Z Zomefy

RERA registered P52100055000 Active

Maitree Mega City

Dhayari, Pune · Mixed by Maitree Infra

Official record Updated from the register 21 September 2026. Anything filed since then is not here yet.

In short

Maitree Mega City in Dhayari is MahaRERA-registered (P52100055000) and still under construction, with possession filed for April 2028. Buyers have already registered 142 sales here at a median ₹6,547 per sq ft of carpet — not an asking price. Maitree Infra is the promoter.

Stock image, not a photograph of Maitree Mega City Stock image
Where
Dhayari
pincode 411041
Sold here at
₹6,547
per sq ft, 142 registered sales
Available
1 Room Kitchen, 1 BHK, 2 BHK, Shops
169 left · 95–538 sq ft
Now due
Apr 2028
4 months later than first promised
A stock photograph, not Maitree Mega City. We have no picture of this site yet.

Where this is

Dhayari, PMC, Pune, 411041

Village
Dhayari (Part)
Taluka
Haveli
Pincode
411041

No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.

Unit sizes on file

All 312 units are filed unit by unit with the authority, the highest on floor 12. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

1 Room Kitchen 1 unit · all available

1 unit 258 sq ft 24.0 sq m as filed

1 BHK 206 units · 82 available

1 unit 284 sq ft 26.4 sq m as filed
1 unit 313 sq ft 29.1 sq m as filed
42 units 316 sq ft 29.4 sq m as filed
1 unit 320 sq ft 29.7 sq m as filed
118 units 321 sq ft 29.8 sq m as filed
43 units 322 sq ft 29.89 sq m as filed

2 BHK 95 units · 76 available

48 units 525 sq ft 48.8 sq m as filed
47 units 538 sq ft 50.0 sq m as filed

Shops 10 units · all available

1 unit 95 sq ft 8.8 sq m as filed
1 unit 96 sq ft 8.94 sq m as filed
2 units 147 sq ft 13.65 sq m as filed
2 units 161 sq ft 14.98 sq m as filed

4 units have no usable carpet area on file, so they are counted above but not drawn.

Units sold

104 / 312

Early sales

33% absorption rate · the promoter's two filings disagree

Visual area guide See what the filed sizes feel like 3 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.

1 Room Kitchen 1 unit · 1 available

258 sq ft carpet as drawn

Carpet, filed
258 sq ft
Built-up
about 310 sq ft
Super built-up
about 361 sq ft
Every room in this unit

Living and sleeping about 155 sq ft, Kitchen about 52 sq ft, Bath about 28 sq ft, Balcony about 23 sq ft.

1 BHK 206 units · 82 available

321 sq ft carpet as drawn, from 284–322 sq ft filed in this configuration

Carpet, filed
321 sq ft
Built-up
about 385 sq ft
Super built-up
about 449 sq ft
Every room in this unit

Living and dining about 120 sq ft, Master bedroom about 80 sq ft, Kitchen about 48 sq ft, Bath about 28 sq ft, Balcony about 28 sq ft, Passage about 16 sq ft.

2 BHK 95 units · 76 available

525 sq ft carpet as drawn, from 525–538 sq ft filed in this configuration

Carpet, filed
525 sq ft
Built-up
about 630 sq ft
Super built-up
about 735 sq ft
Every room in this unit

Living and dining about 153 sq ft, Master bedroom about 102 sq ft, Second bedroom about 82 sq ft, Kitchen about 61 sq ft, Bath about 36 sq ft, Balcony about 36 sq ft, Second bath about 31 sq ft, Passage about 25 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹6,547 per sq ft of carpet, median of 142 registered sales
Range across those sales ₹5,144 to ₹9,638 per sq ft
Sold and booked 143 sold, 0 booked
Still available 169 units, 95–538 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Dec 2027
Current status Due Apr 2028

Revised projection

The completion date has moved from December 2027 to April 2028, 4 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

