Z Zomefy

RERA registered P52100076947 Active

Kasturi

Jalochi, Pune · Others by Adi Developers

Official record Updated from the register 24 September 2026. Anything filed since then is not here yet.

In short

Kasturi in Jalochi is MahaRERA-registered (P52100076947) and still under construction, with possession filed for April 2029. Buyers have already registered 12 sales here at a median ₹4,957 per sq ft of carpet — not an asking price. About 39% of the 31 units are sold. Adi Developers is the promoter.

Stock image, not a photograph of Kasturi Stock image
Where
Jalochi
pincode 413102
Sold here at
₹4,957
per sq ft, 12 registered sales
Available
2 BHK, 3 BHK, 4 BHK, Shops
16 left · 113–1,347 sq ft
Now due
Apr 2029
4 months later than first promised
A stock photograph, not Kasturi. We have no picture of this site yet.

Where this is

Jalochi, Baramati, Pune, 413102

Village
Jalochi
Taluka
Baramati
Pincode
413102

No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.

Unit sizes on file

All 31 units are filed unit by unit with the authority, the highest on floor 9. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

2 BHK 16 units · 9 available

8 units 815 sq ft 75.75 sq m as filed
8 units 852 sq ft 79.19 sq m as filed

3 BHK 7 units · 3 available

7 units 1117 sq ft 103.75 sq m as filed

4 BHK 2 units · all available

1 unit 1326 sq ft 123.22 sq m as filed
1 unit 1347 sq ft 125.14 sq m as filed

5 BHK 1 unit · all sold

1 unit 1951 sq ft 181.28 sq m as filed

Shops 5 units · 2 available

1 unit 113 sq ft 10.54 sq m as filed
2 units 508 sq ft 47.23 sq m as filed
2 units 712 sq ft 66.19 sq m as filed
Units sold

12 / 31

Early sales

39% absorption rate

Visual area guide See what the filed sizes feel like 4 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.

2 BHK 16 units · 9 available

815 sq ft carpet as drawn, from 815–852 sq ft filed in this configuration

Carpet, filed
815 sq ft
Built-up
about 978 sq ft
Super built-up
about 1,141 sq ft
Every room in this unit

Living and dining about 237 sq ft, Master bedroom about 158 sq ft, Second bedroom about 127 sq ft, Kitchen about 95 sq ft, Bath about 55 sq ft, Balcony about 55 sq ft, Second bath about 47 sq ft, Passage about 40 sq ft.

3 BHK 7 units · 3 available

1,117 sq ft carpet as drawn

Carpet, filed
1,117 sq ft
Built-up
about 1,340 sq ft
Super built-up
about 1,564 sq ft
Every room in this unit

Living and dining about 275 sq ft, Master bedroom about 183 sq ft, Second bedroom about 146 sq ft, Third bedroom about 119 sq ft, Kitchen about 110 sq ft, Bath about 64 sq ft, Balcony about 64 sq ft, Second bath about 55 sq ft, Passage about 55 sq ft, Third bath about 46 sq ft.

4 BHK 2 units · 2 available

1,326 sq ft carpet as drawn, from 1,326–1,347 sq ft filed in this configuration

Carpet, filed
1,326 sq ft
Built-up
about 1,591 sq ft
Super built-up
about 1,856 sq ft
Every room in this unit

Living and dining about 295 sq ft, Master bedroom about 196 sq ft, Second bedroom about 157 sq ft, Third bedroom about 128 sq ft, Kitchen about 118 sq ft, Fourth bedroom about 118 sq ft, Bath about 69 sq ft, Balcony about 69 sq ft, Passage about 69 sq ft, Second bath about 59 sq ft, Third bath about 49 sq ft.

