RERA registered PM1260002500298 Active
Infinity Tower
Jalochi, Pune · Mixed by Samarth Developers
Official record Updated from the register 24 September 2026. Anything filed since then is not here yet.
In short
Infinity Tower in Jalochi is MahaRERA-registered (PM1260002500298) and still under construction, with possession filed for October 2029. Buyers have already registered 7 sales here at a median ₹5,342 per sq ft of carpet — not an asking price. About 19% of the 42 units are sold. Samarth Developers is the promoter.
- Sold here at
- ₹5,342
- per sq ft, 7 registered sales
- Available
- 2 BHK, Office Space, Shops
- 17 left · 108–789 sq ft
- Now due
- Oct 2029
- 4 months later than first promised
Where this is
Jalochi, Baramati, Pune, 413102
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Unit sizes on file
All 42 units are filed unit by unit with the authority, the highest on floor 4. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
2 BHK 18 units · 3 available
Office Space 11 units · 6 available
Shops 13 units · 8 available
8 / 42
19% absorption rate
Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.
2 BHK 18 units · 3 available
633 sq ft carpet as drawn, from 553–789 sq ft filed in this configuration
- Carpet, filed
- 633 sq ft
- Built-up
- about 760 sq ft
- Super built-up
- about 886 sq ft
Every room in this unit
Living and dining about 184 sq ft, Master bedroom about 123 sq ft, Second bedroom about 98 sq ft, Kitchen about 74 sq ft, Bath about 43 sq ft, Balcony about 43 sq ft, Second bath about 37 sq ft, Passage about 31 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹3,409 to ₹7,325 per sq ft |
|---|---|
| Sold and booked | 8 sold, 0 booked |
| Still available | 17 units, 108–789 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. 1 sale is left out of the median because the filed area or price is not credible — the register is typed in by promoters and some entries are wrong. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Revised projection
The completion date has moved from June 2029 to October 2029, 4 months later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Jalochi |
|---|---|
| Taluka | Baramati |
| Street, as filed | Gat No 140/2/3/1/2, Plot No 02, Gat No 140/2/3/2, Plot No 01 & 02, |
| Bounded north by | DP RESERVATION AND PLOT NO 1 AND NA LAYOUT OF GAT NO 140/2/3/1/2 |
| Bounded east by | 12 METER WIDE ROAD OUT OF LAYOUT |
| Bounded south by | PLOT NO 3 AND NA LAYOUT OF GAT NO 140/2/3/2 |
| Bounded west by | GAT NO 140/2/4 AND DP RESERVATION |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Samarth Developers |
|---|---|
| Registered office | Shop No 5,, Sr No 66/2/1,, Samarth Residency,, Nira Road,, Baramati ,, Jalochi,, Pune 413102 |
Professionals named on the filing
| Architect | Mandar Sikachi CA/99/25087 |
|---|---|
| Engineer | Mahesh Malharrao Jarad |
| Chartered Accountant | Jpnr & Associates 603440 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report SEARCH.pdf | 15 July 2025 |
|---|---|
| Promoter's declaration, Form B Foam B Builder.pdf | 26 June 2025 |
| Annexure A declaration Annexure A Promatter.pdf | 26 June 2025 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | PM1260002500298 |
| Promoter | Samarth Developers |
| Project type | Mixed · Building development |
| Locality | Jalochi — Baramati taluka, pincode 413102 |
| Applied on | 27 June 2025 |
| Registered on | 17 July 2025 |
| Completion, as first filed | 18 June 2029 |
| Due | 18 October 2029 4 months later |
| Units declared | 42 |
| Units sold | 8 of 42 sold (19%), 34 still unsold |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 17 July 2025 |
| Application reference | ACK21062501478 |
| Current status | Active |
| Record last changed | 17 July 2025 · 14 months ago |
Where the sold count comes from, and whether it holds up. 8 of 42 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 42 units and reaches the same answer — 8 sold, every one with money recorded as received against a named unit, and 17 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 17 July 2025.
Common questions
- Is Infinity Tower registered with MahaRERA?
- Yes. It is registered as PM1260002500298, filed on 17 July 2025, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Infinity Tower due to be handed over?
- The promoter has told MahaRERA October 2029. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Infinity Tower been delayed?
- Yes. The first date filed was June 2029. It now stands at October 2029, 4 months later.
- What did buyers actually pay in Infinity Tower?
- A median of ₹5,342 per square foot of carpet, across 7 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many units are left in Infinity Tower?
- 17 of 42 were still unsold at the promoter's last filing, in 2 BHK +2 more, from 108–789 sq ft of carpet.
- Are there complaints against Infinity Tower?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Infinity Tower?
- Samarth Developers, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 24 September 2026. The authority's own page for PM1260002500298 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Jalochi
Stock image
- Nearby
- ₹3,619
- On offer
- 2 BHK + shops
- Due
- Oct 2028
- Units
- 40
- Carpet
- 124–751
- Typical unit
- ~₹19.6 lakh
Stock image
- Due
- Mar 2027
- Units
- —
- Carpet
- —
- Typical flat
- —
Stock image
- Nearby
- ₹3,619
- On offer
- 2 BHK
- Due
- Feb 2027
- Units
- 40
- Carpet
- 778–780
- Typical flat
- ~₹28.2 lakh