RERA registered P52100054663 Active
Shriya Avenue
Baramati, Pune · Others by Kanhopatra Hanumant Kate
Official record Updated from the register 21 September 2026. Anything filed since then is not here yet.
In short
Shriya Avenue in Baramati is MahaRERA-registered (P52100054663) and still under construction, with possession filed for April 2027. Buyers have already registered 15 sales here at a median ₹4,015 per sq ft of carpet — not an asking price. Kanhopatra Hanumant Kate is the promoter.
- Sold here at
- ₹4,015
- per sq ft, 15 registered sales
- Available
- 2 BHK, 3 BHK, Shops
- 25 left · 147–1,105 sq ft
- Now due
- Apr 2027
- 4 months later than first promised
Where this is
Baramati, Pune, 413102
The promoter filed a coordinate that falls outside Pune district, so it is not used here. The link above searches Maps by name and locality instead.
Unit sizes on file
All 40 units are filed unit by unit with the authority, the highest on floor 6. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
2 BHK 18 units · 8 available
3 BHK 6 units · 1 available
Configuration not filed 8 units · all available
Shops 8 units · all available
12 / 40
30% absorption rate · the promoter's two filings disagree
Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.
2 BHK 18 units · 8 available
792 sq ft carpet as drawn, from 792–804 sq ft filed in this configuration
- Carpet, filed
- 792 sq ft
- Built-up
- about 950 sq ft
- Super built-up
- about 1,109 sq ft
Every room in this unit
Living and dining about 231 sq ft, Master bedroom about 154 sq ft, Second bedroom about 123 sq ft, Kitchen about 92 sq ft, Bath about 54 sq ft, Balcony about 54 sq ft, Second bath about 46 sq ft, Passage about 38 sq ft.
3 BHK 6 units · 1 available
1,105 sq ft carpet as drawn, from 1,104–1,253 sq ft filed in this configuration
- Carpet, filed
- 1,105 sq ft
- Built-up
- about 1,326 sq ft
- Super built-up
- about 1,547 sq ft
Every room in this unit
Living and dining about 272 sq ft, Master bedroom about 181 sq ft, Second bedroom about 145 sq ft, Third bedroom about 118 sq ft, Kitchen about 109 sq ft, Bath about 63 sq ft, Balcony about 63 sq ft, Second bath about 54 sq ft, Passage about 54 sq ft, Third bath about 45 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹2,633 to ₹5,049 per sq ft |
|---|---|
| Sold and booked | 15 sold, 0 booked |
| Still available | 25 units, 147–1253 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Revised projection
The completion date has moved from December 2026 to April 2027, 4 months later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Baramati (M Cl) · shown on this site as Baramati |
|---|---|
| Taluka | Baramati |
| Street, as filed | Jalochi |
| Bounded north by | 9 Mtr Wide Road and Gat No 193 2 1 |
| Bounded east by | 12 Mtr Wide Road |
| Bounded south by | Gat No 191 |
| Bounded west by | Gat No 193 2 1 |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Kanhopatra Hanumant Kate |
|---|---|
| Registered office | Gat No 193/2/2 Plot O 1, Shriya Avenue, Jalochi, Baramati, Pune 413102 |
Professionals named on the filing
| Architect | AaiDaa s And Associates CA/2018/98673 |
|---|---|
| Architect | Shriya Construction Suraj Ramdas Kirve |
| Engineer | AaiDaa s And Associates CA/2018/98673 |
| Engineer | Shriya Constrcution CA/2018/98673 |
| Chartered Accountant | Paresh Mokashi and Company 144118 |
| Chartered Accountant | Pratik Doshi & Associates 144101 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report Legal Title Report Final .pdf | 5 January 2026 1 older version on file |
|---|---|
| Promoter's declaration, Form B Form B Promoter.pdf | 26 December 2023 |
| Annexure A declaration Annexure -A Final.pdf | 5 January 2026 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100054663 |
| Promoter | Kanhopatra Hanumant Kate |
| Project type | Others · Building development |
| Locality | Baramati — Baramati taluka, pincode 413102 |
| Applied on | 06 January 2024 |
| Registered on | 02 February 2024 |
| Completion, as first filed | 31 December 2026 |
| Due | 30 April 2027 4 months later |
| Units declared | 40 |
| Units sold | 12 of 40 sold (30%), 28 still unsoldfilings disagree |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Corrected certificate, issued 14 August 2026 |
| Application reference | REA52100151877 |
| Current status | Active |
| Record last changed | 06 January 2026 · 8 months ago |
Where the sold count comes from, and whether it holds up. 12 of 40 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. And here the promoter's two filings do not agree. The quarterly report says 12 of 40 sold, leaving 28. The unit-by-unit list they file separately covers 40 units and marks 15 sold with 25 left. We show both rather than quietly pick one, and the number to distrust is what is still available — ask the promoter which filing is current before believing a unit is free. Either way, this is only as current as the last change to the record, 06 January 2026.
Common questions
- Is Shriya Avenue registered with MahaRERA?
- Yes. It is registered as P52100054663, filed on 02 February 2024, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Shriya Avenue due to be handed over?
- The promoter has told MahaRERA April 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Shriya Avenue been delayed?
- Yes. The first date filed was December 2026. It now stands at April 2027, 4 months later.
- What did buyers actually pay in Shriya Avenue?
- A median of ₹4,015 per square foot of carpet, across 15 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many units are left in Shriya Avenue?
- 25 of 40 were still unsold at the promoter's last filing, in 2, 3 BHK + shops, from 147–1,105 sq ft of carpet.
- Are there complaints against Shriya Avenue?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Shriya Avenue?
- Kanhopatra Hanumant Kate, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 21 September 2026. The authority's own page for P52100054663 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Baramati
Stock image
- Due
- Oct 2029
- Units
- —
- Carpet
- —
- Typical unit
- —
Stock image
- Due
- Jan 2028
- Units
- —
- Carpet
- —
- Typical unit
- —
Stock image
- Due
- Apr 2035
- Units
- —
- Carpet
- —
- Typical flat
- —