RERA registered P52100035037 Completed
Nyati Era Ii
Dhanori, Pune · Others by Nyati Construction Private Limited
Official record Updated from the register 04 October 2026. Anything filed since then is not here yet.
In short
Nyati Era Ii in Dhanori is MahaRERA-registered (P52100035037) and was handed over in September 2025. No sales are registered in this project yet. Units the same size elsewhere in Dhanori have registered at ₹7,104 per sq ft of carpet — the neighbourhood, not this building. About 7% of the 177 units are sold. 1 complaint sits on the filing. Nyati Construction Private Limited is the promoter.
- Nearby at
- ₹7,104
- per sq ft, same sizes in Dhanori
- Available
- 1 BHK, Shops
- 164 left · 165–661 sq ft
- Now due
- Sep 2025
- 6 months later than first promised
Where this is
Dhanori, PMC, Pune, 411015
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Unit sizes on file
All 177 units are filed unit by unit with the authority, the highest on floor 11. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
1 BHK 120 units · all available
Shops 57 units · 44 available
6 further sizes, 6 units between them
13 / 177
7% absorption rate
Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.
1 BHK 120 units · 120 available
393 sq ft carpet as drawn
- Carpet, filed
- 393 sq ft
- Built-up
- about 472 sq ft
- Super built-up
- about 550 sq ft
Every room in this unit
Living and dining about 147 sq ft, Master bedroom about 98 sq ft, Kitchen about 59 sq ft, Bath about 34 sq ft, Balcony about 34 sq ft, Passage about 20 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What units like these cost nearby
No sale has been registered at Nyati Era Ii yet. The promoter has filed no agreement values, so nothing below is this project's own price.
| On sale here | Registered in Dhanori | Which for this size is |
|---|---|---|
| 1 BHK 393 sq ft | ₹7,104/sq ft 181 sales, 18 projects | ₹27.9 lakh middle half ₹4,934–7,978/sq ft |
Shops is also on sale here, and Dhanori has not registered enough sales of that to quote a rate for it.
Each rate is what buyers contracted to pay for the same configuration in Dhanori, over the carpet area on the same filing. Floor and facing move a rate, and a project new on the register can open above or below what its neighbours sold at two years ago, so the last column is arithmetic rather than a quote. See every rate registered in Dhanori.
The government's valuation of the unsold units
| On sale here | Carpet | Valued at no less than |
|---|---|---|
| 1 BHK 120 unsold | 393 sq ft | ₹13.2 lakh–₹24.8 lakh ₹3,350/sq ft |
| Shops 44 unsold | 165–661 sq ft | ₹12.1 lakh–₹48.2 lakh ₹7,299/sq ft |
This is the Annual Statement of Rates value the promoter filed against each unsold unit — the state's valuation, not an asking price and not a discount. Stamp duty is charged on whichever is higher, this or the agreement value, so nothing here can be registered below it. Read it as the floor under the price you will be quoted, which in most Pune localities sits well above it.
Timeline audit
Revised projection
The completion date has moved from March 2025 to September 2025, 6 months later, on the promoter's own revised filing.
Buyers who took possession late here may still have had a claim under section 18 of the Real Estate (Regulation and Development) Act, which entitles them to interest for every month of delay beyond the date in their agreement. More usefully for anyone buying today, this is a record of how this promoter performed against their own filed date.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Street, as filed | DHANORI LOHEGAON ROAD |
|---|---|
| Bounded north by | DRIVE WAY AND WING A |
| Bounded east by | INTERNAL ROAD |
| Bounded south by | 24 METER WIDE DP ROAD |
| Bounded west by | LAND OUT OF SURVEY NO 10-2 DHANORI |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Nyati Construction Private Limited |
|---|---|
| Registered office | 7th Floor East Wing, East Wing, Nyati Unitree, Pune Nagar Road, Yerwada, Nyati Tiara, Cts No 1995(P)+1996B, Pune 411006 |
| Registered agents | 37 licensed agents may sell this project |
Professionals named on the filing
| Architect | Ethique Archtects & Associates CA/94/17147 |
|---|---|
| Architect | Shirish Dasnurkar And Associates CA/10074 |
| Engineer | Amol Shitole |
| Engineer | JW Consultant LLP 18 |
| Engineer | Sandeep Hirolikar |
| Engineer | Vishwanath Dhande AM-1747965 |
| Chartered Accountant | Milani Gattani & Co. 142946 |
| Chartered Accountant | Vipin Gujarathi & Associates 160070 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Complaints filed with MahaRERA
1 case against this project, 0 with an order on record. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.
| Case number | Filed | Outcome |
|---|---|---|
| CC12604856 | Aug 2026 | No order on record |
A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.
Title and ownership papers
| Title report TITLE CERTIFICATE 03102024.pdf | 7 October 2024 1 older version on file |
|---|---|
| Promoter's declaration, Form B FORM B.pdf | 27 March 2025 1 older version on file |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100035037 |
| Promoter | Nyati Construction Private Limited |
| Project type | Others · Building development |
| Locality | Dhanori — Haveli taluka, pincode 411015 |
| Applied on | 28 April 2022 |
| Registered on | 29 April 2022 |
| Completion, as first filed | 31 March 2025 |
| Handed over | 30 September 2025 6 months later |
| Units declared | 177 |
| Units sold | 13 of 177 sold (7%), 164 still unsold |
| Complaints | 1 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 29 April 2022 |
| Application reference | REA52100107414 |
| Current status | Completed |
| Record last changed | 02 May 2025 · 17 months ago |
Where the sold count comes from, and whether it holds up. 13 of 177 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 177 units and reaches the same answer — 12 sold, every one with money recorded as received against a named unit, 1 booked with a price agreed but nothing received yet, and 164 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 02 May 2025.
Common questions
- Is Nyati Era Ii registered with MahaRERA?
- Yes. It is registered as P52100035037, filed on 29 April 2022, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- Has Nyati Era Ii been handed over?
- Yes. The completion date on the register is September 2025.
- Has Nyati Era Ii been delayed?
- Yes. The first date filed was March 2025. It now stands at September 2025, 6 months later.
- What does a unit in Nyati Era Ii cost?
- Nothing has been registered in this project yet, so it has no price of its own. Units the same size elsewhere in Dhanori have registered at ₹7,104 per square foot of carpet — the neighbourhood, not this building.
- How many units are left in Nyati Era Ii?
- 164 of 177 were still unsold at the promoter's last filing, in 1 BHK + shops, from 165–661 sq ft of carpet.
- Are there complaints against Nyati Era Ii?
- 1 case has been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
- Who is building Nyati Era Ii?
- Nyati Construction Private Limited, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 04 October 2026. The authority's own page for P52100035037 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Dhanori
Stock image
- Done
- Dec 2025
- Units
- —
- Carpet
- —
- Typical flat
- —
Stock image
- Registered here
- ₹7,876
- On offer
- 1 BHK
3 complaints
- Done
- Aug 2025
- Units
- 364
- Carpet
- 557
- Sold at
- ₹58.5 lakh
Stock image
- Registered here
- ₹7,288
- On offer
- 1 BHK
- Done
- Sep 2022
- Units
- 20
- Carpet
- 350
- Sold at
- ₹26.6 lakh