5 BHK 1 unit · none available

1,951 sq ft carpet as drawn

Carpet, filed
1,951 sq ft
Built-up
about 2,341 sq ft
Super built-up
about 2,731 sq ft
Every room in this unit

Living and dining about 398 sq ft, Master bedroom about 265 sq ft, Second bedroom about 212 sq ft, Third bedroom about 173 sq ft, Kitchen about 159 sq ft, Fourth bedroom about 159 sq ft, Fifth bedroom about 146 sq ft, Passage about 106 sq ft, Bath about 93 sq ft, Balcony about 93 sq ft, Second bath about 80 sq ft, Third bath about 66 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹4,957 per sq ft of carpet, median of 12 registered sales
Range across those sales ₹4,510 to ₹5,053 per sq ft
Sold and booked 0 sold, 12 booked
Still available 16 units, 113–1951 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Dec 2028
Current status Due Apr 2029

Revised projection

The completion date has moved from December 2028 to April 2029, 4 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

GAT NO. 105 PLOT NO. 123,124,125 is the plot this project is built on, as filed
Revenue village Jalochi
TalukaBaramati
Street, as filed NEAR BHIGWAN ROAD
Bounded north by 15 M WIDE ROAD
Bounded east by 3 M PATHWAY
Bounded south by OPEN SPACE
Bounded west by 9 M WIDE ROAD

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerAdi Developers
Registered officeGat No-105,Plot No-236, Bhigwan Road, Behind Vimaldham Temple, Infront Of New Court, Sheth Ramchand Malukchand Nagar, Pune 413102

Professionals named on the filing

Architect Sulabh Shah STATE/R/2025/APL/18347
Engineer Sulabh Shah STATE/R/2025/APL/18347
Chartered Accountant Akash Sandip Khinvasara 619502
Chartered Accountant Samrat A Garule 159024

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

17 May 2024 is when an advocate last certified the title to this land
Title report Legal Title Report.pdf 17 May 2024
Promoter's declaration, Form B form B.pdf 22 April 2024

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100076947
Promoter Adi Developers
Project typeOthers · Building development
LocalityJalochi — Baramati taluka, pincode 413102
Applied on17 May 2024
Registered on09 July 2024
Completion, as first filed31 December 2028
Due30 April 2029 4 months later
Units declared31
Units sold 12 of 31 sold (39%), 19 still unsold
Complaints0 on record with MahaRERA
Certificate on file Original registration certificate, issued 09 July 2024
Application referenceREA52100160251
Current statusActive
Record last changed 09 July 2024 · over 2 years ago 2 years untouched

Where the sold count comes from, and whether it holds up. 12 of 31 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 31 units and reaches the same answer — 0 sold, 12 booked with a price agreed but nothing received yet, and 16 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 09 July 2024.

MahaRERA has not recorded a change to this project's record in 2 years, while still listing it as under construction. That date moves on status changes and system updates as well as on anything the promoter files, so it is not proof the site is idle — but on a project still being sold, it is worth asking the promoter what has been filed since.

Common questions

Is Kasturi registered with MahaRERA?
Yes. It is registered as P52100076947, filed on 09 July 2024, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Kasturi due to be handed over?
The promoter has told MahaRERA April 2029. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Kasturi been delayed?
Yes. The first date filed was December 2028. It now stands at April 2029, 4 months later.
What did buyers actually pay in Kasturi?
A median of ₹4,957 per square foot of carpet, across 12 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many units are left in Kasturi?
16 of 31 were still unsold at the promoter's last filing, in 2, 3, 4 BHK + shops, from 113–1,347 sq ft of carpet.
Are there complaints against Kasturi?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Kasturi?
Adi Developers, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 24 September 2026. The authority's own page for P52100076947 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Jalochi

Stock image, not a photograph of Darade Chavan Complex Stock image
Nearby
₹3,619–3,624
On offer
1, 2 BHK +2 more
Under construction

Darade Chavan Complex

Darade Chavan Associates · Jalochi

0 sold
Slipped 4 months
Due
Apr 2030
Units
49
Carpet
135–798
Typical unit
~₹17.4 lakh
PM1260002600666