RERA registered PM1260002600527 Active
24Liife Prospeeria
Dudulgaon, Pune · Mixed by 24Liife Infraa Private Limited
Official record Updated from the register 21 November 2026. Anything filed since then is not here yet.
In short
24Liife Prospeeria in Dudulgaon is MahaRERA-registered (PM1260002600527) and still under construction, with possession filed for February 2032. Buyers have already registered 6 sales here at a median ₹6,946 per sq ft of carpet — not an asking price. About 5% of the 126 units are sold. 24Liife Infraa Private Limited is the promoter.
- Sold here at
- ₹6,946
- per sq ft, 6 registered sales
- Available
- 2 BHK, 3 BHK, Office Space, Shops
- 95 left · 213–793 sq ft
- Now due
- Feb 2032
- 4 months later than first promised
Dudulgaon, PCMC, Pune, 412105
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Unit sizes on file
All 126 units are filed unit by unit with the authority, the highest on floor 13. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
2 BHK Residences
3 BHK Residences
Other Residences
Office Space Suite
Shops Suite
Carpet Area vs. Loading Factor Arithmetic
How statutory carpet translates to standard Pune market quoted areas (+20% Built-up, +40% Super Built-up)
| Unit Configuration | Statutory RERA Carpet (Actual) | Approx Built-up (+20%) | Super Built-up (+40% Loading) | Available Inventory |
|---|---|---|---|---|
| 2 BHK | 635 sq ft (59.0 sq m) | ~762 sq ft | ~889 sq ft | 30 left of 34 |
| 3 BHK | 742 – 793 sq ft (68.9 – 73.67 sq m) | ~890 – 952 sq ft | ~1039 – 1110 sq ft | 31 left of 33 |
| Other | 322 – 793 sq ft (29.87 – 73.67 sq m) | ~386 – 952 sq ft | ~451 – 1110 sq ft | 16 left of 41 |
| Office Space | 213 – 590 sq ft (19.82 – 54.77 sq m) | ~256 – 708 sq ft | ~298 – 826 sq ft | 10 left of 10 |
| Shops | 235 – 613 sq ft (21.83 – 56.96 sq m) | ~282 – 736 sq ft | ~329 – 858 sq ft | 8 left of 8 |
6 / 126
5% absorption rate
Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.
2 BHK 34 units · 30 available
635 sq ft carpet as drawn
- Carpet, filed
- 635 sq ft
- Built-up
- about 762 sq ft
- Super built-up
- about 889 sq ft
Every room in this unit
Living and dining about 185 sq ft, Master bedroom about 123 sq ft, Second bedroom about 99 sq ft, Kitchen about 74 sq ft, Bath about 43 sq ft, Balcony about 43 sq ft, Second bath about 37 sq ft, Passage about 31 sq ft.
