RERA registered P52100034823 Active
Pacific Tower
Fursungi, Pune · Others by Chaitanya Developers
Official record Updated from the register 16 September 2026. Anything filed since then is not here yet.
In short
Pacific Tower in Fursungi is MahaRERA-registered (P52100034823) and still under construction, with possession filed for September 2027. Buyers have already registered 133 sales here at a median ₹7,566 per sq ft of carpet — not an asking price. About 73% of the 193 units are sold. Chaitanya Developers is the promoter.
- Sold here at
- ₹7,566
- per sq ft, 133 registered sales
- Available
- 1 BHK, 2 BHK, Shops
- 29 left · 302–660 sq ft
- Now due
- Sep 2027
- 1.5 years later than first promised
Where this is
Fursungi, PMC, Pune, 412308
No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.
Unit sizes on file
All 193 units are filed unit by unit with the authority, the highest on floor 12. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
1 BHK 101 units · 9 available
2 BHK 79 units · 15 available
3 BHK 1 unit · all sold
Shops 12 units · 5 available
140 / 193
73% absorption rate
Visual area guide See what the filed sizes feel like 3 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.
1 BHK 101 units · 9 available
443 sq ft carpet as drawn, from 443–660 sq ft filed in this configuration
- Carpet, filed
- 443 sq ft
- Built-up
- about 532 sq ft
- Super built-up
- about 620 sq ft
Every room in this unit
Living and dining about 166 sq ft, Master bedroom about 111 sq ft, Kitchen about 66 sq ft, Bath about 39 sq ft, Balcony about 39 sq ft, Passage about 22 sq ft.
2 BHK 79 units · 15 available
570 sq ft carpet as drawn, from 570–662 sq ft filed in this configuration
- Carpet, filed
- 570 sq ft
- Built-up
- about 684 sq ft
- Super built-up
- about 798 sq ft
Every room in this unit
Living and dining about 166 sq ft, Master bedroom about 111 sq ft, Second bedroom about 89 sq ft, Kitchen about 66 sq ft, Bath about 39 sq ft, Balcony about 39 sq ft, Second bath about 33 sq ft, Passage about 28 sq ft.
3 BHK 1 unit · none available
595 sq ft carpet as drawn
- Carpet, filed
- 595 sq ft
- Built-up
- about 714 sq ft
- Super built-up
- about 833 sq ft
Every room in this unit
Living and dining about 146 sq ft, Master bedroom about 98 sq ft, Second bedroom about 78 sq ft, Third bedroom about 63 sq ft, Kitchen about 59 sq ft, Bath about 34 sq ft, Balcony about 34 sq ft, Second bath about 29 sq ft, Passage about 29 sq ft, Third bath about 24 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹6,793 to ₹10,039 per sq ft |
|---|---|
| Sold and booked | 135 sold, 5 booked |
| Still available | 29 units, 248–662 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Revised projection
The completion date has moved from March 2026 to September 2027, 1.5 years later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Fursungi |
|---|---|
| Taluka | Haveli |
| Street, as filed | - |
| Bounded north by | BY REMAINING PART OF S NO 176 |
| Bounded east by | BY 12 MTR WIDE ROAD |
| Bounded south by | BY 12 MTR WIDE ROAD AND REMAINING PART OF S NO 176 |
| Bounded west by | BY REMAINING PART OF S NO 176 |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Chaitanya Developers |
|---|---|
| Registered office | 2387, At Post Uruli Devachi, Saswad Road, Near Gangotri Hotel, Pune 412308 |
Professionals named on the filing
| Architect | Atit Admulwar Architects CA/2008/41887 |
|---|---|
| Engineer | Kharat Yogesh Vasant |
| Chartered Accountant | Rsms And Associates 122547 |
| Chartered Accountant | Yogesh D Mali 194796 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report title Report.pdf | 24 March 2025 1 older version on file |
|---|---|
| Promoter's declaration, Form B Form B promoter_compressed (1).pdf | 1 April 2022 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100034823 |
| Promoter | Chaitanya Developers |
| Project type | Others · Building development |
| Locality | Fursungi — Haveli taluka, pincode 412308 |
| Applied on | 07 April 2022 |
| Registered on | 28 April 2022 |
| Completion, as first filed | 31 March 2026 |
| Due | 30 September 2027 1.5 years later |
| Units declared | 193 |
| Units sold | 140 of 193 sold (73%), 53 still unsold |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Extension certificate, issued 18 April 2026 |
| Application reference | REA52100106326 |
| Current status | Active |
| Record last changed | 09 June 2026 · 3 months ago |
Where the sold count comes from, and whether it holds up. 140 of 193 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 193 units and reaches the same answer — 135 sold, every one with money recorded as received against a named unit, 5 booked with a price agreed but nothing received yet, and 29 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 09 June 2026.
Common questions
- Is Pacific Tower registered with MahaRERA?
- Yes. It is registered as P52100034823, filed on 28 April 2022, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Pacific Tower due to be handed over?
- The promoter has told MahaRERA September 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Pacific Tower been delayed?
- Yes. The first date filed was March 2026. It now stands at September 2027, 1.5 years later.
- What did buyers actually pay in Pacific Tower?
- A median of ₹7,566 per square foot of carpet, across 133 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many units are left in Pacific Tower?
- 29 of 193 were still unsold at the promoter's last filing, in 1, 2 BHK + shops, from 302–660 sq ft of carpet.
- Are there complaints against Pacific Tower?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Pacific Tower?
- Chaitanya Developers, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 16 September 2026. The authority's own page for P52100034823 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Fursungi
Stock image
- Registered here
- ₹5,520
- On offer
- 1 BHK + shops
- Due
- Mar 2028
- Units
- 105
- Carpet
- 160–675
- Sold at
- ₹27.2 lakh
Stock image
- Registered here
- ₹5,170
- On offer
- 1, 2, 3 BHK + shops
- Due
- Dec 2028
- Units
- 354
- Carpet
- 166–863
- Sold at
- ₹20.3 lakh
Stock image
- Nearby
- ₹6,691–7,215
- On offer
- 2, 3 BHK +2 more
- Due
- Dec 2028
- Units
- 60
- Carpet
- 336–2,049
- Typical unit
- ~₹45.4 lakh