RERA registered P52100048677 Active
Casa Millennium
Dapodi, Pune · Residential / Group Housing by G P Associates
Official record Updated from the register 04 October 2026. Anything filed since then is not here yet.
In short
Casa Millennium in Dapodi is MahaRERA-registered (P52100048677) and still under construction, with possession filed for April 2028. Buyers have already registered 7 sales here at a median ₹8,149 per sq ft of carpet — not an asking price. About 29% of the 28 units are sold. G P Associates is the promoter.
- Sold here at
- ₹8,149
- per sq ft, 7 registered sales
- Available
- 1 BHK, 2 BHK, Shops
- 20 left · 130–546 sq ft
- Now due
- Apr 2028
- 2.3 years later than first promised
Where this is
Dapodi, Pune, 411031
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Unit sizes on file
All 28 units are filed unit by unit with the authority, the highest on floor 4. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
1 BHK 7 units · 6 available
2 BHK 13 units · 7 available
Shops 8 units · 7 available
8 / 28
29% absorption rate
Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.
1 BHK 7 units · 6 available
380 sq ft carpet as drawn, from 380–382 sq ft filed in this configuration
- Carpet, filed
- 380 sq ft
- Built-up
- about 456 sq ft
- Super built-up
- about 532 sq ft
Every room in this unit
Living and dining about 142 sq ft, Master bedroom about 95 sq ft, Kitchen about 57 sq ft, Bath about 33 sq ft, Balcony about 33 sq ft, Passage about 19 sq ft.
2 BHK 13 units · 7 available
499 sq ft carpet as drawn, from 403–546 sq ft filed in this configuration
- Carpet, filed
- 499 sq ft
- Built-up
- about 599 sq ft
- Super built-up
- about 699 sq ft
Every room in this unit
Living and dining about 145 sq ft, Master bedroom about 97 sq ft, Second bedroom about 78 sq ft, Kitchen about 58 sq ft, Bath about 34 sq ft, Balcony about 34 sq ft, Second bath about 29 sq ft, Passage about 24 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹6,776 to ₹11,033 per sq ft |
|---|---|
| Sold and booked | 8 sold, 0 booked |
| Still available | 20 units, 130–546 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Revised projection
The completion date has moved from December 2025 to April 2028, 2.3 years later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Pimpri Chinchawad (M Corp.) · shown on this site as Dapodi |
|---|---|
| Taluka | Haveli |
| Street, as filed | Bopkhel |
| Bounded north by | 18 Meter wide DP road |
| Bounded east by | Remainig S No 156 |
| Bounded south by | Remaining S No 156 |
| Bounded west by | 18 Meter wide DP road |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | G P Associates |
|---|---|
| Registered office | Gat No 7, Zon No 9, Bapuji Buwa Mandir, Ganeshnagar, Bopkhel, Pune 411031 |
Professionals named on the filing
| Architect | Atul Bapurao Ranpise pcmc-/las/0549 |
|---|---|
| Engineer | Ashish Prakash Dhake PCMC/LE/1011/2022 |
| Chartered Accountant | Deepak Kshirsagar 196448 |
| Chartered Accountant | Deepak Kshirsagar & Co. 196448 |
| Chartered Accountant | Yogesh B Kabra 168410 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report Format A search report.pdf | 31 December 2022 1 older version on file |
|---|---|
| Promoter's declaration, Form B Form B Builder Mandar Ghulecompressed.pdf | 4 December 2022 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100048677 |
| Promoter | G P Associates |
| Project type | Residential / Group Housing · Building development |
| Locality | Dapodi — Haveli taluka, pincode 411031 |
| Applied on | 05 December 2022 |
| Registered on | 12 January 2023 |
| Completion, as first filed | 31 December 2025 |
| Due | 30 April 2028 2.3 years later |
| Units declared | 28 |
| Units sold | 8 of 28 sold (29%), 20 still unsold |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Extension certificate, issued 14 August 2026 |
| Application reference | REA52100125568 |
| Current status | Active |
| Record last changed | 14 August 2026 · 2 months ago |
Where the sold count comes from, and whether it holds up. 8 of 28 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 28 units and reaches the same answer — 8 sold, every one with money recorded as received against a named unit, and 20 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 14 August 2026.
Common questions
- Is Casa Millennium registered with MahaRERA?
- Yes. It is registered as P52100048677, filed on 12 January 2023, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Casa Millennium due to be handed over?
- The promoter has told MahaRERA April 2028. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Casa Millennium been delayed?
- Yes. The first date filed was December 2025. It now stands at April 2028, 2.3 years later.
- What did buyers actually pay in Casa Millennium?
- A median of ₹8,149 per square foot of carpet, across 7 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many units are left in Casa Millennium?
- 20 of 28 were still unsold at the promoter's last filing, in 1, 2 BHK + shops, from 130–546 sq ft of carpet.
- Are there complaints against Casa Millennium?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Casa Millennium?
- G P Associates, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 04 October 2026. The authority's own page for P52100048677 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Dapodi
Stock image
- Registered here
- ₹5,844
- On offer
- 1, 2 BHK
- Due
- Jan 2027
- Units
- 28
- Carpet
- 482–646
- Sold at
- ₹30 lakh
Stock image
- Registered here
- ₹6,840
- On offer
- 3 BHK + shops
- Due
- Mar 2027
- Units
- 287
- Carpet
- 258–972
- Sold at
- ₹44 lakh
Stock image
- Nearby
- ₹6,386–7,026
- On offer
- 1, 2, 3 BHK + shops
- Due
- Dec 2030
- Units
- 64
- Carpet
- 86–855
- Typical unit
- ~₹40.9 lakh