In short
Kumar Parc Residences - A2 in Hadapsar is MahaRERA-registered (P52100055344) and still under construction, with possession filed for September 2028. Buyers have already registered 332 sales here at a median ₹13,084 per sq ft of carpet — not an asking price. Kumar Properties Infratech Developers Pvt Ltd is the promoter.
- Sold here at
- ₹13,084
- per sq ft, 332 registered sales
- Available
- 2, 3 BHK
- 28 left · 780–1,114 sq ft
- Now due
- Sep 2028
- 4 months later than first promised
Where this is
Hadapsar, PMC, Pune, 411028
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Flat sizes on file
All 360 flats are filed unit by unit with the authority, the highest on floor 30. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
2 BHK 273 units · 11 available
3 BHK 87 units · 17 available
326 / 360
91% absorption rate · the promoter's two filings disagree
Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
2 BHK 273 flats · 11 available
786 sq ft carpet as drawn, from 576–786 sq ft filed in this configuration
- Carpet, filed
- 786 sq ft
- Built-up
- about 943 sq ft
- Super built-up
- about 1,100 sq ft
Every room in this flat
Living and dining about 229 sq ft, Master bedroom about 153 sq ft, Second bedroom about 122 sq ft, Kitchen about 92 sq ft, Bath about 53 sq ft, Balcony about 53 sq ft, Second bath about 46 sq ft, Passage about 38 sq ft.
3 BHK 87 flats · 17 available
1,114 sq ft carpet as drawn
- Carpet, filed
- 1,114 sq ft
- Built-up
- about 1,337 sq ft
- Super built-up
- about 1,560 sq ft
Every room in this flat
Living and dining about 274 sq ft, Master bedroom about 183 sq ft, Second bedroom about 146 sq ft, Third bedroom about 119 sq ft, Kitchen about 110 sq ft, Bath about 64 sq ft, Balcony about 64 sq ft, Second bath about 55 sq ft, Passage about 55 sq ft, Third bath about 46 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹9,572 to ₹17,621 per sq ft |
|---|---|
| Sold and booked | 327 sold, 5 booked |
| Still available | 28 flats, 576–1114 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Revised projection
The completion date has moved from May 2028 to September 2028, 4 months later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Hadapsar |
|---|---|
| Taluka | Haveli |
| Street, as filed | Hadapsar Mundhawa Road |
| Bounded north by | By Land Bearing Survey No 179 P |
| Bounded east by | By Nala |
| Bounded south by | By Land Bearing Survey No 242 P |
| Bounded west by | By Nala |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Kumar Properties Infratech Developers Pvt Ltd |
|---|---|
| Registered office | 2nd Floor, 2413, Kumar Capital, East Street, Next To Axis Bank, Camp, Pune 411001 |
| Registered agents | 324 licensed agents may sell this project |
Professionals named on the filing
| Architect | Vishal J Deshpande CA/2008/42068 |
|---|---|
| Engineer | Amit Shilimkar |
| Engineer | Harshad Pendse NA |
| Engineer | Mahesh Rasal NA |
| Chartered Accountant | GMKS & Co. 134685 |
| Chartered Accountant | Supriya Mundada 156545 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report 251128_Legal Title Report_Format A.pdf | 5 January 2026 4 older versions on file |
|---|---|
| Promoter's declaration, Form B 6_Form B_Declaration.pdf | 9 February 2024 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100055344 |
| Promoter | Kumar Properties Infratech Developers Pvt Ltd |
| Project type | Residential / Group Housing · Building development |
| Locality | Hadapsar — Haveli taluka, pincode 411028 |
| Applied on | 13 February 2024 |
| Registered on | 18 March 2024 |
| Completion, as first filed | 25 May 2028 |
| Due | 25 September 2028 4 months later |
| Units declared | 360 |
| Units sold | 326 of 360 sold (91%), 34 still unsoldfilings disagree |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Corrected certificate, issued 20 August 2026 |
| Application reference | REA52100153324 |
| Current status | Active |
| Record last changed | 28 April 2026 · 5 months ago |
Where the sold count comes from, and whether it holds up. 326 of 360 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. And here the promoter's two filings do not agree. The quarterly report says 326 of 360 sold, leaving 34. The unit-by-unit list they file separately covers 360 flats and marks 327 sold with 28 left. We show both rather than quietly pick one, and the number to distrust is what is still available — ask the promoter which filing is current before believing a flat is free. Either way, this is only as current as the last change to the record, 28 April 2026.
Common questions
- Is Kumar Parc Residences - A2 registered with MahaRERA?
- Yes. It is registered as P52100055344, filed on 18 March 2024, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Kumar Parc Residences - A2 due to be handed over?
- The promoter has told MahaRERA September 2028. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Kumar Parc Residences - A2 been delayed?
- Yes. The first date filed was May 2028. It now stands at September 2028, 4 months later.
- What did buyers actually pay in Kumar Parc Residences - A2?
- A median of ₹13,084 per square foot of carpet, across 332 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many flats are left in Kumar Parc Residences - A2?
- 28 of 360 were still unsold at the promoter's last filing, in 2, 3 BHK, from 780–1,114 sq ft of carpet.
- Are there complaints against Kumar Parc Residences - A2?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Kumar Parc Residences - A2?
- Kumar Properties Infratech Developers Pvt Ltd, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 24 September 2026. The authority's own page for P52100055344 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Hadapsar
Stock image
- Registered here
- ₹11,992
- On offer
- 2, 3 BHK
Kumar Parc Residences - B2
- Due
- Apr 2028
- Units
- 230
- Carpet
- 753–1,055
- Sold at
- ₹99.7 lakh
Stock image
- Registered here
- ₹7,115
Kumar Pebble Park Joy 1 - C1
- Due
- Dec 2026
- Units
- 56
- Carpet
- 680–698
- Sold at
- ₹48.9 lakh
Stock image
- Registered here
- ₹7,468
- On offer
- 2 BHK
Kumar Pebble Park Joy 2 - C2
- Due
- Dec 2026
- Units
- 56
- Carpet
- 688–702
- Sold at
- ₹52 lakh