RERA registered P52100050936 Active
Ankur Infra
Baramati, Pune · Residential / Group Housing by Ankur Infra
Official record Updated from the register 12 September 2026. Anything filed since then is not here yet.
In short
Ankur Infra in Baramati is MahaRERA-registered (P52100050936) and still under construction, with possession filed for March 2028. No sales are registered in this project yet. Units the same size elsewhere in Baramati have registered at ₹3,501–3,598 per sq ft of carpet — the neighbourhood, not this building. None of the units are filed as sold yet. Ankur Infra is the promoter.
- Nearby at
- ₹3,501–3,598
- per sq ft, same sizes in Baramati
- Available
- 1, 2 BHK
- 30 left · 432–567 sq ft
- Now due
- Mar 2028
- 2 years later than first promised
Where this is
Baramati, Pune, 413133
No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.
Flat sizes on file
All 30 flats are filed unit by unit with the authority, the highest on floor 6. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
1 BHK 24 units · all available
2 BHK 6 units · all available
0 / 30
0% absorption rate
Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
1 BHK 24 flats · 24 available
432 sq ft carpet as drawn
- Carpet, filed
- 432 sq ft
- Built-up
- about 518 sq ft
- Super built-up
- about 605 sq ft
Every room in this flat
Living and dining about 162 sq ft, Master bedroom about 108 sq ft, Kitchen about 65 sq ft, Bath about 38 sq ft, Balcony about 38 sq ft, Passage about 22 sq ft.
2 BHK 6 flats · 6 available
567 sq ft carpet as drawn
- Carpet, filed
- 567 sq ft
- Built-up
- about 680 sq ft
- Super built-up
- about 794 sq ft
Every room in this flat
Living and dining about 165 sq ft, Master bedroom about 110 sq ft, Second bedroom about 88 sq ft, Kitchen about 66 sq ft, Bath about 39 sq ft, Balcony about 39 sq ft, Second bath about 33 sq ft, Passage about 28 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What flats like these cost nearby
No sale has been registered at Ankur Infra yet. The promoter has filed no agreement values, so nothing below is this project's own price.
| On sale here | Registered in Baramati | Which for this size is |
|---|---|---|
| 1 BHK 432 sq ft | ₹3,598/sq ft 55 sales, 12 projects | ₹15.5 lakh middle half ₹2,964–4,229/sq ft |
| 2 BHK 567 sq ft | ₹3,501/sq ft 409 sales, 38 projects | ₹19.9 lakh middle half ₹3,101–4,162/sq ft |
Each rate is what buyers contracted to pay for the same configuration in Baramati, over the carpet area on the same filing. Floor and facing move a rate, and a project new on the register can open above or below what its neighbours sold at two years ago, so the last column is arithmetic rather than a quote. See every rate registered in Baramati.
The state values these at ₹2,305 per sq ft of carpet — one rate across all 30 still available, which puts the smallest at ₹10 lakh and the largest at ₹13.1 lakh. Stamp duty is charged on whichever is higher, this or the agreement value, so nothing here can be registered below it. Read it as the floor under the price you will be quoted, which in most Pune localities sits well above it.
Timeline audit
Revised projection
The completion date has moved from March 2026 to March 2028, 2 years later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Katphal · shown on this site as Baramati |
|---|---|
| Taluka | Baramati |
| Street, as filed | Katphal |
| Bounded north by | Plot No 7 |
| Bounded east by | 9 Mtr Wide Road |
| Bounded south by | Gat No 196 |
| Bounded west by | Gat No 170 A |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Ankur Infra |
|---|---|
| Registered office | Gat No 121, House No 741, Near Water Tank, Baramati, Katphal, Baramati, Pune 413102 |
Professionals named on the filing
| Architect | Ganesh Ramdas Bhosale STATE/R/2022/APL/04302 |
|---|---|
| Engineer | Ganesh Ramdas Bhosale STATE/R/2022/APL/04302 |
| Chartered Accountant | Indrajit Shah 122000 |
| Chartered Accountant | Paresh Mokashi 144118 |
| Chartered Accountant | Pratik Jivan Doshi 144101 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report Rera Search Report.pdf | 13 April 2023 |
|---|---|
| Promoter's declaration, Form B Form B.pdf | 12 April 2023 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100050936 |
| Promoter | Ankur Infra |
| Project type | Residential / Group Housing · Building development |
| Locality | Baramati — Baramati taluka, pincode 413133 |
| Applied on | 18 April 2023 |
| Registered on | 15 May 2023 |
| Completion, as first filed | 31 March 2026 |
| Due | 31 March 2028 2 years later |
| Units declared | 30 |
| Units sold | None sold yet, all 30 on the market |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Extension certificate, issued 20 August 2026 |
| Application reference | REA52100136376 |
| Current status | Active |
| Record last changed | 05 May 2026 · 4 months ago |
Nothing has sold yet. The promoter's quarterly progress report says none of the 30 flats are gone, and the unit-by-unit list they file separately says the same: all 30 still unsold. On a project this new that is normal rather than a warning, and it means every carpet area filed here is still available. Either way, this is only as current as the last change to the record, 05 May 2026.
Common questions
- Is Ankur Infra registered with MahaRERA?
- Yes. It is registered as P52100050936, filed on 15 May 2023, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Ankur Infra due to be handed over?
- The promoter has told MahaRERA March 2028. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Ankur Infra been delayed?
- Yes. The first date filed was March 2026. It now stands at March 2028, 2 years later.
- What does a flat in Ankur Infra cost?
- Nothing has been registered in this project yet, so it has no price of its own. Units the same size elsewhere in Baramati have registered at ₹3,501–3,598 per square foot of carpet — the neighbourhood, not this building.
- How many flats are left in Ankur Infra?
- 30 of 30 were still unsold at the promoter's last filing, in 1, 2 BHK, from 432–567 sq ft of carpet.
- Are there complaints against Ankur Infra?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Ankur Infra?
- Ankur Infra, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 12 September 2026. The authority's own page for P52100050936 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Baramati
Stock image
- Registered here
- ₹3,787
- On offer
- 1, 2 BHK + shops
- Due
- Dec 2027
- Units
- 19
- Carpet
- 230–834
- Sold at
- ₹21 lakh
Stock image
- Registered here
- ₹3,507
- On offer
- Row Houses
- Due
- Oct 2032
- Units
- 18
- Carpet
- 790–1,141
- Sold at
- ₹30 lakh
Stock image
- Valued from
- ₹3,019
- On offer
- Hall +2 more
- Due
- Mar 2028
- Units
- 57
- Carpet
- 175–1,620
- Typical unit
- ~₹6.9 lakh