Z Zomefy

RERA registered PR1263032502451 Active

Yashraj Nakshatra Phase 4

Hadapsar, Pune · Residential / Group Housing by Vishwas Developers and Builders

Official record Updated from the register 24 September 2026. Anything filed since then is not here yet.

In short

Yashraj Nakshatra Phase 4 in Hadapsar is MahaRERA-registered (PR1263032502451) and still under construction, with possession filed for April 2027. No sales are registered in this project yet. Units the same size elsewhere in Hadapsar have registered at ₹10,461 per sq ft of carpet — the neighbourhood, not this building. None of the units are filed as sold yet. Vishwas Developers and Builders is the promoter.

Stock image, not a photograph of Yashraj Nakshatra Phase 4 Stock image
Where
Hadapsar
pincode 411028
Nearby at
₹10,461
per sq ft, same sizes in Hadapsar
Available
2 BHK
24 left · 504 sq ft
Now due
Apr 2027
4 months later than first promised
A stock photograph, not Yashraj Nakshatra Phase 4. We have no picture of this site yet.

Where this is

Hadapsar, PMC, Pune, 411028

Street map of Hadapsar centred on the coordinate filed for Yashraj Nakshatra Phase 4, about 1.4 km across.
Streets within about 700 m of the pin the promoter filed. Map data © OpenStreetMap contributors.
Village
Hadapsar
Taluka
Haveli
Pincode
411028
Coordinates
18.478015, 73.931489

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 24 flats are filed unit by unit with the authority, the highest on floor 6. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

2 BHK 24 units · all available

24 units 504 sq ft 46.83 sq m as filed
Units sold

0 / 24

Pre-launch / early phase

0% absorption rate

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

2 BHK 24 flats · 24 available

504 sq ft carpet as drawn

Carpet, filed
504 sq ft
Built-up
about 605 sq ft
Super built-up
about 706 sq ft
Every room in this flat

Living and dining about 147 sq ft, Master bedroom about 98 sq ft, Second bedroom about 78 sq ft, Kitchen about 59 sq ft, Bath about 34 sq ft, Balcony about 34 sq ft, Second bath about 29 sq ft, Passage about 24 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What flats like these cost nearby

No sale has been registered at Yashraj Nakshatra Phase 4 yet. The promoter has filed no agreement values, so nothing below is this project's own price.

₹10,461 per sq ft of carpet, median of 4,545 registered sales of the same configuration in Hadapsar
On sale here Registered in Hadapsar Which for this size is
2 BHK 504 sq ft ₹10,461/sq ft 4545 sales, 54 projects ₹52.7 lakh middle half ₹7,897–11,897/sq ft

Each rate is what buyers contracted to pay for the same configuration in Hadapsar, over the carpet area on the same filing. Floor and facing move a rate, and a project new on the register can open above or below what its neighbours sold at two years ago, so the last column is arithmetic rather than a quote. See every rate registered in Hadapsar.

The state values these at ₹5,106 per sq ft of carpet — one rate across all 24 still available, which values each of them at ₹25.7 lakh. Stamp duty is charged on whichever is higher, this or the agreement value, so nothing here can be registered below it. Read it as the floor under the price you will be quoted, which in most Pune localities sits well above it.

Timeline audit

Original proposed Dec 2026
Current status Due Apr 2027

Revised projection

The completion date has moved from December 2026 to April 2027, 4 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

S.No.69, H.No.5C/1, 5/C/4/1, Plot No.69 of Peth-Hadapsar-Ext is the plot this project is built on, as filed
Revenue village Hadapsar
TalukaHaveli
Street, as filed Handewadi Road
Bounded north by 6 Meter Road and Remaining land of S No 69 (P)
Bounded east by Yashraj Nakshatra Phase 3
Bounded south by 6 Meter Road and S no.69/3C
Bounded west by Yashraj Nakshatra Phase 5 (Wing E)

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerVishwas Developers and Builders
Registered officeShop No. 9/3A/1, Vishwas Complex, Pune Solapur Road, Gadital, Hadapsar, Pune 411028

Professionals named on the filing

Architect Malwadkar Architects CA/93/15629
Engineer Prafulla Lade NA
Engineer R.K. Randhave Consultant STATE/R/2022/APL/02136
Engineer Sunil Wakure
Chartered Accountant Aachal Kale 614835
Chartered Accountant Pandurang Santaji Bhapkar 111737
Chartered Accountant Vkps & Associates 144971

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

20 December 2025 is when an advocate last certified the title to this land
Title report Format A and Legal Title report 1.pdf 20 December 2025
Conveyance deed Release Deed 1.pdf 24 November 2025 18 older versions on file
Promoter's declaration, Form B Form B - Promoter.pdf 24 November 2025
Annexure A declaration Annexure A (O50).pdf 20 December 2025

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberPR1263032502451
Promoter Vishwas Developers and Builders
Project typeResidential / Group Housing · Building development
LocalityHadapsar — Haveli taluka, pincode 411028
Applied on20 December 2025
Registered on23 February 2026
Completion, as first filed31 December 2026
Due30 April 2027 4 months later
Units declared24
Units sold None sold yet, all 24 on the market
Complaints0 on record with MahaRERA
Certificate on file Original registration certificate, issued 23 February 2026
Application referenceACK29102504233
Current statusActive
Record last changed 23 February 2026 · 7 months ago

Nothing has sold yet. The promoter's quarterly progress report says none of the 24 flats are gone, and the unit-by-unit list they file separately says the same: all 24 still unsold. On a project this new that is normal rather than a warning, and it means every carpet area filed here is still available. Either way, this is only as current as the last change to the record, 23 February 2026.

Common questions

Is Yashraj Nakshatra Phase 4 registered with MahaRERA?
Yes. It is registered as PR1263032502451, filed on 23 February 2026, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Yashraj Nakshatra Phase 4 due to be handed over?
The promoter has told MahaRERA April 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Yashraj Nakshatra Phase 4 been delayed?
Yes. The first date filed was December 2026. It now stands at April 2027, 4 months later.
What does a flat in Yashraj Nakshatra Phase 4 cost?
Nothing has been registered in this project yet, so it has no price of its own. Units the same size elsewhere in Hadapsar have registered at ₹10,461 per square foot of carpet — the neighbourhood, not this building.
How many flats are left in Yashraj Nakshatra Phase 4?
24 of 24 were still unsold at the promoter's last filing, in 2 BHK, from 504 sq ft of carpet.
Are there complaints against Yashraj Nakshatra Phase 4?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Yashraj Nakshatra Phase 4?
Vishwas Developers and Builders, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 24 September 2026. The authority's own page for PR1263032502451 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Hadapsar

Stock image, not a photograph of 209 Hadapsar Stock image
Registered here
₹12,014
On offer
2, 3 BHK + shops
Under construction

209 Hadapsar

LJM Properties LLP · Hadapsar

33 sold
Due
Mar 2029
Units
286
Carpet
610–990
Sold at
₹74.3 lakh
P52100078580