Z Zomefy

RERA registered P52100034227 Active

Om Mangalam Yash

Kiwale, Pune · Others by Shri Associates

Official record Updated from the register 04 October 2026. Anything filed since then is not here yet.

In short

Om Mangalam Yash in Kiwale is MahaRERA-registered (P52100034227) and still under construction, with possession filed for December 2026. Buyers have already registered 105 sales here at a median ₹7,870 per sq ft of carpet — not an asking price. About 97% of the 229 units are sold. Shri Associates is the promoter.

Stock image, not a photograph of Om Mangalam Yash Stock image
Where
Kiwale
pincode 412101
Sold here at
₹7,870
per sq ft, 105 registered sales
Available
2, 3 BHK
7 left · 794–981 sq ft
Possession
Dec 2026
as filed with MahaRERA
A stock photograph, not Om Mangalam Yash. We have no picture of this site yet.

Where this is

Kiwale, PCMC, Pune, 412101

Street map of Kiwale centred on the coordinate filed for Om Mangalam Yash, about 1.4 km across.
Streets within about 700 m of the pin the promoter filed. Map data © OpenStreetMap contributors.
Village
Kiwale
Taluka
Haveli
Pincode
412101
Coordinates
18.662259, 73.723639

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Unit sizes on file

All 229 units are filed unit by unit with the authority, the highest on floor 14. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

2 BHK 4 units · 1 available

4 units 794 sq ft 73.72 sq m as filed

3 BHK 108 units · 6 available

52 units 976 sq ft 90.69 sq m as filed
56 units 981 sq ft 91.11 sq m as filed

Office Space 78 units · all sold

78 units 401 sq ft 37.21 sq m as filed

Shops 39 units · all sold

39 units 401 sq ft 37.21 sq m as filed
Units sold

222 / 229

Nearly sold out

97% absorption rate

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.

2 BHK 4 units · 1 available

794 sq ft carpet as drawn

Carpet, filed
794 sq ft
Built-up
about 953 sq ft
Super built-up
about 1,112 sq ft
Every room in this unit

Living and dining about 231 sq ft, Master bedroom about 154 sq ft, Second bedroom about 123 sq ft, Kitchen about 93 sq ft, Bath about 54 sq ft, Balcony about 54 sq ft, Second bath about 46 sq ft, Passage about 39 sq ft.

3 BHK 108 units · 6 available

981 sq ft carpet as drawn, from 976–981 sq ft filed in this configuration

Carpet, filed
981 sq ft
Built-up
about 1,177 sq ft
Super built-up
about 1,373 sq ft
Every room in this unit

Living and dining about 241 sq ft, Master bedroom about 161 sq ft, Second bedroom about 129 sq ft, Third bedroom about 105 sq ft, Kitchen about 96 sq ft, Bath about 56 sq ft, Balcony about 56 sq ft, Second bath about 48 sq ft, Passage about 48 sq ft, Third bath about 40 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹7,870 per sq ft of carpet, median of 105 registered sales
Range across those sales ₹6,146 to ₹9,453 per sq ft
Sold and booked 222 sold, 0 booked
Still available 7 units, 401–981 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Dec 2026
Current status Due Dec 2026

Stable projection

No delay reported in the latest RERA filings. Construction is recorded against the original baseline date the promoter registered.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

S NO 1-1 PART TO 4 PART PLOT 1 AND 2 KIWALE is the plot this project is built on, as filed
Revenue village Kiwale
TalukaHaveli
Street, as filed NEAR EXPRESS HIGHWAY
Bounded north by 12 MTR D P ROAD
Bounded east by SURVEY NO 4 PART
Bounded south by PLOT NO 3
Bounded west by SURVEY NO 1-1-1

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerShri Associates
Registered officeOffice No 303, Sai Crystal, Vishal Nagar, Pimple Nilakh Baner Link Road, Opp Nandanvan Society, Pimple Nilakh, Pune 411027

Professionals named on the filing

Architect A G Bhilare Consultant Pvt Ltd
Architect Gree Mep Consultant
Architect Sankalp Designer PCMC/658/24
Engineer Vijay Gavade SE/086/2024
Chartered Accountant V L Jain And Company 180382
Chartered Accountant V S A P And Company 134211

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

24 March 2022 is when an advocate last certified the title to this land
Title report download (8).pdf 24 March 2022 3 older versions on file
Promoter's declaration, Form B DECLARATION FORM B.pdf 23 March 2022

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100034227
Promoter Shri Associates
Project typeOthers · Building development
LocalityKiwale — Haveli taluka, pincode 412101
Applied on23 March 2022
Registered on25 March 2022
Completion, as first filed31 December 2026
Due31 December 2026
Units declared229
Units sold 222 of 229 sold (97%), 7 still unsold
Complaints0 on record with MahaRERA
Certificate on file Corrected certificate, issued 07 August 2026
Application referenceREA52100105495
Current statusActive
Record last changed 14 May 2026 · 5 months ago

Where the sold count comes from, and whether it holds up. 222 of 229 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 229 units and reaches the same answer — 222 sold, every one with money recorded as received against a named unit, and 7 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 14 May 2026.

Common questions

Is Om Mangalam Yash registered with MahaRERA?
Yes. It is registered as P52100034227, filed on 25 March 2022, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Om Mangalam Yash due to be handed over?
The promoter has told MahaRERA December 2026. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Om Mangalam Yash been delayed?
No. December 2026 is the date first filed with the authority and it has not moved since.
What did buyers actually pay in Om Mangalam Yash?
A median of ₹7,870 per square foot of carpet, across 105 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many units are left in Om Mangalam Yash?
7 of 229 were still unsold at the promoter's last filing, in 2, 3 BHK, from 794–981 sq ft of carpet.
Are there complaints against Om Mangalam Yash?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Om Mangalam Yash?
Shri Associates, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 04 October 2026. The authority's own page for P52100034227 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Kiwale

Stock image, not a photograph of Rose Paradise Stock image
Nearby
₹7,926
On offer
2 BHK
Under construction

Rose Paradise

Tasneem Construction · Kiwale

0 sold
Slipped 4 months
Due
Nov 2028
Units
17
Carpet
625–692
Typical flat
~₹49.6 lakh
PR1260002501031
Stock image, not a photograph of Sadhguru Homes Stock image
Registered here
₹5,600
On offer
2, 3 BHK
Under construction

Sadhguru Homes

Ashok Motiram Taras · Kiwale

65 sold
Slipped a year
Due
Jan 2027
Units
23
Carpet
597–1,316
Sold at
₹43.7 lakh
P52100052586