Z Zomefy

RERA registered P52100048999 Completed

Samarth Heritage

Dhayari, Pune · Residential / Group Housing by Shamik Pravin Ladkat

Official record Updated from the register 04 October 2026. Anything filed since then is not here yet.

In short

Samarth Heritage in Dhayari is MahaRERA-registered (P52100048999) and was handed over in June 2026. Buyers have already registered 7 sales here at a median ₹7,049 per sq ft of carpet — not an asking price. About 70% of the 10 units are sold. Shamik Pravin Ladkat is the promoter.

Stock image, not a photograph of Samarth Heritage Stock image
Where
Dhayari
pincode 411041
Sold here at
₹7,049
per sq ft, 7 registered sales
Available
1 BHK
3 left · 435–436 sq ft
Now due
Jun 2026
6 months later than first promised
A stock photograph, not Samarth Heritage. We have no picture of this site yet.

Where this is

Dhayari, PMC, Pune, 411041

Village
Dhayari (Part)
Taluka
Haveli
Pincode
411041
Coordinates
18.444028, 73.814002

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 10 flats are filed unit by unit with the authority, the highest on floor 5. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

1 BHK 10 units · 3 available

5 units 435 sq ft 40.37 sq m as filed
5 units 436 sq ft 40.5 sq m as filed
Units sold

7 / 10

Selling steadily

70% absorption rate

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

1 BHK 10 flats · 3 available

435 sq ft carpet as drawn, from 435–436 sq ft filed in this configuration

Carpet, filed
435 sq ft
Built-up
about 522 sq ft
Super built-up
about 609 sq ft
Every room in this flat

Living and dining about 163 sq ft, Master bedroom about 109 sq ft, Kitchen about 65 sq ft, Bath about 38 sq ft, Balcony about 38 sq ft, Passage about 22 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹7,049 per sq ft of carpet, median of 7 registered sales
Range across those sales ₹5,408 to ₹7,587 per sq ft
Sold and booked 7 sold, 0 booked
Still available 3 flats, 435–436 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Dec 2025
Current status Handed over Jun 2026

Revised projection

The completion date has moved from December 2025 to June 2026, 6 months later, on the promoter's own revised filing.

Buyers who took possession late here may still have had a claim under section 18 of the Real Estate (Regulation and Development) Act, which entitles them to interest for every month of delay beyond the date in their agreement. More usefully for anyone buying today, this is a record of how this promoter performed against their own filed date.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

SURVEY NUMBER 5, HISSA NUMBER 19/2, is the plot this project is built on, as filed
Revenue village Dhayari (Part) · shown on this site as Dhayari
TalukaHaveli
Street, as filed BENKARWASTI ROAD, DHAYARI
Bounded north by BY PROPERTY OF SURVY NUMBER-2 PART
Bounded east by 06 METER WIDE INTERNAL ROAD
Bounded south by BY PROPERTY OF CHANDEKAR AND NIKAM
Bounded west by BY PROPERTY OF SUNIL JAVALEKAR

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerShamik Pravin Ladkat
Registered office101, Sankalp Building, Sinhgad Road, Opposite To Rakshalekha Society, Ganeshmala, Pune 411030

Professionals named on the filing

Architect Rohit parinchekar CA/2010/50709
Engineer Dadasaheb Hinge
Engineer Shankar Bade
Chartered Accountant Akshay Baheti And Co
Chartered Accountant CA Mohmedyasir A Bagwan 625692

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

18 December 2022 is when an advocate last certified the title to this land
Title report Search Report 18-12-2022.pdf 18 December 2022
Promoter's declaration, Form B Form-'B' .pdf 18 December 2022

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100048999
Promoter Shamik Pravin Ladkat
Project typeResidential / Group Housing · Building development
LocalityDhayari — Haveli taluka, pincode 411041
Applied on22 December 2022
Registered on24 January 2023
Completion, as first filed31 December 2025
Handed over30 June 2026 6 months later
Units declared10
Units sold 7 of 10 sold (70%), 3 still unsold
Complaints0 on record with MahaRERA
Certificate on file Corrected certificate, issued 20 August 2026
Application referenceREA52100126615
Current statusCompleted
Record last changed 16 April 2026 · 6 months ago

Where the sold count comes from, and whether it holds up. 7 of 10 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 10 flats and reaches the same answer — 7 sold, every one with money recorded as received against a named flat, and 3 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 16 April 2026.

Common questions

Is Samarth Heritage registered with MahaRERA?
Yes. It is registered as P52100048999, filed on 24 January 2023, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
Has Samarth Heritage been handed over?
Yes. The completion date on the register is June 2026.
Has Samarth Heritage been delayed?
Yes. The first date filed was December 2025. It now stands at June 2026, 6 months later.
What did buyers actually pay in Samarth Heritage?
A median of ₹7,049 per square foot of carpet, across 7 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Samarth Heritage?
3 of 10 were still unsold at the promoter's last filing, in 1 BHK, from 435–436 sq ft of carpet.
Are there complaints against Samarth Heritage?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Samarth Heritage?
Shamik Pravin Ladkat, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 04 October 2026. The authority's own page for P52100048999 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Dhayari

Stock image, not a photograph of Madhushree Stock image
Registered here
₹7,376
On offer
1 BHK
Ready to move

Madhushree

Kpl Build Con LLP · Dhayari

26 sold
Done
May 2026
Units
43
Carpet
422–443
Sold at
₹32.5 lakh
P52100051809
Stock image, not a photograph of Sushila Stock image
Registered here
₹6,930
On offer
2 BHK
Ready to move

Sushila

Parulekarkale Realty LLP · Dhayari

71 sold
Slipped 9 months
Done
Mar 2026
Units
24
Carpet
608–662
Sold at
₹44 lakh
P52100050888