Z Zomefy

RERA registered P52100051518 Active

Kingdom

Dehu, Pune · Residential / Group Housing by M/S Kingdom Buildcon

Official record Updated from the register 16 September 2026. Anything filed since then is not here yet.

In short

Kingdom in Dehu is MahaRERA-registered (P52100051518) and still under construction, with possession filed for December 2027. Buyers have already registered 19 sales here at a median ₹4,982 per sq ft of carpet — not an asking price. About 37% of the 52 units are sold. M/S Kingdom Buildcon is the promoter.

Stock image, not a photograph of Kingdom Stock image
Where
Dehu
pincode 418109
Sold here at
₹4,982
per sq ft, 19 registered sales
Available
1 BHK, 2 BHK, Shops
33 left · 94–609 sq ft
Now due
Dec 2027
2 years later than first promised
A stock photograph, not Kingdom. We have no picture of this site yet.

Where this is

Dehu, PMRDA, Pune, 418109

Village
DEHU
Taluka
Haveli
Pincode
418109

No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.

Unit sizes on file

All 52 units are filed unit by unit with the authority, the highest on floor 10. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

1 BHK 39 units · 22 available

10 units 448 sq ft 41.61 sq m as filed
9 units 457 sq ft 42.49 sq m as filed
10 units 463 sq ft 43.05 sq m as filed
10 units 477 sq ft 44.31 sq m as filed

2 BHK 10 units · 8 available

10 units 609 sq ft 56.61 sq m as filed

Shops 3 units · all available

1 unit 94 sq ft 8.77 sq m as filed
1 unit 114 sq ft 10.57 sq m as filed
1 unit 132 sq ft 12.28 sq m as filed
Units sold

19 / 52

Early sales

37% absorption rate

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.

1 BHK 39 units · 22 available

448 sq ft carpet as drawn, from 448–477 sq ft filed in this configuration

Carpet, filed
448 sq ft
Built-up
about 538 sq ft
Super built-up
about 627 sq ft
Every room in this unit

Living and dining about 168 sq ft, Master bedroom about 112 sq ft, Kitchen about 67 sq ft, Bath about 39 sq ft, Balcony about 39 sq ft, Passage about 22 sq ft.

2 BHK 10 units · 8 available

609 sq ft carpet as drawn

Carpet, filed
609 sq ft
Built-up
about 731 sq ft
Super built-up
about 853 sq ft
Every room in this unit

Living and dining about 177 sq ft, Master bedroom about 118 sq ft, Second bedroom about 95 sq ft, Kitchen about 71 sq ft, Bath about 41 sq ft, Balcony about 41 sq ft, Second bath about 35 sq ft, Passage about 30 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹4,982 per sq ft of carpet, median of 19 registered sales
Range across those sales ₹4,613 to ₹6,709 per sq ft
Sold and booked 18 sold, 1 booked
Still available 33 units, 94–609 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Dec 2025
Current status Due Dec 2027

Revised projection

The completion date has moved from December 2025 to December 2027, 2 years later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

GAT. No. 59/8 is the plot this project is built on, as filed
Revenue village DEHU · shown on this site as Dehu
TalukaHaveli
Street, as filed Dehu
Bounded north by By Property of Mr Namdev Hagawane
Bounded east by By Property Wide Proposed Road
Bounded south by By Property Of Mr karjat Bhase
Bounded west by By Property of Subash More

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerM/S Kingdom Buildcon
Registered officeS No. 112/9/1, 401, Flat No.401,Shivsai Building C, Krantiveer Colony, Pimpri, Pune 411017

Professionals named on the filing

Architect Mr Kunal Bacchav CA/2015/69347
Engineer Atul B Suryawanshi
Engineer Bhavana Rohan Gavali
Engineer Mrs Neha Atul Suryawanshi
Engineer Rohinee Radgujar PCMC/LE/0651/2017
Chartered Accountant Pravin Pise & Associates 193912
Chartered Accountant Rama k Gupta and Co 448624
Chartered Accountant SUNSVG And Associated
Chartered Accountant Vaibhav S Bhise 608997

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

5 April 2023 is when an advocate last certified the title to this land
Title report Ligal Title report .pdf 5 April 2023
Promoter's declaration, Form B Declaration kingdom buildcon (2).pdf 23 February 2023

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100051518
Promoter M/S Kingdom Buildcon
Project typeResidential / Group Housing · Building development
LocalityDehu — Haveli taluka, pincode 418109
Applied on04 March 2023
Registered on23 June 2023
Completion, as first filed31 December 2025
Due31 December 2027 2 years later
Units declared52
Units sold 19 of 52 sold (37%), 33 still unsold
Complaints0 on record with MahaRERA
Certificate on file Extension certificate, issued 14 August 2026
Application referenceREA52100133343
Current statusActive
Record last changed 14 August 2026 · 33 days ago

Where the sold count comes from, and whether it holds up. 19 of 52 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 52 units and reaches the same answer — 18 sold, every one with money recorded as received against a named unit, 1 booked with a price agreed but nothing received yet, and 33 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 14 August 2026.

Common questions

Is Kingdom registered with MahaRERA?
Yes. It is registered as P52100051518, filed on 23 June 2023, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Kingdom due to be handed over?
The promoter has told MahaRERA December 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Kingdom been delayed?
Yes. The first date filed was December 2025. It now stands at December 2027, 2 years later.
What did buyers actually pay in Kingdom?
A median of ₹4,982 per square foot of carpet, across 19 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many units are left in Kingdom?
33 of 52 were still unsold at the promoter's last filing, in 1, 2 BHK + shops, from 94–609 sq ft of carpet.
Are there complaints against Kingdom?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Kingdom?
M/S Kingdom Buildcon, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 16 September 2026. The authority's own page for P52100051518 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Dehu

Stock image, not a photograph of Panorama Dreams Stock image
Registered here
₹5,793
On offer
1, 2 BHK + shops
Under construction

Panorama Dreams

Panorama Ventures · Dehu

36 sold
Due
Dec 2026
Units
76
Carpet
96–731
Sold at
₹27 lakh
P52100078578
Stock image, not a photograph of Rivereast Residency Stock image
Registered here
₹6,109
On offer
1 BHK +2 more
Under construction

Rivereast Residency

Krushna Paradise Developers · Dehu

3 sold
Due
Mar 2029
Units
177
Carpet
109–538
Sold at
₹19.7 lakh
P52100079905