Z Zomefy

RERA registered P52100047895 Completed

Park Infinia - B1 and B2

Fursungi, Pune · Residential / Group Housing by Kumar Properties and Real Estate Pvt. Ltd.

Official record Updated from the register 10 October 2026. Anything filed since then is not here yet.

In short

Park Infinia - B1 and B2 in Fursungi is MahaRERA-registered (P52100047895) and was handed over in October 2025. Buyers have already registered 93 sales here at a median ₹9,309 per sq ft of carpet — not an asking price. About 99% of the 94 units are sold. Kumar Properties and Real Estate Pvt. Ltd. is the promoter.

Stock image, not a photograph of Park Infinia - B1 and B2 Stock image
Where
Fursungi
pincode 412308
Sold here at
₹9,309
per sq ft, 93 registered sales
Available
2 BHK
1 left · 587 sq ft
Now due
Oct 2025
3 months later than first promised
A stock photograph, not Park Infinia - B1 and B2. We have no picture of this site yet.

Where this is

Fursungi, PMC, Pune, 412308

Village
Fursungi
Taluka
Haveli
Pincode
412308
Coordinates
18.484436, 73.957380

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 94 flats are filed unit by unit with the authority, the highest on floor 12. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

2 BHK 94 units · 1 available

94 units 587 sq ft 54.5 sq m as filed
Units sold

93 / 94

Nearly sold out

99% absorption rate

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

2 BHK 94 flats · 1 available

587 sq ft carpet as drawn

Carpet, filed
587 sq ft
Built-up
about 704 sq ft
Super built-up
about 822 sq ft
Every room in this flat

Living and dining about 171 sq ft, Master bedroom about 114 sq ft, Second bedroom about 91 sq ft, Kitchen about 68 sq ft, Bath about 40 sq ft, Balcony about 40 sq ft, Second bath about 34 sq ft, Passage about 28 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹9,309 per sq ft of carpet, median of 93 registered sales
Range across those sales ₹8,929 to ₹9,842 per sq ft
Sold and booked 93 sold, 0 booked
Still available 1 flat, 587 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Jul 2025
Current status Handed over Oct 2025

Revised projection

The completion date has moved from July 2025 to October 2025, 3 months later, on the promoter's own revised filing.

Buyers who took possession late here may still have had a claim under section 18 of the Real Estate (Regulation and Development) Act, which entitles them to interest for every month of delay beyond the date in their agreement. More usefully for anyone buying today, this is a record of how this promoter performed against their own filed date.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

214P 220P 221P is the plot this project is built on, as filed
Revenue village Fursungi
TalukaHaveli
Street, as filed Pune Saswad Road
Bounded north by Existing Buildings of Park Infinia
Bounded east by Adjoining Plot
Bounded south by By Road
Bounded west by Adjoining Plot

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerKumar Properties and Real Estate Pvt. Ltd.
Registered office2413, Kumar Capital, East Street, Beside Axis Bank, Camp, Pune 411001
Registered agents 80 licensed agents may sell this project

Professionals named on the filing

Architect Vishal J Deshpande CA/2008/42068
Engineer Harshad Pendse NA
Chartered Accountant GMKS & Co. 134685
Chartered Accountant Supriya Abhijit Mundada 156545

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

5 September 2022 is when an advocate last certified the title to this land
Title report 220902_Legal Title Opinion_compressed.pdf 5 September 2022 3 older versions on file
Promoter's declaration, Form B 6_Form B_Declaration.pdf 17 June 2022

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100047895
Promoter Kumar Properties and Real Estate Pvt. Ltd.
Project typeResidential / Group Housing · Building development
LocalityFursungi — Haveli taluka, pincode 412308
Applied on08 July 2022
Registered on01 December 2022
Completion, as first filed01 July 2025
Handed over01 October 2025 3 months later
Units declared94
Units sold 93 of 94 sold (99%), 1 still unsold
Complaints0 on record with MahaRERA
Certificate on file Extension certificate, issued 14 August 2026
Application referenceREA52100115049
Current statusCompleted
Record last changed 14 August 2026 · 2 months ago

Where the sold count comes from, and whether it holds up. 93 of 94 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 94 flats and reaches the same answer — 93 sold, every one with money recorded as received against a named flat, and 1 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 14 August 2026.

Common questions

Is Park Infinia - B1 and B2 registered with MahaRERA?
Yes. It is registered as P52100047895, filed on 01 December 2022, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
Has Park Infinia - B1 and B2 been handed over?
Yes. The completion date on the register is October 2025.
Has Park Infinia - B1 and B2 been delayed?
Yes. The first date filed was July 2025. It now stands at October 2025, 3 months later.
What did buyers actually pay in Park Infinia - B1 and B2?
A median of ₹9,309 per square foot of carpet, across 93 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Park Infinia - B1 and B2?
1 of 94 were still unsold at the promoter's last filing, in 2 BHK, from 587 sq ft of carpet.
Are there complaints against Park Infinia - B1 and B2?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Park Infinia - B1 and B2?
Kumar Properties and Real Estate Pvt. Ltd., as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 10 October 2026. The authority's own page for P52100047895 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Fursungi