RERA registered P52100032035 Active
Cozy Life Building B
Kesnand, Pune · Others by Cozy Life
Official record Updated from the register 16 September 2026. Anything filed since then is not here yet.
In short
Cozy Life Building B in Kesnand is MahaRERA-registered (P52100032035) and still under construction, with possession filed for December 2026. Buyers have already registered 29 sales here at a median ₹5,548 per sq ft of carpet — not an asking price. Cozy Life is the promoter.
- Sold here at
- ₹5,548
- per sq ft, 29 registered sales
- Available
- 1 BHK, 2 BHK, Shops
- 48 left · 159–631 sq ft
- Now due
- Dec 2026
- a year later than first promised
Where this is
Kesnand, PMRDA, Pune, 412207
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Unit sizes on file
All 86 units are filed unit by unit with the authority, the highest on floor 10. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
1 BHK 29 units · 25 available
2 BHK 39 units · 15 available
3 BHK 1 unit · all sold
Shops 17 units · 8 available
5 further sizes, 5 units between them
36 / 86
42% absorption rate · the promoter's two filings disagree
Visual area guide See what the filed sizes feel like 3 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.
1 BHK 29 units · 25 available
414 sq ft carpet as drawn, from 414–624 sq ft filed in this configuration
- Carpet, filed
- 414 sq ft
- Built-up
- about 497 sq ft
- Super built-up
- about 580 sq ft
Every room in this unit
Living and dining about 155 sq ft, Master bedroom about 104 sq ft, Kitchen about 62 sq ft, Bath about 36 sq ft, Balcony about 36 sq ft, Passage about 21 sq ft.
2 BHK 39 units · 15 available
630 sq ft carpet as drawn, from 414–631 sq ft filed in this configuration
- Carpet, filed
- 630 sq ft
- Built-up
- about 756 sq ft
- Super built-up
- about 882 sq ft
Every room in this unit
Living and dining about 183 sq ft, Master bedroom about 122 sq ft, Second bedroom about 98 sq ft, Kitchen about 73 sq ft, Bath about 43 sq ft, Balcony about 43 sq ft, Second bath about 37 sq ft, Passage about 31 sq ft.
3 BHK 1 unit · none available
823 sq ft carpet as drawn
- Carpet, filed
- 823 sq ft
- Built-up
- about 988 sq ft
- Super built-up
- about 1,152 sq ft
Every room in this unit
Living and dining about 202 sq ft, Master bedroom about 135 sq ft, Second bedroom about 108 sq ft, Third bedroom about 88 sq ft, Kitchen about 81 sq ft, Bath about 47 sq ft, Balcony about 47 sq ft, Second bath about 40 sq ft, Passage about 40 sq ft, Third bath about 34 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹4,444 to ₹9,049 per sq ft |
|---|---|
| Sold and booked | 38 sold, 0 booked |
| Still available | 48 units, 135–823 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Revised projection
The completion date has moved from December 2025 to December 2026, a year later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Kesnand |
|---|---|
| Taluka | Haveli |
| Street, as filed | - |
| Bounded north by | BY 36 METER WIDE ROAD |
| Bounded east by | BY BUILDING C OF EXISTING PROJECT |
| Bounded south by | BY BUILDING A OF EXISTING PROJECT |
| Bounded west by | BY ADJACENT SURVEY NO 264 PART |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Cozy Life |
|---|---|
| Registered office | Gat No 264, Cozy Life, Kesnand Theur Road, Gawdewadi Road, Kesnand, Pune 412207 |
Professionals named on the filing
| Architect | Ms Crystal Arch CA/98/23233 |
|---|---|
| Engineer | R D Bankar And Company. PMRDA/ENG/432/24-26 |
| Engineer | Sd Structural Consultants |
| Chartered Accountant | M P P B And Associates LLP 189158 |
| Chartered Accountant | Mars And Company Chartered Accountants 157850 |
| Chartered Accountant | Mr Chandorkar And Limaye 166211 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report 1.pdf | 28 October 2021 |
|---|---|
| Promoter's declaration, Form B FORM B B BUILDING.pdf | 29 October 2021 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100032035 |
| Promoter | Cozy Life |
| Project type | Others · Building development |
| Locality | Kesnand — Haveli taluka, pincode 412207 |
| Applied on | 16 November 2021 |
| Registered on | 03 December 2021 |
| Completion, as first filed | 31 December 2025 |
| Due | 31 December 2026 a year later |
| Units declared | 86 |
| Units sold | 36 of 86 sold (42%), 50 still unsoldfilings disagree |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Extension certificate, issued 06 March 2026 |
| Application reference | REA52100097348 |
| Current status | Active |
| Record last changed | 14 March 2026 · 6 months ago |
Where the sold count comes from, and whether it holds up. 36 of 86 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. And here the promoter's two filings do not agree. The quarterly report says 36 of 86 sold, leaving 50. The unit-by-unit list they file separately covers 86 units and marks 38 sold with 48 left. We show both rather than quietly pick one, and the number to distrust is what is still available — ask the promoter which filing is current before believing a unit is free. Either way, this is only as current as the last change to the record, 14 March 2026.
Common questions
- Is Cozy Life Building B registered with MahaRERA?
- Yes. It is registered as P52100032035, filed on 03 December 2021, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Cozy Life Building B due to be handed over?
- The promoter has told MahaRERA December 2026. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Cozy Life Building B been delayed?
- Yes. The first date filed was December 2025. It now stands at December 2026, a year later.
- What did buyers actually pay in Cozy Life Building B?
- A median of ₹5,548 per square foot of carpet, across 29 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many units are left in Cozy Life Building B?
- 48 of 86 were still unsold at the promoter's last filing, in 1, 2 BHK + shops, from 159–631 sq ft of carpet.
- Are there complaints against Cozy Life Building B?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Cozy Life Building B?
- Cozy Life, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 16 September 2026. The authority's own page for P52100032035 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Kesnand
Stock image
5 complaints
- Due
- Dec 2026
- Units
- 253
- Carpet
- —
- Typical unit
- —
Stock image
Nivaan Meadows Phase III
Vishal Chugera Properties India Private Limited · Kesnand
- Due
- Dec 2032
- Units
- 523
- Carpet
- —
- Typical unit
- —
Stock image
3 complaints
- Due
- Dec 2026
- Units
- 141
- Carpet
- —
- Typical unit
- —