Z Zomefy

RERA registered P52100048954 Completed

Silver Oak Villas

Baramati, Pune · Others by Deepak Bhausaheb Kate

Official record Updated from the register 16 September 2026. Anything filed since then is not here yet.

In short

Silver Oak Villas in Baramati is MahaRERA-registered (P52100048954) and was handed over in December 2027. No sales are registered in this project yet. Units the same size elsewhere in Baramati have registered at ₹4,667 per sq ft of carpet — the neighbourhood, not this building. About 25% of the 4 units are sold. Deepak Bhausaheb Kate is the promoter.

Stock image, not a photograph of Silver Oak Villas Stock image
Where
Baramati
pincode 413102
Nearby at
₹4,667
per sq ft, same sizes in Baramati
Available
3 BHK
2 left · 870 sq ft
Possession
Dec 2027
as filed with MahaRERA
A stock photograph, not Silver Oak Villas. We have no picture of this site yet.

Where this is

Baramati, Pune, 413102

Village
Baramati (M Cl)
Taluka
Baramati
Pincode
413102
Coordinates
18.141159, 74.560751

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 4 flats are filed unit by unit with the authority, the highest on floor 3. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

3 BHK 2 units · all available

2 units 870 sq ft 80.86 sq m as filed

4 BHK 1 unit · not for sale

1 unit 1358 sq ft 126.16 sq m as filed

Row Houses 1 unit · all sold

1 unit 817 sq ft 75.9 sq m as filed
Units sold

1 / 4

Early sales

25% absorption rate

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

3 BHK 2 flats · 2 available

870 sq ft carpet as drawn

Carpet, filed
870 sq ft
Built-up
about 1,044 sq ft
Super built-up
about 1,218 sq ft
Every room in this flat

Living and dining about 214 sq ft, Master bedroom about 143 sq ft, Second bedroom about 114 sq ft, Third bedroom about 93 sq ft, Kitchen about 86 sq ft, Bath about 50 sq ft, Balcony about 50 sq ft, Second bath about 43 sq ft, Passage about 43 sq ft, Third bath about 36 sq ft.

4 BHK 1 flat · none available

1,358 sq ft carpet as drawn

Carpet, filed
1,358 sq ft
Built-up
about 1,630 sq ft
Super built-up
about 1,901 sq ft
Every room in this flat

Living and dining about 302 sq ft, Master bedroom about 201 sq ft, Second bedroom about 161 sq ft, Third bedroom about 131 sq ft, Kitchen about 121 sq ft, Fourth bedroom about 121 sq ft, Bath about 70 sq ft, Balcony about 70 sq ft, Passage about 70 sq ft, Second bath about 60 sq ft, Third bath about 50 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What flats like these cost nearby

No sale has been registered at Silver Oak Villas yet. 1 agreement has been filed, which is too few to divide into a rate anyone should act on.

₹4,667 per sq ft of carpet, median of 66 registered sales of the same configuration in Baramati
On sale here Registered in Baramati Which for this size is
3 BHK 870 sq ft ₹4,667/sq ft 66 sales, 12 projects ₹40.6 lakh middle half ₹3,499–5,037/sq ft

Each rate is what buyers contracted to pay for the same configuration in Baramati, over the carpet area on the same filing. Floor and facing move a rate, and a project new on the register can open above or below what its neighbours sold at two years ago, so the last column is arithmetic rather than a quote. See every rate registered in Baramati.

Timeline audit

Original proposed Dec 2027
Current status Handed over Dec 2027

Stable projection

No delay reported in the latest RERA filings. Construction is recorded against the original baseline date the promoter registered.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

SURVEY NUMBER 43/2/B(PART) is the plot this project is built on, as filed
Revenue village Baramati (M Cl) · shown on this site as Baramati
TalukaBaramati
Street, as filed MALEGAON ROAD
Bounded north by SURVEY NUMBER 43A-44
Bounded east by SURVEY NUMBER 43-3-B
Bounded south by SURVEY NUMBER 44
Bounded west by SURVEY NUMBER 43-2-B

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerDeepak Bhausaheb Kate
Registered officeFlat No 201, Gulmohor Residency, Ring Road, Near Swimming Tank, Sheth Ramchand Mulukchand Nagar, Pune 413102

Professionals named on the filing

Engineer deepak kate
Chartered Accountant Pritam Suryakant Pahade 121160

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

12 January 2023 is when an advocate last certified the title to this land
Title report Search Silver Oak.pdf 12 January 2023
Promoter's declaration, Form B Form B Kate Promoter.pdf 12 January 2023

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100048954
Promoter Deepak Bhausaheb Kate
Project typeOthers · Building development
LocalityBaramati — Baramati taluka, pincode 413102
Applied on13 January 2023
Registered on24 January 2023
Completion, as first filed16 December 2027
Handed over16 December 2027
Units declared4
Units sold 1 of 4 sold (25%), 3 still unsold
Complaints0 on record with MahaRERA
Certificate on file Original registration certificate, issued 24 January 2023
Application referenceREA52100128855
Current statusCompleted
Record last changed 27 February 2025 · 19 months ago

Where the sold count comes from, and whether it holds up. 1 of 4 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 4 flats and reaches the same answer — 1 sold, every one with money recorded as received against a named flat, and 2 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 27 February 2025.

Common questions

Is Silver Oak Villas registered with MahaRERA?
Yes. It is registered as P52100048954, filed on 24 January 2023, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
Has Silver Oak Villas been handed over?
Yes. The completion date on the register is December 2027.
Has Silver Oak Villas been delayed?
No. December 2027 is the date first filed with the authority and it has not moved since.
What does a flat in Silver Oak Villas cost?
Nothing has been registered in this project yet, so it has no price of its own. Units the same size elsewhere in Baramati have registered at ₹4,667 per square foot of carpet — the neighbourhood, not this building.
How many flats are left in Silver Oak Villas?
2 of 4 were still unsold at the promoter's last filing, in 3 BHK, from 870 sq ft of carpet.
Are there complaints against Silver Oak Villas?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Silver Oak Villas?
Deepak Bhausaheb Kate, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 16 September 2026. The authority's own page for P52100048954 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Baramati

Stock image, not a photograph of Rajmalhar Stock image
Nearby
₹4,667
On offer
3 BHK
Ready to move

Rajmalhar

Sudit Enterprises · Baramati

0 sold
Done
Dec 2026
Units
10
Carpet
1,371–1,484
Typical flat
~₹66.6 lakh
P52100055469