RERA registered P52100056164 Active
Kumar Parv A, B, C, D AND E
Borhadewadi, Pune · Others by Kumar Properties Lifespaces Private Limited
Official record Updated from the register 24 September 2026. Anything filed since then is not here yet.
In short
Kumar Parv A, B, C, D AND E in Borhadewadi is MahaRERA-registered (P52100056164) and still under construction, with possession filed for April 2032. Buyers have already registered 66 sales here at a median ₹9,217 per sq ft of carpet — not an asking price. 1 complaint sits on the filing. Kumar Properties Lifespaces Private Limited is the promoter.
- Sold here at
- ₹9,217
- per sq ft, 66 registered sales
- Available
- 2 BHK, 3 BHK, Office Space, Shops
- 174 left · 238–1,718 sq ft
- Now due
- Apr 2032
- 4 months later than first promised
Where this is
Borhadewadi, PCMC, Pune, 412105
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Unit sizes on file
All 240 units are filed unit by unit with the authority, the highest on floor 15. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
2 BHK 104 units · 59 available
3 BHK 108 units · 87 available
Office Space 1 unit · all available
Shops 27 units · all available
55 / 240
23% absorption rate · the promoter's two filings disagree
Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.
2 BHK 104 units · 59 available
899 sq ft carpet as drawn
- Carpet, filed
- 899 sq ft
- Built-up
- about 1,079 sq ft
- Super built-up
- about 1,259 sq ft
Every room in this unit
Living and dining about 262 sq ft, Master bedroom about 175 sq ft, Second bedroom about 140 sq ft, Kitchen about 105 sq ft, Bath about 61 sq ft, Balcony about 61 sq ft, Second bath about 52 sq ft, Passage about 44 sq ft.
3 BHK 108 units · 87 available
1,136 sq ft carpet as drawn, from 966–1,136 sq ft filed in this configuration
- Carpet, filed
- 1,136 sq ft
- Built-up
- about 1,363 sq ft
- Super built-up
- about 1,590 sq ft
Every room in this unit
Living and dining about 279 sq ft, Master bedroom about 186 sq ft, Second bedroom about 149 sq ft, Third bedroom about 121 sq ft, Kitchen about 112 sq ft, Bath about 65 sq ft, Balcony about 65 sq ft, Second bath about 56 sq ft, Passage about 56 sq ft, Third bath about 47 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹7,790 to ₹12,150 per sq ft |
|---|---|
| Sold and booked | 62 sold, 4 booked |
| Still available | 174 units, 238–1718 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Revised projection
The completion date has moved from December 2031 to April 2032, 4 months later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Borhadewadi |
|---|---|
| Taluka | Haveli |
| Street, as filed | Moshi Road |
| Bounded north by | Adjoining Gat No - 112 |
| Bounded east by | 18m Wide road And Adjoining Gat No - 107 |
| Bounded south by | 18m Wide road |
| Bounded west by | Adjoining Gat No - 111 |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Kumar Properties Lifespaces Private Limited |
|---|---|
| Registered office | 2413, Kumar Capital, East Street, Near Axis Bank, Camp, Pune 411001 |
| Registered agents | 34 licensed agents may sell this project |
Professionals named on the filing
| Architect | Ar Vikas Achalkar CA/94/17606 |
|---|---|
| Engineer | Ayub Banadar |
| Engineer | Dharitri Roy |
| Chartered Accountant | GMKS & Co. 134685 |
| Chartered Accountant | Supriya Abhijit Mundada |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Complaints filed with MahaRERA
1 case against this project, 1 with an order on record. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.
| Case number | Filed | Outcome |
|---|---|---|
| SM12600507 | Jul 2026 | Order passed Jul 2026 |
A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.
Title and ownership papers
| Title report 250401_Legal Title Report.pdf | 3 April 2025 3 older versions on file |
|---|---|
| Conveyance deed Sale Deed - Kumar Parv.pdf | 17 June 2026 1 older version on file |
| Promoter's declaration, Form B 6_Form B.pdf | 29 April 2024 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100056164 |
| Promoter | Kumar Properties Lifespaces Private Limited |
| Project type | Others · Building development |
| Locality | Borhadewadi — Haveli taluka, pincode 412105 |
| Applied on | 02 May 2024 |
| Registered on | 16 May 2024 |
| Completion, as first filed | 28 December 2031 |
| Due | 28 April 2032 4 months later |
| Units declared | 240 |
| Units sold | 55 of 240 sold (23%), 185 still unsoldfilings disagree |
| Complaints | 1 on record with MahaRERA |
| Certificate on file | Corrected certificate, issued 20 August 2026 |
| Application reference | REA52100157810 |
| Current status | Active |
| Record last changed | 17 June 2026 · 3 months ago |
Where the sold count comes from, and whether it holds up. 55 of 240 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. And here the promoter's two filings do not agree. The quarterly report says 55 of 240 sold, leaving 185. The unit-by-unit list they file separately covers 240 units and marks 62 sold with 174 left. We show both rather than quietly pick one, and the number to distrust is what is still available — ask the promoter which filing is current before believing a unit is free. Either way, this is only as current as the last change to the record, 17 June 2026.
Common questions
- Is Kumar Parv A, B, C, D AND E registered with MahaRERA?
- Yes. It is registered as P52100056164, filed on 16 May 2024, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Kumar Parv A, B, C, D AND E due to be handed over?
- The promoter has told MahaRERA April 2032. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Kumar Parv A, B, C, D AND E been delayed?
- Yes. The first date filed was December 2031. It now stands at April 2032, 4 months later.
- What did buyers actually pay in Kumar Parv A, B, C, D AND E?
- A median of ₹9,217 per square foot of carpet, across 66 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many units are left in Kumar Parv A, B, C, D AND E?
- 174 of 240 were still unsold at the promoter's last filing, in 2, 3 BHK +2 more, from 238–1,718 sq ft of carpet.
- Are there complaints against Kumar Parv A, B, C, D AND E?
- 1 case has been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
- Who is building Kumar Parv A, B, C, D AND E?
- Kumar Properties Lifespaces Private Limited, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 24 September 2026. The authority's own page for P52100056164 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Borhadewadi
Stock image
- Registered here
- ₹7,080
- On offer
- 1, 2 BHK
- Due
- Jul 2028
- Units
- 192
- Carpet
- 419–598
- Sold at
- ₹31.3 lakh
Stock image
- Nearby
- ₹7,173
- On offer
- 1, 2 BHK
- Due
- Apr 2030
- Units
- 24
- Carpet
- 472–733
- Typical flat
- ~₹49.4 lakh
Stock image
- Registered here
- ₹7,402
- On offer
- 2, 3 BHK
- Done
- Dec 2026
- Units
- 112
- Carpet
- 445–722
- Sold at
- ₹41.1 lakh