RERA registered PM1260002600769 Active
Silverise Radiant Tower
Dudulgaon, Pune · Mixed by Silverise Radiant Tower LLP
Official record Updated from the register 10 October 2026. Anything filed since then is not here yet.
In short
Silverise Radiant Tower in Dudulgaon is MahaRERA-registered (PM1260002600769) and still under construction, with possession filed for September 2030. Buyers have already registered 12 sales here at a median ₹6,656 per sq ft of carpet — not an asking price. About 5% of the 242 units are sold. Silverise Radiant Tower LLP is the promoter.
- Sold here at
- ₹6,656
- per sq ft, 12 registered sales
- Available
- 2 BHK, 3 BHK, Office Space, Shops
- 180 left · 260–1,289 sq ft
- Now due
- Sep 2030
- 4 months later than first promised
Where this is
Dudulgaon, PCMC, Pune, 412105
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Unit sizes on file
All 242 units are filed unit by unit with the authority, the highest on floor 18. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
2 BHK 135 units · 93 available
3 BHK 67 units · 53 available
Office Space 32 units · 29 available
Shops 8 units · 5 available
12 / 242
5% absorption rate
Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.
2 BHK 135 units · 93 available
670 sq ft carpet as drawn, from 615–670 sq ft filed in this configuration
- Carpet, filed
- 670 sq ft
- Built-up
- about 804 sq ft
- Super built-up
- about 938 sq ft
Every room in this unit
Living and dining about 195 sq ft, Master bedroom about 130 sq ft, Second bedroom about 104 sq ft, Kitchen about 78 sq ft, Bath about 46 sq ft, Balcony about 46 sq ft, Second bath about 39 sq ft, Passage about 33 sq ft.
3 BHK 67 units · 53 available
762 sq ft carpet as drawn, from 742–769 sq ft filed in this configuration
- Carpet, filed
- 762 sq ft
- Built-up
- about 914 sq ft
- Super built-up
- about 1,067 sq ft
Every room in this unit
Living and dining about 187 sq ft, Master bedroom about 125 sq ft, Second bedroom about 100 sq ft, Third bedroom about 81 sq ft, Kitchen about 75 sq ft, Bath about 44 sq ft, Balcony about 44 sq ft, Second bath about 37 sq ft, Passage about 37 sq ft, Third bath about 31 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹6,124 to ₹6,861 per sq ft |
|---|---|
| Sold and booked | 12 sold, 0 booked |
| Still available | 180 units, 260–4821 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Revised projection
The completion date has moved from May 2030 to September 2030, 4 months later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Dudulgaon |
|---|---|
| Taluka | Haveli |
| Street, as filed | Dudulgaon |
| Bounded north by | By Moshi – Alandi Road |
| Bounded east by | By Remaining land of Gat No. 175 |
| Bounded south by | By Land of Mr. Pandharinath Kurhade and thereafter Gat No. 176 |
| Bounded west by | By Remaing land of Mrs. Padma Kale out of Gat No. 175 |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Silverise Radiant Tower LLP |
|---|---|
| Registered office | Gat No 144, Silver Gardenia, Borhadewadi, Pune, Moshi 412105 |
Professionals named on the filing
| Architect | Mahendra Thakur and Associates CA/2004/34769 |
|---|---|
| Engineer | Dhammpal Deorao Mhaske LE/0097/2022 |
| Chartered Accountant | Navdeep Jindal And Associates 164075 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report search title final radiant tower signed.pdf | 4 June 2026 |
|---|---|
| Conveyance deed 7_12 Dudulgaon.pdf | 4 June 2026 |
| Promoter's declaration, Form B 9 Promoter Declaration_FORM B P.pdf | 2 June 2026 |
| Annexure A declaration 33 ANNEXURE - A declaration for one plot one project New.pdf | 4 June 2026 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | PM1260002600769 |
| Promoter | Silverise Radiant Tower LLP |
| Project type | Mixed · Building development |
| Locality | Dudulgaon — Haveli taluka, pincode 412105 |
| Applied on | 04 June 2026 |
| Registered on | 15 June 2026 |
| Completion, as first filed | 31 May 2030 |
| Due | 30 September 2030 4 months later |
| Units declared | 242 |
| Units sold | 12 of 242 sold (5%), 230 still unsold |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Corrected certificate, issued 01 October 2026 |
| Application reference | ACK29052601251 |
| Current status | Active |
| Record last changed | 15 June 2026 · 4 months ago |
Where the sold count comes from, and whether it holds up. 12 of 242 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 242 units and reaches the same answer — 12 sold, every one with money recorded as received against a named unit, and 180 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 15 June 2026.
Common questions
- Is Silverise Radiant Tower registered with MahaRERA?
- Yes. It is registered as PM1260002600769, filed on 15 June 2026, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Silverise Radiant Tower due to be handed over?
- The promoter has told MahaRERA September 2030. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Silverise Radiant Tower been delayed?
- Yes. The first date filed was May 2030. It now stands at September 2030, 4 months later.
- What did buyers actually pay in Silverise Radiant Tower?
- A median of ₹6,656 per square foot of carpet, across 12 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many units are left in Silverise Radiant Tower?
- 180 of 242 were still unsold at the promoter's last filing, in 2, 3 BHK +2 more, from 260–1,289 sq ft of carpet.
- Are there complaints against Silverise Radiant Tower?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Silverise Radiant Tower?
- Silverise Radiant Tower LLP, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 10 October 2026. The authority's own page for PM1260002600769 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Dudulgaon
Stock image
- Nearby
- ₹6,853
- On offer
- 2 BHK
- Due
- Feb 2028
- Units
- 18
- Carpet
- 556
- Typical flat
- ~₹38.1 lakh
Stock image
- Locality median
- ₹6,742
- On offer
- 1 BHK
Pradhan Mantri Awas Yojana-Dudulgaon
- Due
- Oct 2027
- Units
- 1190
- Carpet
- 320
- Typical flat
- ~₹21.6 lakh
Stock image
- Nearby
- ₹6,303–6,853
- On offer
- 2, 3 BHK + shops
- Due
- Apr 2031
- Units
- 84
- Carpet
- 367–7,012
- Typical unit
- ~₹42.7 lakh