RERA registered P52100008915 Active
Spring Residency
Kadamwakwasti, Pune · Residential / Group Housing by Pritam Ashok Kachi
Official record Updated from the register 10 October 2026. Anything filed since then is not here yet.
In short
Spring Residency in Kadamwakwasti is MahaRERA-registered (P52100008915). Possession was filed for September 2026, and that date has passed without a handover on the register. Buyers have already registered 16 sales here at a median ₹5,432 per sq ft of carpet — not an asking price. About 69% of the 26 units are sold. 2 complaints sit on the filing. Pritam Ashok Kachi is the promoter.
- Sold here at
- ₹5,432
- per sq ft, 16 registered sales
- Available
- 1 BHK, 2 BHK, Office Space, Shops
- 8 left · 108–418 sq ft
- Was due
- Sep 2026
- 10 days past its date, not handed over
Where this is
Kadamwakwasti, PMRDA, Pune, 411057
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Unit sizes on file
All 26 units are filed unit by unit with the authority, the highest on floor 4. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
1 BHK 8 units · 1 available
2 BHK 12 units · 3 available
Office Space 4 units · 3 available
Shops 2 units · 1 available
18 / 26
69% absorption rate
Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.
1 BHK 8 units · 1 available
377 sq ft carpet as drawn, from 377–391 sq ft filed in this configuration
- Carpet, filed
- 377 sq ft
- Built-up
- about 452 sq ft
- Super built-up
- about 528 sq ft
Every room in this unit
Living and dining about 141 sq ft, Master bedroom about 94 sq ft, Kitchen about 57 sq ft, Bath about 33 sq ft, Balcony about 33 sq ft, Passage about 19 sq ft.
2 BHK 12 units · 3 available
391 sq ft carpet as drawn, from 391–542 sq ft filed in this configuration
- Carpet, filed
- 391 sq ft
- Built-up
- about 469 sq ft
- Super built-up
- about 547 sq ft
Every room in this unit
Living and dining about 114 sq ft, Master bedroom about 76 sq ft, Second bedroom about 61 sq ft, Kitchen about 46 sq ft, Bath about 27 sq ft, Balcony about 27 sq ft, Second bath about 23 sq ft, Passage about 19 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹4,614 to ₹9,597 per sq ft |
|---|---|
| Sold and booked | 18 sold, 0 booked |
| Still available | 8 units, 107–542 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
1 further sale is set aside. It divides out beyond ₹13,581 per sq ft, more than two and a half times this project's own median. A unit does not cost that much more than its neighbours on the same price list, so the usual cause is a carpet area filed too small for the agreement value printed beside it. Both figures are on the register exactly as shown — you can check them in the register itself — but no rate is computed from them here. Counted rather than quietly dropped.
Timeline audit
Revised projection
The completion date has moved from December 2018 to September 2026, 7.7 years later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Kadamwak Wasti · shown on this site as Kadamwakwasti |
|---|---|
| Taluka | Haveli |
| Street, as filed | Kadamwak Wasti |
| Bounded north by | road |
| Bounded east by | 65 |
| Bounded south by | S no 8 H no 2 |
| Bounded west by | 62 |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Pritam Ashok Kachi |
|---|---|
| Registered office | 4, B, Gnaesh Prasad Appt, Ekbote Colony, 7 Loves Chwk, Ghorpade Peth, Pune 412201 |
Professionals named on the filing
| Architect | Vaibhav markad CA/04/34703 |
|---|---|
| Engineer | Pravin Kamble PMC L No 868 |
| Engineer | Structure vision |
| Chartered Accountant | Anand Mukul Associates 040718 |
| Chartered Accountant | Mandar Bhide 116657 |
| Chartered Accountant | Manisha V Dhavale and Co 103862 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Complaints filed with MahaRERA
2 cases against this project, 2 with an order on record, filed between Sep 2023 and Sep 2023. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.
| Case number | Filed | Outcome |
|---|---|---|
| CC005000000269412 | Sep 2023 | Order passed Sep 2023 |
| CC005000000269413 | Sep 2023 | Order passed Sep 2023 |
A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.
Title and ownership papers
| Title report Title Report.pdf | 31 July 2017 |
|---|---|
| Promoter's declaration, Form B FormB spring Recidency.pdf | 18 March 2025 5 older versions on file |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100008915 |
| Promoter | Pritam Ashok Kachi |
| Project type | Residential / Group Housing · Building development |
| Locality | Kadamwakwasti — Haveli taluka, pincode 411057 |
| Applied on | 31 July 2017 |
| Registered on | 19 August 2017 |
| Completion, as first filed | 31 December 2018 |
| Was due | 30 September 2026 7.7 years later |
| Units declared | 26 |
| Units sold | 18 of 26 sold (69%), 8 still unsold |
| Complaints | 2 on record with MahaRERA |
| Certificate on file | Extension certificate, issued 14 August 2026 |
| Application reference | REA52100018075 |
| Current status | Active |
| Record last changed | 14 August 2026 · 2 months ago |
Where the sold count comes from, and whether it holds up. 18 of 26 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 26 units and reaches the same answer — 18 sold, every one with money recorded as received against a named unit, and 8 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 14 August 2026.
Common questions
- Is Spring Residency registered with MahaRERA?
- Yes. It is registered as P52100008915, filed on 19 August 2017, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When was Spring Residency due to be handed over?
- September 2026, and that date has passed without a handover being filed — 10 days ago. Section 18 of the Act gives an allottee a remedy when a promoter misses the date in the agreement.
- What did buyers actually pay in Spring Residency?
- A median of ₹5,432 per square foot of carpet, across 16 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many units are left in Spring Residency?
- 8 of 26 were still unsold at the promoter's last filing, in 1, 2 BHK +2 more, from 108–418 sq ft of carpet.
- Are there complaints against Spring Residency?
- 2 cases have been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
- Who is building Spring Residency?
- Pritam Ashok Kachi, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 10 October 2026. The authority's own page for P52100008915 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Kadamwakwasti
Stock image
- Registered here
- ₹5,161
- On offer
- 2, 3, 4 BHK + shops
- Due
- Mar 2027
- Units
- 42
- Carpet
- 284–1,358
- Sold at
- ₹20 lakh
Stock image
- Registered here
- ₹4,683
- On offer
- 1 BHK + shops
- Due
- Apr 2027
- Units
- 54
- Carpet
- 269–390
- Sold at
- ₹22 lakh
Stock image
- Registered here
- ₹4,040
- On offer
- 1 BHK
Skylark Apartments RVR 7A at Riverview City
- Done
- Mar 2026
- Units
- 664
- Carpet
- 300–483
- Sold at
- ₹18.1 lakh