RERA registered P52100053249 Active
Ramana Myra
Dhayari, Pune · Residential / Group Housing by Sai And Shantishobha Venture
Official record Updated from the register 21 September 2026. Anything filed since then is not here yet.
In short
Ramana Myra in Dhayari is MahaRERA-registered (P52100053249) and still under construction, with possession filed for April 2028. Buyers have already registered 47 sales here at a median ₹7,836 per sq ft of carpet — not an asking price. About 16% of the 299 units are sold. Sai And Shantishobha Venture is the promoter.
- Sold here at
- ₹7,836
- per sq ft, 47 registered sales
- Available
- 1, 2 BHK
- 199 left · 365–628 sq ft
- Now due
- Apr 2028
- 4 months later than first promised
Where this is
Dhayari, PMC, Pune, 411041
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Flat sizes on file
All 299 flats are filed unit by unit with the authority, the highest on floor 12. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
1 BHK 157 units · 119 available
2 BHK 142 units · 80 available
47 / 299
16% absorption rate
Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
1 BHK 157 flats · 119 available
365 sq ft carpet as drawn, from 365–594 sq ft filed in this configuration
- Carpet, filed
- 365 sq ft
- Built-up
- about 438 sq ft
- Super built-up
- about 511 sq ft
Every room in this flat
Living and dining about 137 sq ft, Master bedroom about 91 sq ft, Kitchen about 55 sq ft, Bath about 32 sq ft, Balcony about 32 sq ft, Passage about 18 sq ft.
2 BHK 142 flats · 80 available
573 sq ft carpet as drawn, from 365–628 sq ft filed in this configuration
- Carpet, filed
- 573 sq ft
- Built-up
- about 688 sq ft
- Super built-up
- about 802 sq ft
Every room in this flat
Living and dining about 167 sq ft, Master bedroom about 111 sq ft, Second bedroom about 89 sq ft, Kitchen about 67 sq ft, Bath about 39 sq ft, Balcony about 39 sq ft, Second bath about 33 sq ft, Passage about 28 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹5,395 to ₹10,869 per sq ft |
|---|---|
| Sold and booked | 47 sold, 0 booked |
| Still available | 199 flats, 365–628 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Revised projection
The completion date has moved from December 2027 to April 2028, 4 months later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Dhayari (Part) · shown on this site as Dhayari |
|---|---|
| Taluka | Haveli |
| Street, as filed | Dhayari |
| Bounded north by | By road and by Part of Survey No 128 5 2 |
| Bounded east by | By property of giving s no 128 H No 5 1 pt land |
| Bounded south by | By land of Bajirao pokale and Mr Gulab and Shivaji |
| Bounded west by | By land of Mr Pandurang Pokale |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Sai And Shantishobha Venture |
|---|---|
| Registered office | Office 201, Sainandan Group, Vishwa Arcade, Narhe, Opp. Narhe Fly Over, Pune 411041 |
| Registered agents | 1 licensed agent may sell this project |
Professionals named on the filing
| Architect | Ankur Assocaites |
|---|---|
| Architect | Ankur Associates CA/98/22909 |
| Engineer | G. A. Bhilare Consaltants Pvt. Ltd. NA |
| Engineer | Prashant Kadam REG/PMC/TEMP/1063/17 |
| Engineer | Pratik Rajendra Pathare REG/PMC/STE/2305/22 |
| Chartered Accountant | Phule Wagh & Associates LLP 180704 |
| Chartered Accountant | SPAK & Co 172292 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report Format A revised.pdf | 12 October 2023 1 older version on file |
|---|---|
| Promoter's declaration, Form B Form B Promoter.pdf | 12 October 2023 1 older version on file |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100053249 |
| Promoter | Sai And Shantishobha Venture |
| Project type | Residential / Group Housing · Building development |
| Locality | Dhayari — Haveli taluka, pincode 411041 |
| Applied on | 30 September 2023 |
| Registered on | 23 October 2023 |
| Completion, as first filed | 31 December 2027 |
| Due | 30 April 2028 4 months later |
| Units declared | 299 |
| Units sold | 47 of 299 sold (16%), 252 still unsold |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 23 October 2023 |
| Application reference | REA52100147289 |
| Current status | Active |
| Record last changed | 23 October 2023 · over 2 years ago 2 years untouched |
Where the sold count comes from, and whether it holds up. 47 of 299 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 299 flats and reaches the same answer — 47 sold, every one with money recorded as received against a named flat, and 199 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 23 October 2023.
MahaRERA has not recorded a change to this project's record in 2 years, while still listing it as under construction. That date moves on status changes and system updates as well as on anything the promoter files, so it is not proof the site is idle — but on a project still being sold, it is worth asking the promoter what has been filed since.
Common questions
- Is Ramana Myra registered with MahaRERA?
- Yes. It is registered as P52100053249, filed on 23 October 2023, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Ramana Myra due to be handed over?
- The promoter has told MahaRERA April 2028. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Ramana Myra been delayed?
- Yes. The first date filed was December 2027. It now stands at April 2028, 4 months later.
- What did buyers actually pay in Ramana Myra?
- A median of ₹7,836 per square foot of carpet, across 47 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many flats are left in Ramana Myra?
- 199 of 299 were still unsold at the promoter's last filing, in 1, 2 BHK, from 365–628 sq ft of carpet.
- Are there complaints against Ramana Myra?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Ramana Myra?
- Sai And Shantishobha Venture, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 21 September 2026. The authority's own page for P52100053249 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Dhayari
Stock image
- Nearby
- ₹7,233–7,512
- On offer
- 1, 2 BHK + shops
- Due
- Dec 2030
- Units
- 42
- Carpet
- 196–711
- Typical unit
- ~₹25.5 lakh
Stock image
- Nearby
- ₹7,233
- On offer
- 2 BHK
- Due
- Apr 2030
- Units
- 18
- Carpet
- 505–607
- Typical flat
- ~₹40.3 lakh
Stock image
- Nearby
- ₹7,233–7,512
- On offer
- 1, 2 BHK
- Due
- Apr 2029
- Units
- 18
- Carpet
- 481–766
- Typical flat
- ~₹47.9 lakh