Z Zomefy

RERA registered P52100056437 Completed

Tanai Heights

Baramati, Pune · Others by Surekha Vishnu Kumbhar

Official record Updated from the register 21 September 2026. Anything filed since then is not here yet.

In short

Tanai Heights in Baramati is MahaRERA-registered (P52100056437) and was handed over in November 2026. Buyers have already registered 4 sales here at a median ₹3,218 per sq ft of carpet — not an asking price. About 22% of the 18 units are sold. Surekha Vishnu Kumbhar is the promoter.

Stock image, not a photograph of Tanai Heights Stock image
Where
Baramati
pincode 413102
Sold here at
₹3,218
per sq ft, 4 registered sales
Available
2 BHK, Shops
8 left · 157–838 sq ft
Possession
Nov 2026
as filed with MahaRERA
A stock photograph, not Tanai Heights. We have no picture of this site yet.

Where this is

Baramati, Pune, 413102

Village
Baramati (M Cl)
Taluka
Baramati
Pincode
413102

No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.

Unit sizes on file

All 18 units are filed unit by unit with the authority, the highest on floor 5. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

2 BHK 10 units · 4 available

10 units 838 sq ft 77.82 sq m as filed

Configuration not filed 4 units · 2 available

3 units 157 sq ft 14.6 sq m as filed
1 unit 158 sq ft 14.64 sq m as filed

Shops 4 units · 2 available

3 units 157 sq ft 14.6 sq m as filed
1 unit 158 sq ft 14.64 sq m as filed
Units sold

4 / 18

Early sales

22% absorption rate

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.

2 BHK 10 units · 4 available

838 sq ft carpet as drawn

Carpet, filed
838 sq ft
Built-up
about 1,006 sq ft
Super built-up
about 1,173 sq ft
Every room in this unit

Living and dining about 244 sq ft, Master bedroom about 163 sq ft, Second bedroom about 130 sq ft, Kitchen about 98 sq ft, Bath about 57 sq ft, Balcony about 57 sq ft, Second bath about 49 sq ft, Passage about 41 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹3,218 per sq ft of carpet, median of 4 registered sales
Range across those sales ₹3,044 to ₹3,283 per sq ft
Sold and booked 2 sold, 2 booked
Still available 8 units, 157–838 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Nov 2026
Current status Handed over Nov 2026

Stable projection

No delay reported in the latest RERA filings. Construction is recorded against the original baseline date the promoter registered.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

Plot No 11, Gat No 156 is the plot this project is built on, as filed
Revenue village Baramati (M Cl) · shown on this site as Baramati
TalukaBaramati
Street, as filed Jalochi Baramati
Bounded north by 9 Mtr Wide Internal Road
Bounded east by Plot No 12
Bounded south by Bunglow of Bhori
Bounded west by Plot No 10

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerSurekha Vishnu Kumbhar
Registered officePlot No 2, Matoshree Complex, Near Svpm College, Malegaon Bk, Opp. Nageshwar Temple, Pune 413115

Professionals named on the filing

Architect Gaikwad Consultant STATEIRI2024/APLI10017
Architect Somnath Pondkule And Associates STATE/R/2024/APL/10033
Engineer Gaikwad Consultant STATE/R/2024/APL/10017
Engineer Mayur Rajendra Jagtap CAPBC/R/2024/APL/00963
Engineer Somnath Pondkule And Associates STATE/R/2024/APL/10033
Chartered Accountant Ajit Bhoite & Associates 604045
Chartered Accountant CPH & Associates 616106
Chartered Accountant S B Chavan & Associates 131773
Chartered Accountant Sanjeev Kothadiya Pratik Doshi & Co

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

6 April 2024 is when an advocate last certified the title to this land
Title report RERA SEARCH REPORT.pdf 6 April 2024
Promoter's declaration, Form B Final Form B Promoter.pdf 6 April 2024

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100056437
Promoter Surekha Vishnu Kumbhar
Project typeOthers · Building development
LocalityBaramati — Baramati taluka, pincode 413102
Applied on12 April 2024
Registered on31 May 2024
Completion, as first filed25 November 2026
Handed over25 November 2026
Units declared18
Units sold 4 of 18 sold (22%), 14 still unsold
Complaints0 on record with MahaRERA
Certificate on file Original registration certificate, issued 31 May 2024
Application referenceREA52100157198
Current statusCompleted
Record last changed 31 May 2024 · over 2 years ago

Where the sold count comes from, and whether it holds up. 4 of 18 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 18 units and reaches the same answer — 2 sold, every one with money recorded as received against a named unit, 2 booked with a price agreed but nothing received yet, and 8 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 31 May 2024.

Common questions

Is Tanai Heights registered with MahaRERA?
Yes. It is registered as P52100056437, filed on 31 May 2024, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
Has Tanai Heights been handed over?
Yes. The completion date on the register is November 2026.
Has Tanai Heights been delayed?
No. November 2026 is the date first filed with the authority and it has not moved since.
What did buyers actually pay in Tanai Heights?
A median of ₹3,218 per square foot of carpet, across 4 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many units are left in Tanai Heights?
8 of 18 were still unsold at the promoter's last filing, in 2 BHK + shops, from 157–838 sq ft of carpet.
Are there complaints against Tanai Heights?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Tanai Heights?
Surekha Vishnu Kumbhar, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 21 September 2026. The authority's own page for P52100056437 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Baramati