RERA registered P52100053741 Active
K Town Building B1, B2 and B3
Kiwale, Pune · Residential / Group Housing by Unique Ams Spaces LLP
Official record Updated from the register 24 September 2026. Anything filed since then is not here yet.
In short
K Town Building B1, B2 and B3 in Kiwale is MahaRERA-registered (P52100053741) and still under construction, with possession filed for December 2028. Buyers have already registered 296 sales here at a median ₹8,182 per sq ft of carpet — not an asking price. Unique Ams Spaces LLP is the promoter.
- Sold here at
- ₹8,182
- per sq ft, 296 registered sales
- Available
- 3 BHK
- 15 left · 923–960 sq ft
- Possession
- Dec 2028
- as filed with MahaRERA
Where this is
Kiwale, PCMC, Pune, 412101
No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.
Flat sizes on file
All 311 flats are filed unit by unit with the authority, the highest on floor 18. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
2 BHK 12 units · all sold
3 BHK 233 units · 15 available
4 BHK 66 units · all sold
236 / 311
76% absorption rate · the promoter's two filings disagree
Visual area guide See what the filed sizes feel like 3 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
2 BHK 12 flats · none available
775 sq ft carpet as drawn
- Carpet, filed
- 775 sq ft
- Built-up
- about 930 sq ft
- Super built-up
- about 1,085 sq ft
Every room in this flat
Living and dining about 226 sq ft, Master bedroom about 150 sq ft, Second bedroom about 120 sq ft, Kitchen about 90 sq ft, Bath about 53 sq ft, Balcony about 53 sq ft, Second bath about 45 sq ft, Passage about 38 sq ft.
3 BHK 233 flats · 15 available
960 sq ft carpet as drawn, from 875–970 sq ft filed in this configuration
- Carpet, filed
- 960 sq ft
- Built-up
- about 1,152 sq ft
- Super built-up
- about 1,344 sq ft
Every room in this flat
Living and dining about 236 sq ft, Master bedroom about 157 sq ft, Second bedroom about 126 sq ft, Third bedroom about 102 sq ft, Kitchen about 94 sq ft, Bath about 55 sq ft, Balcony about 55 sq ft, Second bath about 47 sq ft, Passage about 47 sq ft, Third bath about 39 sq ft.
4 BHK 66 flats · none available
1,156 sq ft carpet as drawn, from 1,156–1,187 sq ft filed in this configuration
- Carpet, filed
- 1,156 sq ft
- Built-up
- about 1,387 sq ft
- Super built-up
- about 1,618 sq ft
Every room in this flat
Living and dining about 257 sq ft, Master bedroom about 171 sq ft, Second bedroom about 137 sq ft, Third bedroom about 111 sq ft, Kitchen about 103 sq ft, Fourth bedroom about 103 sq ft, Bath about 60 sq ft, Balcony about 60 sq ft, Passage about 60 sq ft, Second bath about 51 sq ft, Third bath about 43 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹6,828 to ₹10,065 per sq ft |
|---|---|
| Sold and booked | 296 sold, 0 booked |
| Still available | 15 flats, 775–1187 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Stable projection
No delay reported in the latest RERA filings. Construction is recorded against the original baseline date the promoter registered.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Kiwale |
|---|---|
| Taluka | Haveli |
| Street, as filed | Near Mukai Chowk |
| Bounded north by | Sr No 39 P |
| Bounded east by | By Nala |
| Bounded south by | By Road |
| Bounded west by | By Road |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Unique Ams Spaces LLP |
|---|---|
| Registered office | B 38, Ashwini Society, Pune Mumbai Road, Near Labour Office, Shivajinagar, Pune 411005 |
Professionals named on the filing
| Architect | Shashank Phadke CA/92/14807 |
|---|---|
| Engineer | Amol Jambhale REG/PMC/TEMP/1096/20 |
| Engineer | Pharohaj Mahabri SE/0026/2021 |
| Engineer | Pharohaj Mahabri SE/0026/2021 |
| Chartered Accountant | Darshan Shah 135271 |
| Chartered Accountant | Deo & Company 627486 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report Title Search Report Annexure.PDF | 21 October 2023 |
|---|---|
| Promoter's declaration, Form B Form B.pdf | 21 October 2023 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100053741 |
| Promoter | Unique Ams Spaces LLP |
| Project type | Residential / Group Housing · Building development |
| Locality | Kiwale — Haveli taluka, pincode 412101 |
| Applied on | 23 October 2023 |
| Registered on | 28 November 2023 |
| Completion, as first filed | 31 December 2028 |
| Due | 31 December 2028 |
| Units declared | 311 |
| Units sold | 236 of 311 sold (76%), 75 still unsoldfilings disagree |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 28 November 2023 |
| Application reference | REA52100148428 |
| Current status | Active |
| Record last changed | 13 January 2026 · 8 months ago |
Where the sold count comes from, and whether it holds up. 236 of 311 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. And here the promoter's two filings do not agree. The quarterly report says 236 of 311 sold, leaving 75. The unit-by-unit list they file separately covers 311 flats and marks 296 sold with 15 left. We show both rather than quietly pick one, and the number to distrust is what is still available — ask the promoter which filing is current before believing a flat is free. Either way, this is only as current as the last change to the record, 13 January 2026.
Common questions
- Is K Town Building B1, B2 and B3 registered with MahaRERA?
- Yes. It is registered as P52100053741, filed on 28 November 2023, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is K Town Building B1, B2 and B3 due to be handed over?
- The promoter has told MahaRERA December 2028. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has K Town Building B1, B2 and B3 been delayed?
- No. December 2028 is the date first filed with the authority and it has not moved since.
- What did buyers actually pay in K Town Building B1, B2 and B3?
- A median of ₹8,182 per square foot of carpet, across 296 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many flats are left in K Town Building B1, B2 and B3?
- 15 of 311 were still unsold at the promoter's last filing, in 3 BHK, from 923–960 sq ft of carpet.
- Are there complaints against K Town Building B1, B2 and B3?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building K Town Building B1, B2 and B3?
- Unique Ams Spaces LLP, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 24 September 2026. The authority's own page for P52100053741 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Kiwale
Stock image
- Registered here
- ₹5,963
- On offer
- 3 BHK
- Due
- Apr 2028
- Units
- 138
- Carpet
- 1,014
- Sold at
- ₹44.9 lakh
Stock image
- Registered here
- ₹5,685
- On offer
- 1 BHK
- Due
- Feb 2027
- Units
- 55
- Carpet
- 443
- Sold at
- ₹25.2 lakh
Stock image
- Due
- Jun 2027
- Units
- —
- Carpet
- —
- Typical flat
- —