3 BHK 33 units · 31 available
742 sq ft carpet as drawn, from 742–793 sq ft filed in this configuration
- Carpet, filed
- 742 sq ft
- Built-up
- about 890 sq ft
- Super built-up
- about 1,039 sq ft
Every room in this unit
Living and dining about 182 sq ft, Master bedroom about 122 sq ft, Second bedroom about 97 sq ft, Third bedroom about 79 sq ft, Kitchen about 73 sq ft, Bath about 43 sq ft, Balcony about 43 sq ft, Second bath about 36 sq ft, Passage about 36 sq ft, Third bath about 30 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹6,722 to ₹7,512 per sq ft |
|---|---|
| Sold and booked | 0 sold, 6 booked |
| Still available | 95 units, 213–793 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Revised delivery projection
The completion date has moved from October 2031 to February 2032, 4 months later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Dudulgaon |
|---|---|
| Taluka | Haveli |
| Street, as filed | Moshi Alandi Road |
| Bounded north by | By property of shri. Sukhadev Talekar out of Gat no 208 & 18 mtr PCMC DP Road |
| Bounded east by | By property of shri. Saste out of Gat no 201 & property of shri. Wahile out of Gat no 200 |
| Bounded south by | By property out of Gat no 207 & property of shri. Dnyaneshwar Talekar & others out of Gat no 204 |
| Bounded west by | By property of shri. Tidke & others out of Gat no 206 & property of shri. Dnyaneshwar Talekar out of Gat no 204 |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | 24Liife Infraa Private Limited |
|---|---|
| Registered office | Office No. M-1004, 10th Floor, City Avenue Commercial Building, Shankar Kalate Nagar, Mumbai-Banglore Highway, Near Phoenix Mall Of The Millennium, Pune 411057 |
Professionals named on the filing
| Architect | Landmark Desgin Group CA/110/13423 |
|---|---|
| Engineer | Mahadeo Shelar |
| Chartered Accountant | Avishkar Phanse 623915 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report Legal title report in Format A.pdf | 30 March 2026 |
|---|---|
| Conveyance deed GN 207 Satbara .pdf | 30 March 2026 |
| Promoter's declaration, Form B Form B Declaration - Promoter.pdf | 13 May 2026 |
| Annexure A declaration Annexure A.pdf | 16 April 2026 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | PM1260002600527 |
| Promoter | 24Liife Infraa Private Limited |
| Project type | Mixed · Building development |
| Locality | Dudulgaon — Haveli taluka, pincode 412105 |
| Applied on | 24 April 2026 |
| Registered on | 25 May 2026 |
| Completion, as first filed | 31 October 2031 |
| Due | 29 February 2032 4 months later |
| Units declared | 126 |
| Units sold | 6 of 126 sold (5%), 120 still unsold |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 25 May 2026 |
| Application reference | ACK06032607157 |
| Current status | Active |
| Record last changed | 25 May 2026 · 6 months ago |
Where the sold count comes from, and whether it holds up. 6 of 126 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 126 units and reaches the same answer — 0 sold, 6 booked with a price agreed but nothing received yet, and 95 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 25 May 2026.
- Is 24Liife Prospeeria registered with MahaRERA?
- Yes. It is registered as PM1260002600527, filed on 25 May 2026, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is 24Liife Prospeeria due to be handed over?
- The promoter has told MahaRERA February 2032. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has 24Liife Prospeeria been delayed?
- Yes. The first date filed was October 2031. It now stands at February 2032, 4 months later.
- What did buyers actually pay in 24Liife Prospeeria?
- A median of ₹6,946 per square foot of carpet, across 6 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many units are left in 24Liife Prospeeria?
- 95 of 126 were still unsold at the promoter's last filing, in 2, 3 BHK +2 more, from 213–793 sq ft of carpet.
- Are there complaints against 24Liife Prospeeria?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building 24Liife Prospeeria?
- 24Liife Infraa Private Limited, as the promoter named on the registration.
Verify Government Filings Yourself
This dossier restates public records as filed on 21 November 2026. The authority's own registry page for PM1260002600527 carries sanctioned layout drawings, escrow accounts, quarterly progress filings, and title documents.
MahaRERA requires a CAPTCHA first. That is their verification gate, not a broken link.
Other projects in Dudulgaon
Stock image
- Nearby
- ₹6,400–6,874
- On offer
- 2, 3 BHK + shops
- Due
- Jul 2031
- Units
- 26
- Carpet
- 398–1,234
- Typical unit
- ~₹52.1 lakh
Stock image
- Registered here
- ₹7,142
- On offer
- 2, 3 BHK +2 more
- Due
- Apr 2029
- Units
- 141
- Carpet
- 483–759
- Sold at
- ₹44.1 lakh
Stock image
- Nearby
- ₹6,400–6,874
- On offer
- 2, 3 BHK
- Due
- Jun 2029
- Units
- 97
- Carpet
- 629–816
- Typical flat
- ~₹50 lakh