Z Zomefy

RERA registered P52100079835 Active

Parkland 1 D Building

Ghorpadi, Pune · Others by Yashvastu Developers

Official record Updated from the register 21 September 2026. Anything filed since then is not here yet.

In short

Parkland 1 D Building in Ghorpadi is MahaRERA-registered (P52100079835) and still under construction, with possession filed for January 2030. Buyers have already registered 44 sales here at a median ₹8,668 per sq ft of carpet — not an asking price. About 63% of the 70 units are sold. Yashvastu Developers is the promoter.

Stock image, not a photograph of Parkland 1 D Building Stock image
Where
Ghorpadi
pincode 411001
Sold here at
₹8,668
per sq ft, 44 registered sales
Available
2 BHK, 3 BHK, Shops
26 left · 809–1,468 sq ft
Now due
Jan 2030
4 months later than first promised
A stock photograph, not Parkland 1 D Building. We have no picture of this site yet.

Where this is

Ghorpadi, PMC, Pune, 411001

Village
Ghorpadi
Taluka
Haveli
Pincode
411001

The promoter filed a coordinate that falls outside Pune district, so it is not used here. The link above searches Maps by name and locality instead.

Unit sizes on file

All 70 units are filed unit by unit with the authority, the highest on floor 7. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

2 BHK 36 units · 5 available

26 units 862 sq ft 80.08 sq m as filed
8 units 886 sq ft 82.31 sq m as filed
2 units 993 sq ft 92.25 sq m as filed

3 BHK 24 units · 11 available

1 unit 862 sq ft 80.08 sq m as filed
23 units 1154 sq ft 107.21 sq m as filed

Shops 10 units · all available

1 unit 809 sq ft 75.15 sq m as filed
3 units 815 sq ft 75.71 sq m as filed
2 units 910 sq ft 84.54 sq m as filed
1 unit 914 sq ft 84.91 sq m as filed
1 unit 923 sq ft 85.74 sq m as filed
1 unit 1033 sq ft 95.96 sq m as filed
1 unit 1468 sq ft 136.4 sq m as filed
Units sold

44 / 70

Selling steadily

63% absorption rate

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.

2 BHK 36 units · 5 available

862 sq ft carpet as drawn, from 862–993 sq ft filed in this configuration

Carpet, filed
862 sq ft
Built-up
about 1,034 sq ft
Super built-up
about 1,207 sq ft
Every room in this unit

Living and dining about 251 sq ft, Master bedroom about 167 sq ft, Second bedroom about 134 sq ft, Kitchen about 100 sq ft, Bath about 59 sq ft, Balcony about 59 sq ft, Second bath about 50 sq ft, Passage about 42 sq ft.

3 BHK 24 units · 11 available

1,154 sq ft carpet as drawn, from 862–1,154 sq ft filed in this configuration

Carpet, filed
1,154 sq ft
Built-up
about 1,385 sq ft
Super built-up
about 1,616 sq ft
Every room in this unit

Living and dining about 284 sq ft, Master bedroom about 189 sq ft, Second bedroom about 151 sq ft, Third bedroom about 123 sq ft, Kitchen about 114 sq ft, Bath about 66 sq ft, Balcony about 66 sq ft, Second bath about 57 sq ft, Passage about 57 sq ft, Third bath about 47 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹8,668 per sq ft of carpet, median of 44 registered sales
Range across those sales ₹7,703 to ₹10,848 per sq ft
Sold and booked 44 sold, 0 booked
Still available 26 units, 809–1468 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Sep 2029
Current status Due Jan 2030

Revised projection

The completion date has moved from September 2029 to January 2030, 4 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

70A/2 70A/3 70A/1A+1B+1C,70A/1B+C(Pt),CTS No.809,873,881 is the plot this project is built on, as filed
Revenue village Ghorpadi
TalukaHaveli
Street, as filed BT Kawade Road
Bounded north by By part of survey No 70A1A
Bounded east by By 9 mtrs Wide DP Road
Bounded south by By part of survey No 70A4
Bounded west by By 18 mtrs Wide DP Road

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerYashvastu Developers
Registered officeS. No. 70/A, 1 2 3, Park Land, B. T. Kawade, Near Balaji Mandir, Ghorpadi, Pune 411001

Professionals named on the filing

Architect Vishal J Deshpande CA2008/42068
Engineer Fidesto ProjectsPrivate Limited
Chartered Accountant Priyanka Chordiya & Associates 166922
Chartered Accountant Sac & Co LLP 154711

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

12 March 2025 is when an advocate last certified the title to this land
Title report 1 Final Legal report_compressed.pdf 12 March 2025
Promoter's declaration, Form B form B_stamp paper_to be notarised_compress.pdf 6 February 2025

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100079835
Promoter Yashvastu Developers
Project typeOthers · Building development
LocalityGhorpadi — Haveli taluka, pincode 411001
Applied on15 February 2025
Registered on27 March 2025
Completion, as first filed30 September 2029
Due30 January 2030 4 months later
Units declared70
Units sold 44 of 70 sold (63%), 26 still unsold
Complaints0 on record with MahaRERA
Certificate on file Original registration certificate, issued 27 March 2025
Application referenceREA52100167895
Current statusActive
Record last changed 27 March 2025 · 18 months ago

Where the sold count comes from, and whether it holds up. 44 of 70 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 70 units and reaches the same answer — 44 sold, every one with money recorded as received against a named unit, and 26 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 27 March 2025.

Common questions

Is Parkland 1 D Building registered with MahaRERA?
Yes. It is registered as P52100079835, filed on 27 March 2025, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Parkland 1 D Building due to be handed over?
The promoter has told MahaRERA January 2030. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Parkland 1 D Building been delayed?
Yes. The first date filed was September 2029. It now stands at January 2030, 4 months later.
What did buyers actually pay in Parkland 1 D Building?
A median of ₹8,668 per square foot of carpet, across 44 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many units are left in Parkland 1 D Building?
26 of 70 were still unsold at the promoter's last filing, in 2, 3 BHK + shops, from 809–1,468 sq ft of carpet.
Are there complaints against Parkland 1 D Building?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Parkland 1 D Building?
Yashvastu Developers, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 21 September 2026. The authority's own page for P52100079835 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Ghorpadi

Stock image, not a photograph of 9 Tara Crest Stock image
Nearby
₹10,750
On offer
3 BHK
Under construction

9 Tara Crest

Srichaitanya Space Private Limited · Ghorpadi

0 sold
Slipped 4 months
Due
Jul 2030
Units
40
Carpet
1,205–1,301
Typical flat
~₹1.3 crore
PR1260002502197
Stock image, not a photograph of Amaira Stock image
Nearby
₹13,307
On offer
2 BHK
Under construction

Amaira

Pridecraft Developers · Ghorpadi

0 sold
Slipped 4 months
Due
Oct 2028
Units
12
Carpet
571–775
Typical flat
~₹83.1 lakh
PR1260002500681