilings disagree
Complaints0 on record with MahaRERA
Certificate on file Corrected certificate, issued 11 September 2026
Application referenceREA52100167613
Current statusActive
Record last changed 24 July 2026 · 2 months ago

Where the sold count comes from, and whether it holds up. 15 of 54 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. And here the promoter's two filings do not agree. The quarterly report says 15 of 54 sold, leaving 39. The unit-by-unit list they file separately covers 54 flats and marks 14 sold with 29 left. We show both rather than quietly pick one, and the number to distrust is what is still available — ask the promoter which filing is current before believing a flat is free. Either way, this is only as current as the last change to the record, 24 July 2026.

Common questions

Is Savali Paradise Wing - B registered with MahaRERA?
Yes. It is registered as P52100079794, filed on 26 March 2025, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Savali Paradise Wing - B due to be handed over?
The promoter has told MahaRERA October 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Savali Paradise Wing - B been delayed?
Yes. The first date filed was June 2027. It now stands at October 2027, 4 months later.
What did buyers actually pay in Savali Paradise Wing - B?
A median of ₹7,139 per square foot of carpet, across 25 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Savali Paradise Wing - B?
29 of 54 were still unsold at the promoter's last filing, in 1, 2 BHK, from 429–630 sq ft of carpet.
Are there complaints against Savali Paradise Wing - B?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Savali Paradise Wing - B?
Ramdas Anant Hagavane, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 24 September 2026. The authority's own page for P52100079794 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Kondhwa Budruk

Stock image, not a photograph of Citadel Stock image
Valued from
₹5,775
On offer
Offices + shops
Under construction

Citadel

Ram Multicons LLP · Kondhwa Budruk

0 sold
Slipped 4 months
Due
Apr 2030
Units
34
Carpet
226–765
Typical unit
~₹31.9 lakh
P52100079939
Stock image, not a photograph of Dnk World Stock image
Nearby
₹6,898–7,916
On offer
2, 3 BHK +3 more
Under construction

Dnk World

Dnk Associates · Kondhwa Budruk

5 sold
Slipped 4 months
Due
Jul 2027
Units
83
Carpet
147–1,547
Sold at
₹22.5 lakh
P52100079567