Daksha Enclave

Golegaon, Pune · Residential / Group Housing by Ajit Govindlal Mutha

Official record Updated from the register 12 September 2026. Anything filed since then is not here yet.

In short

Daksha Enclave in Golegaon is MahaRERA-registered (P52100079318) and still under construction, with possession filed for December 2027. Buyers have already registered 3 sales here at a median ₹3,852 per sq ft of carpet — not an asking price. About 12% of the 24 units are sold. Ajit Govindlal Mutha is the promoter.

Stock image, not a photograph of Daksha Enclave Stock image
Where
Golegaon
pincode 412210
Sold here at
₹3,852
per sq ft, 3 registered sales
Available
1, 2 BHK
21 left · 461–711 sq ft
Possession
Dec 2027
as filed with MahaRERA
A stock photograph, not Daksha Enclave. We have no picture of this site yet.

Where this is

Golegaon, Pune, 412210

Street map of Golegaon centred on the coordinate filed for Daksha Enclave, about 1.4 km across.
Streets within about 700 m of the pin the promoter filed. Map data © OpenStreetMap contributors.
Village
Shirur Gramin
Taluka
Shirur
Pincode
412210
Coordinates
18.812705, 74.364526

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 24 flats are filed unit by unit with the authority, the highest on floor 4. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

1 BHK 20 units · 17 available

4 units 461 sq ft 42.84 sq m as filed
4 units 475 sq ft 44.13 sq m as filed
4 units 480 sq ft 44.62 sq m as filed
4 units 487 sq ft 45.26 sq m as filed
4 units 493 sq ft 45.83 sq m as filed

2 BHK 4 units · all available

4 units 711 sq ft 66.02 sq m as filed
Units sold

3 / 24

Early sales

12% absorption rate

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

1 BHK 20 flats · 17 available

461 sq ft carpet as drawn, from 461–493 sq ft filed in this configuration

Carpet, filed
461 sq ft
Built-up
about 553 sq ft
Super built-up
about 645 sq ft
Every room in this flat

Living and dining about 173 sq ft, Master bedroom about 115 sq ft, Kitchen about 69 sq ft, Bath about 40 sq ft, Balcony about 40 sq ft, Passage about 23 sq ft.

2 BHK 4 flats · 4 available

711 sq ft carpet as drawn

Carpet, filed
711 sq ft
Built-up
about 853 sq ft
Super built-up
about 995 sq ft
Every room in this flat

Living and dining about 207 sq ft, Master bedroom about 138 sq ft, Second bedroom about 110 sq ft, Kitchen about 83 sq ft, Bath about 48 sq ft, Balcony about 48 sq ft, Second bath about 41 sq ft, Passage about 35 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹3,852 per sq ft of carpet, median of 3 registered sales
Range across those sales ₹3,748 to ₹4,633 per sq ft
Sold and booked 0 sold, 3 booked
Still available 21 flats, 461–711 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Dec 2027
Current status Due Dec 2027

Stable projection

No delay reported in the latest RERA filings. Construction is recorded against the original baseline date the promoter registered.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

Gat No 941/942 Plot No 3 is the plot this project is built on, as filed
Revenue village Shirur Gramin · shown on this site as Golegaon
TalukaShirur
Street, as filed Daksha Enclave, Plot No. 3, Old Shirur Nhavare Road, Tardobachi Wadi, Shirur
Bounded north by Plot No 1 and Plot 2 of the same layout
Bounded east by Road and Madhukosh Building
Bounded south by Open space of the Layout
Bounded west by 9m Layout Road

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerAjit Govindlal Mutha
Registered officeA-42, Giridhar Haveli, Vinit Society, Pune Merchant Bank, Kothrud, Pune 411038

Professionals named on the filing

Architect Dwellion ThreeHundred PMRDA/ENG/136/2025-2027
Engineer Ajit Mutha
Chartered Accountant K K R G AND ASSOCIATES through Kishorlal T Gandhi 046374

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

31 December 2024 is when an advocate last certified the title to this land
Title report SearchTitle.pdf 31 December 2024
Promoter's declaration, Form B Form B.pdf 1 January 2025

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100079318
Promoter Ajit Govindlal Mutha
Project typeResidential / Group Housing · Building development
LocalityGolegaon — Shirur taluka, pincode 412210
Applied on01 January 2025
Registered on28 February 2025
Completion, as first filed25 December 2027
Due25 December 2027
Units declared24
Units sold 3 of 24 sold (12%), 21 still unsold
Complaints0 on record with MahaRERA
Certificate on file Original registration certificate, issued 28 February 2025
Application referenceREA52100166283
Current statusActive
Record last changed 28 February 2025 · 18 months ago

Where the sold count comes from, and whether it holds up. 3 of 24 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 24 flats and reaches the same answer — 0 sold, 3 booked with a price agreed but nothing received yet, and 21 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 28 February 2025.

Common questions

Is Daksha Enclave registered with MahaRERA?
Yes. It is registered as P52100079318, filed on 28 February 2025, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Daksha Enclave due to be handed over?
The promoter has told MahaRERA December 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Daksha Enclave been delayed?
No. December 2027 is the date first filed with the authority and it has not moved since.
What did buyers actually pay in Daksha Enclave?
A median of ₹3,852 per square foot of carpet, across 3 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Daksha Enclave?
21 of 24 were still unsold at the promoter's last filing, in 1, 2 BHK, from 461–711 sq ft of carpet.
Are there complaints against Daksha Enclave?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Daksha Enclave?
Ajit Govindlal Mutha, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 12 September 2026. The authority's own page for P52100079318 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Golegaon