Z Zomefy

RERA registered P52100078720 Active

Mehta Paradise

Jalochi, Pune · Residential / Group Housing by Mehta Builders

Official record Updated from the register 21 September 2026. Anything filed since then is not here yet.

In short

Mehta Paradise in Jalochi is MahaRERA-registered (P52100078720) and still under construction, with possession filed for April 2028. Buyers have already registered 4 sales here at a median ₹5,808 per sq ft of carpet — not an asking price. Mehta Builders is the promoter.

Stock image, not a photograph of Mehta Paradise Stock image
Where
Jalochi
pincode 413102
Sold here at
₹5,808
per sq ft, 4 registered sales
Available
2 BHK
24 left · 687–698 sq ft
Now due
Apr 2028
4 months later than first promised
A stock photograph, not Mehta Paradise. We have no picture of this site yet.

Where this is

Jalochi, Baramati, Pune, 413102

Village
Jalochi
Taluka
Baramati
Pincode
413102

No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.

Flat sizes on file

All 28 flats are filed unit by unit with the authority, the highest on floor 7. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

2 BHK 28 units · 24 available

14 units 687 sq ft 63.83 sq m as filed
14 units 698 sq ft 64.8 sq m as filed
Units sold

2 / 28

Early sales

7% absorption rate · the promoter's two filings disagree

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

2 BHK 28 flats · 24 available

687 sq ft carpet as drawn, from 687–698 sq ft filed in this configuration

Carpet, filed
687 sq ft
Built-up
about 824 sq ft
Super built-up
about 962 sq ft
Every room in this flat

Living and dining about 200 sq ft, Master bedroom about 133 sq ft, Second bedroom about 107 sq ft, Kitchen about 80 sq ft, Bath about 47 sq ft, Balcony about 47 sq ft, Second bath about 40 sq ft, Passage about 33 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹5,808 per sq ft of carpet, median of 4 registered sales
Range across those sales ₹3,348 to ₹6,084 per sq ft
Sold and booked 4 sold, 0 booked
Still available 24 flats, 687–698 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Dec 2027
Current status Due Apr 2028

Revised projection

The completion date has moved from December 2027 to April 2028, 4 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

Gut No. 162/2 is the plot this project is built on, as filed
Revenue village Jalochi
TalukaBaramati
Plot No.77, 78, 79
Street, as filed BHIGWAN ROAD
Bounded north by OPEN SPACE
Bounded east by PLOT NO 76
Bounded south by 9 MTR INTERNAL ROAD
Bounded west by PLOT NO 80

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerMehta Builders
Registered officePlot No - A 39, A 39, Mehta Builders, M.I.D.C, Near R.T.O Office, M.I.D.C , Baramati, Pune 413102

Professionals named on the filing

Architect Akshay Kishor Mehta STATE/R/2024/APL/11035
Engineer Akshay Kishor Mehta STATE/R/2024/APL/11035
Chartered Accountant D A Taware and Associates 139736
Chartered Accountant Hitesh Rajendra Chhajed 132959

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

9 November 2024 is when an advocate last certified the title to this land
Title report 02 Format_-A_Legal Tittle Report.pdf 9 November 2024
Promoter's declaration, Form B New Form B.pdf 8 January 2026 2 older versions on file

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100078720
Promoter Mehta Builders
Project typeResidential / Group Housing · Building development
LocalityJalochi — Baramati taluka, pincode 413102
Applied on11 November 2024
Registered on07 January 2025
Completion, as first filed31 December 2027
Due30 April 2028 4 months later
Units declared28
Units sold 2 of 28 sold (7%), 26 still unsoldfilings disagree
Complaints0 on record with MahaRERA
Certificate on file Corrected certificate, issued 20 August 2026
Application referenceREA52100165562
Current statusActive
Record last changed 08 January 2026 · 8 months ago

Where the sold count comes from, and whether it holds up. 2 of 28 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. And here the promoter's two filings do not agree. The quarterly report says 2 of 28 sold, leaving 26. The unit-by-unit list they file separately covers 28 flats and marks 4 sold with 24 left. We show both rather than quietly pick one, and the number to distrust is what is still available — ask the promoter which filing is current before believing a flat is free. Either way, this is only as current as the last change to the record, 08 January 2026.

Common questions

Is Mehta Paradise registered with MahaRERA?
Yes. It is registered as P52100078720, filed on 07 January 2025, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Mehta Paradise due to be handed over?
The promoter has told MahaRERA April 2028. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Mehta Paradise been delayed?
Yes. The first date filed was December 2027. It now stands at April 2028, 4 months later.
What did buyers actually pay in Mehta Paradise?
A median of ₹5,808 per square foot of carpet, across 4 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Mehta Paradise?
24 of 28 were still unsold at the promoter's last filing, in 2 BHK, from 687–698 sq ft of carpet.
Are there complaints against Mehta Paradise?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Mehta Paradise?
Mehta Builders, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 21 September 2026. The authority's own page for P52100078720 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Jalochi

Stock image, not a photograph of Sainagar Stock image
Registered here
₹3,700
On offer
1, 2, 3 BHK + shops
Under construction

Sainagar

Shrimudra Construction · Jalochi

46 sold
Due
Oct 2027
Units
213
Carpet
153–918
Sold at
₹16.8 lakh
P52100020563
Stock image, not a photograph of Samarth Heights Stock image
Registered here
₹3,755
On offer
1, 2 BHK
Under construction

Samarth Heights

M/s Samarth Developers · Jalochi

45 sold
Slipped 4 months
Due
Oct 2029
Units
29
Carpet
243–671
Sold at
₹20 lakh
PM1260002502586