Z Zomefy

RERA registered P52100016536 Active

Ravinanda Aamrai Phase 1 Building C

Dhayari, Pune · Residential / Group Housing by Om Sai Developers

Official record Updated from the register 21 September 2026. Anything filed since then is not here yet.

In short

Ravinanda Aamrai Phase 1 Building C in Dhayari is MahaRERA-registered (P52100016536) and still under construction, with possession filed for December 2026. Buyers have already registered 119 sales here at a median ₹5,334 per sq ft of carpet — not an asking price. About 94% of the 126 units are sold. 21 complaints sit on the filing. Om Sai Developers is the promoter.

Stock image, not a photograph of Ravinanda Aamrai Phase 1 Building C Stock image
Where
Dhayari
pincode 411041
Sold here at
₹5,334
per sq ft, 119 registered sales
Available
2 BHK
7 left · 715–750 sq ft
Now due
Dec 2026
3 years later than first promised
A stock photograph, not Ravinanda Aamrai Phase 1 Building C. We have no picture of this site yet.

Where this is

Dhayari, PMC, Pune, 411041

Village
Dhayari (Part)
Taluka
Haveli
Pincode
411041
Coordinates
18.445766, 73.805201

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 126 flats are filed unit by unit with the authority, the highest on floor 16. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

2 BHK 126 units · 7 available

31 units 715 sq ft 66.38 sq m as filed
30 units 737 sq ft 68.48 sq m as filed
64 units 750 sq ft 69.68 sq m as filed
1 unit 929 sq ft 86.29 sq m as filed
Units sold

119 / 126

Nearly sold out

94% absorption rate

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

2 BHK 126 flats · 7 available

750 sq ft carpet as drawn, from 715–929 sq ft filed in this configuration

Carpet, filed
750 sq ft
Built-up
about 900 sq ft
Super built-up
about 1,050 sq ft
Every room in this flat

Living and dining about 218 sq ft, Master bedroom about 146 sq ft, Second bedroom about 117 sq ft, Kitchen about 87 sq ft, Bath about 51 sq ft, Balcony about 51 sq ft, Second bath about 44 sq ft, Passage about 36 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹5,334 per sq ft of carpet, median of 119 registered sales
Range across those sales ₹4,200 to ₹6,284 per sq ft
Sold and booked 119 sold, 0 booked
Still available 7 flats, 715–929 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Dec 2023
Current status Due Dec 2026

Revised projection

The completion date has moved from December 2023 to December 2026, 3 years later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

117/3 is the plot this project is built on, as filed
Revenue village Dhayari (Part) · shown on this site as Dhayari
TalukaHaveli
Street, as filed Chavan Baugh
Bounded north by Adj S No 117 Part
Bounded east by Adj S No 118
Bounded south by Adj S No 123
Bounded west by Adj S No 124

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerOm Sai Developers
Registered officeOffice 36, First Floor, Vastushree Complex, C/O Ravinanda Landmarks, Near Ganga Dham Chowk, Market Yard, Pune 411037
Registered agents 2 licensed agents may sell this project

Professionals named on the filing

Architect Cubix Architects Associates
Architect Cubix Architects Associates CA/2001/28514
Architect Koppa Architecture & Design Consultants
Engineer Lavesh Bapusaheb Patole
Engineer Lavesh Bapusaheb Patole
Engineer Struture Vision
Chartered Accountant Akshay Gala & Associates 646493
Chartered Accountant CA Pramod B. Shah
Chartered Accountant CA Rushabh R. Jain
Chartered Accountant D J S & Associates 135271

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Complaints filed with MahaRERA

21 cases against this project, 21 with an order on record, filed between Nov 2024 and May 2025. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.

Case numberFiledOutcome
CC12501750 May 2025 Order passed May 2025
CC12501751 May 2025 Order passed May 2025
CC12501733 May 2025 Order passed May 2025
CC12501735 May 2025 Order passed May 2025
CC12501737 May 2025 Order passed May 2025
CC12501736 May 2025 Order passed May 2025
CC12501685 May 2025 Order passed May 2025
CC12401113 Dec 2024 Order passed Dec 2024
CC12401094 Dec 2024 Order passed Dec 2024
CC12401093 Dec 2024 Order passed Dec 2024
Show the remaining 11 cases
CC12401070 Dec 2024 Order passed Dec 2024
CC12401071 Dec 2024 Order passed Dec 2024
CC12401061 Dec 2024 Order passed Dec 2024
CC12401035 Dec 2024 Order passed Dec 2024
CC12400938 Nov 2024 Order passed Nov 2024
CC12400914 Nov 2024 Order passed Nov 2024
CC12400927 Nov 2024 Order passed Nov 2024
CC12400916 Nov 2024 Order passed Nov 2024
CC12400915 Nov 2024 Order passed Nov 2024
CC12400919 Nov 2024 Order passed Nov 2024
CC12400789 Nov 2024 Order passed Nov 2024

A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.

Title and ownership papers

15 May 2018 is when an advocate last certified the title to this land
Title report title 1.pdf 15 May 2018 5 older versions on file
Promoter's declaration, Form B Form B.pdf 6 May 2025 1 older version on file

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100016536
Promoter Om Sai Developers
Project typeResidential / Group Housing · Building development
LocalityDhayari — Haveli taluka, pincode 411041
Applied on25 April 2018
Registered on21 May 2018
Completion, as first filed30 December 2023
Due31 December 2026 3 years later
Units declared126
Units sold 119 of 126 sold (94%), 7 still unsold
Complaints21 on record with MahaRERA
Certificate on file Extension certificate, issued 01 July 2026
Application referenceREA52100036555
Current statusActive
Record last changed 11 August 2026 · 41 days ago

Where the sold count comes from, and whether it holds up. 119 of 126 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 126 flats and reaches the same answer — 119 sold, 118 of them with money recorded as received against a named flat, and 7 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 11 August 2026.

Common questions

Is Ravinanda Aamrai Phase 1 Building C registered with MahaRERA?
Yes. It is registered as P52100016536, filed on 21 May 2018, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Ravinanda Aamrai Phase 1 Building C due to be handed over?
The promoter has told MahaRERA December 2026. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Ravinanda Aamrai Phase 1 Building C been delayed?
Yes. The first date filed was December 2023. It now stands at December 2026, 3 years later.
What did buyers actually pay in Ravinanda Aamrai Phase 1 Building C?
A median of ₹5,334 per square foot of carpet, across 119 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Ravinanda Aamrai Phase 1 Building C?
7 of 126 were still unsold at the promoter's last filing, in 2 BHK, from 715–750 sq ft of carpet.
Are there complaints against Ravinanda Aamrai Phase 1 Building C?
21 cases have been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
Who is building Ravinanda Aamrai Phase 1 Building C?
Om Sai Developers, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 21 September 2026. The authority's own page for P52100016536 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Dhayari

Stock image, not a photograph of Swami Aalay Stock image
Nearby
₹7,233
On offer
2 BHK
Under construction

Swami Aalay

Yash Shiwaji Chakankar · Dhayari

0 sold
Slipped 4 months
Due
Apr 2028
Units
13
Carpet
900
Typical flat
~₹65.1 lakh
P52100078360
Stock image, not a photograph of Tulasi Angan Stock image
Registered here
₹5,981
On offer
1 BHK
Under construction

Tulasi Angan

Radhika Developers · Dhayari

17 sold
Due
Apr 2027
Units
24
Carpet
395–445
Sold at
₹23.6 lakh
P52100045493