RERA registered P52100047842 Active
Shivviharphase2
Charholi Khurd, Pune · Residential / Group Housing by Royal Construction
Official record Updated from the register 04 October 2026. Anything filed since then is not here yet.
In short
Shivviharphase2 in Charholi Khurd is MahaRERA-registered (P52100047842) and still under construction, with possession filed for December 2026. Buyers have already registered 32 sales here at a median ₹4,407 per sq ft of carpet — not an asking price. About 58% of the 60 units are sold. Royal Construction is the promoter.
- Sold here at
- ₹4,407
- per sq ft, 32 registered sales
- Available
- 1 BHK, 2 BHK, Shops
- 25 left · 291–643 sq ft
- Now due
- Dec 2026
- a year later than first promised
Where this is
Charholi Khurd, PMRDA, Pune, 412105
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Unit sizes on file
All 60 units are filed unit by unit with the authority, the highest on floor 7. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
1 BHK 49 units · 19 available
2 BHK 7 units · 5 available
Shops 4 units · 1 available
35 / 60
58% absorption rate
Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.
1 BHK 49 units · 19 available
454 sq ft carpet as drawn, from 433–454 sq ft filed in this configuration
- Carpet, filed
- 454 sq ft
- Built-up
- about 545 sq ft
- Super built-up
- about 636 sq ft
Every room in this unit
Living and dining about 170 sq ft, Master bedroom about 114 sq ft, Kitchen about 68 sq ft, Bath about 40 sq ft, Balcony about 40 sq ft, Passage about 23 sq ft.
2 BHK 7 units · 5 available
643 sq ft carpet as drawn
- Carpet, filed
- 643 sq ft
- Built-up
- about 772 sq ft
- Super built-up
- about 900 sq ft
Every room in this unit
Living and dining about 187 sq ft, Master bedroom about 125 sq ft, Second bedroom about 100 sq ft, Kitchen about 75 sq ft, Bath about 44 sq ft, Balcony about 44 sq ft, Second bath about 37 sq ft, Passage about 31 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹3,159 to ₹5,193 per sq ft |
|---|---|
| Sold and booked | 35 sold, 0 booked |
| Still available | 25 units, 205–643 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Revised projection
The completion date has moved from December 2025 to December 2026, a year later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | charholi kh · shown on this site as Charholi Khurd |
|---|---|
| Taluka | Khed |
| Street, as filed | CHARHOLI BK |
| Bounded north by | ADJOINING PROPERTY PARSHURAM GOPALA THORAVE |
| Bounded east by | ADJOINING GAONKOS |
| Bounded south by | ADJOINING BUILDING SHIVVIHAR PHASE I |
| Bounded west by | ADJOINING 9 METER DP ROAD |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Royal Construction |
|---|---|
| Registered office | 5916, 15, Charholi, Charholi Khurd, Khurd, Pune 412105 |
Professionals named on the filing
| Architect | Pravin Patil CA/2007/40376 |
|---|---|
| Engineer | Bhushan M Rathod |
| Chartered Accountant | D A Pawar & Company 601532 |
| Chartered Accountant | Prakash Suneja |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report FLOW CHART.pdf | 23 August 2022 1 older version on file |
|---|---|
| Promoter's declaration, Form B ANNXB.pdf | 5 July 2022 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100047842 |
| Promoter | Royal Construction |
| Project type | Residential / Group Housing · Building development |
| Locality | Charholi Khurd — Khed taluka, pincode 412105 |
| Applied on | 25 July 2022 |
| Registered on | 28 November 2022 |
| Completion, as first filed | 31 December 2025 |
| Due | 31 December 2026 a year later |
| Units declared | 60 |
| Units sold | 35 of 60 sold (58%), 25 still unsold |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Extension certificate, issued 16 March 2026 |
| Application reference | REA52100116063 |
| Current status | Active |
| Record last changed | 20 March 2026 · 7 months ago |
Where the sold count comes from, and whether it holds up. 35 of 60 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 60 units and reaches the same answer — 35 sold, every one with money recorded as received against a named unit, and 25 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 20 March 2026.
Common questions
- Is Shivviharphase2 registered with MahaRERA?
- Yes. It is registered as P52100047842, filed on 28 November 2022, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Shivviharphase2 due to be handed over?
- The promoter has told MahaRERA December 2026. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Shivviharphase2 been delayed?
- Yes. The first date filed was December 2025. It now stands at December 2026, a year later.
- What did buyers actually pay in Shivviharphase2?
- A median of ₹4,407 per square foot of carpet, across 32 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many units are left in Shivviharphase2?
- 25 of 60 were still unsold at the promoter's last filing, in 1, 2 BHK + shops, from 291–643 sq ft of carpet.
- Are there complaints against Shivviharphase2?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Shivviharphase2?
- Royal Construction, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 04 October 2026. The authority's own page for P52100047842 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Charholi Khurd
Stock image
- Nearby
- ₹4,651–4,916
- On offer
- 1, 2 BHK
- Due
- Oct 2030
- Units
- 16
- Carpet
- 381–565
- Typical flat
- ~₹26.6 lakh
Stock image
- Nearby
- ₹4,916
- On offer
- 2 BHK
- Due
- Oct 2030
- Units
- 42
- Carpet
- 546–575
- Typical flat
- ~₹27.3 lakh
Stock image
- Registered here
- ₹4,454
- On offer
- 1 BHK
2 complaints
- Due
- Dec 2026
- Units
- 118
- Carpet
- 382
- Sold at
- ₹17.3 lakh