105/5/1 (P), 105/2A/3 (P), 105/4 (P) is the plot this project is built on, as filed
Revenue village Dhayari (Part) · shown on this site as Dhayari
TalukaHaveli
Street, as filed 105/5/1 AND 105/2A/3 RAYKAR MALA DHAYARI
Bounded north by 105-5-1 PART
Bounded east by 9 M Wide Road
Bounded south by 110 M WIDE RING ROAD
Bounded west by 105/2A/3 (P)

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerMaitree Infra
Registered officeFlat No 2, 2, Namo Complex, Dhayari Road, Dhayari, Pune 411041

Professionals named on the filing

Architect Arch View Associates STATE/R/2022/02837
Architect Dattatray Parshuram CA/2004/33379
Engineer Satish Bodare
Chartered Accountant Krishnakant Agrawal 197137
Chartered Accountant Shweta Agrawal 180701

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

3 June 2025 is when an advocate last certified the title to this land
Title report Legal Title Report.pdf 3 June 2025 1 older version on file
Conveyance deed New Sale Deed.pdf 3 June 2025
Promoter's declaration, Form B Promoter.pdf 28 December 2023

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100055000
Promoter Maitree Infra
Project typeMixed · Building development
LocalityDhayari — Haveli taluka, pincode 411041
Applied on28 December 2023
Registered on26 February 2024
Completion, as first filed31 December 2027
Due30 April 2028 4 months later
Units declared312
Units sold 104 of 312 sold (33%), 208 still unsoldfilings disagree
Complaints0 on record with MahaRERA
Certificate on file Corrected certificate, issued 12 August 2026
Application referenceREA52100151423
Current statusActive
Record last changed 09 June 2025 · 15 months ago

Where the sold count comes from, and whether it holds up. 104 of 312 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. And here the promoter's two filings do not agree. The quarterly report says 104 of 312 sold, leaving 208. The unit-by-unit list they file separately covers 312 units and marks 143 sold with 169 left. We show both rather than quietly pick one, and the number to distrust is what is still available — ask the promoter which filing is current before believing a unit is free. Either way, this is only as current as the last change to the record, 09 June 2025.

Common questions

Is Maitree Mega City registered with MahaRERA?
Yes. It is registered as P52100055000, filed on 26 February 2024, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Maitree Mega City due to be handed over?
The promoter has told MahaRERA April 2028. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Maitree Mega City been delayed?
Yes. The first date filed was December 2027. It now stands at April 2028, 4 months later.
What did buyers actually pay in Maitree Mega City?
A median of ₹6,547 per square foot of carpet, across 142 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many units are left in Maitree Mega City?
169 of 312 were still unsold at the promoter's last filing, in 1, 2 BHK +2 more, from 95–538 sq ft of carpet.
Are there complaints against Maitree Mega City?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Maitree Mega City?
Maitree Infra, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 21 September 2026. The authority's own page for P52100055000 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Dhayari

Stock image, not a photograph of Alliance Sarthak Stock image
Registered here
₹6,412
On offer
1, 2 BHK
Under construction

Alliance Sarthak

Alliance Buildcon · Dhayari

11 sold
Slipped 4 months
Due
Apr 2030
Units
45
Carpet
707–960
Sold at
₹50.6 lakh
P52100081025
Stock image, not a photograph of Amigos Residency Stock image
Locality median
₹7,472
Under construction

Amigos Residency

Kasturi Builders And Developers & Paigude Construction · Dhayari

0 sold
Slipped 4 months
Due
Oct 2027
Units
1
Carpet
428
Typical flat
~₹32 lakh
P52100077879
Stock image, not a photograph of Amruta Vihar Stock image
Registered here
₹6,553
On offer
1, 2, 4 BHK + shops
Under construction

Amruta Vihar

Amruta Developers · Dhayari

45 sold
Slipped 4 months
Due
Apr 2028
Units
150
Carpet
104–821
Sold at
₹41 lakh
P52100050831