Z Zomefy

RERA registered P52100018143 Active

Tejelevia Building - A,B

Baner, Pune · Residential / Group Housing by Tejraj Realtors LLP

Official record Updated from the register 23 October 2026. Anything filed since then is not here yet.

In short

Tejelevia Building - A,B in Baner is MahaRERA-registered (P52100018143) and still under construction, with possession filed for December 2028. Buyers have already registered 223 sales here at a median ₹13,292 per sq ft of carpet — not an asking price. About 96% of the 232 units are sold. Tejraj Realtors LLP is the promoter.

Stock image, not a photograph of Tejelevia Building - A,B Stock image
Where
Baner
pincode 411045
Sold here at
₹13,292
per sq ft, 223 registered sales
Available
2 BHK
1 left · 854 sq ft
Possession
Dec 2028
as filed with MahaRERA
A stock photograph, not Tejelevia Building - A,B. We have no picture of this site yet.
Plot Demarcation

Land & Survey Location

Official parcel address and geographic coordinates as declared to MahaRERA.

Jurisdiction Baner · Haveli

Baner, PMC, Pune, 411045

Village Baner
Taluka Haveli
Pincode 411045

No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.

Flat sizes on file

All 232 flats are filed unit by unit with the authority, the highest on floor 29. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

Configuration Mix & Volume Proportional share of project density
232 Total Licenced Units
Dominant Typology • 52.6% of tower

2 BHK Residences

1 Available 122 registered total
Estimated Market Window ₹73.2 lakh – ₹1.1 crore
Locality Benchmark ₹13,292 / sq ft
Carpet Variations as Filed Span: 551 to 854 sq ft
551 sq ft 51.22 sq m 6 units
637 sq ft 59.17 sq m 110 units
854 sq ft 79.34 sq m 6 units
Govt ASR Base: ₹80.8 lakh 1 of 122 available
Executive Typology • 47.4% of tower

3 BHK Residences

0 Available 110 registered total
Estimated Market Window ₹1.3 crore
Locality Benchmark ₹13,292 / sq ft
Carpet Variations as Filed Span: 971 to 1009 sq ft
971 sq ft 90.19 sq m 29 units
1005 sq ft 93.41 sq m 29 units
1009 sq ft 93.77 sq m 52 units
None available

Carpet Area vs. Loading Factor Arithmetic

How statutory carpet translates to standard Pune market quoted areas (+20% Built-up, +40% Super Built-up)

Unit Configuration Statutory RERA Carpet (Actual) Approx Built-up (+20%) Super Built-up (+40% Loading) Available Inventory
2 BHK 551 – 854 sq ft (51.22 – 79.34 sq m) ~661 – 1025 sq ft ~771 – 1196 sq ft 1 left of 122
3 BHK 971 – 1009 sq ft (90.19 – 93.77 sq m) ~1165 – 1211 sq ft ~1359 – 1413 sq ft 0 left of 110
Units sold

223 / 232

Nearly sold out

96% absorption rate

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

2 BHK 122 flats · 1 available

637 sq ft carpet as drawn, from 551–854 sq ft filed in this configuration

Carpet, filed
637 sq ft
Built-up
about 764 sq ft
Super built-up
about 892 sq ft
Every room in this flat

Living and dining about 186 sq ft, Master bedroom about 124 sq ft, Second bedroom about 99 sq ft, Kitchen about 74 sq ft, Bath about 43 sq ft, Balcony about 43 sq ft, Second bath about 37 sq ft, Passage about 31 sq ft.

3 BHK 110 flats · none available

1,009 sq ft carpet as drawn, from 971–1,009 sq ft filed in this configuration

Carpet, filed
1,009 sq ft
Built-up
about 1,211 sq ft
Super built-up
about 1,413 sq ft
Every room in this flat

Living and dining about 248 sq ft, Master bedroom about 165 sq ft, Second bedroom about 132 sq ft, Third bedroom about 108 sq ft, Kitchen about 99 sq ft, Bath about 58 sq ft, Balcony about 58 sq ft, Second bath about 50 sq ft, Passage about 50 sq ft, Third bath about 41 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹13,292 per sq ft of carpet, median of 223 registered sales
Range across those sales ₹9,946 to ₹18,781 per sq ft
Sold and booked 223 sold, 0 booked
Still available 1 flat, 551–1009 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Filing Compliance

Timeline audit & delivery schedule

Possession milestones tracked directly against original MahaRERA declarations.

Filing State On Scheduled Baseline
Original Baseline
Dec 2028
Declared at registration
Current Statutory Date
Due
Dec 2028
Identical to original baseline

Stable delivery projection

Stable project schedule. Zero slippage or revision requests reported since initial registration. Construction is recorded against the original baseline date.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

72 4, 73, 74 75 2 1, Plot No 31,32 is the plot this project is built on, as filed
Revenue village Baner
TalukaHaveli
Street, as filed Baner
Bounded north by S No 73 private plot no 1
Bounded east by S No 74 and 75 Part
Bounded south by 24 Mtr Road
Bounded west by S No 72 part 4

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerTejraj Realtors LLP
Registered office301, Bonita, V. Ddeshmukh Path, Off Ghole Road, Shivaji Nagar, Pune 411005

Professionals named on the filing

Architect Ar Deepali Agarwal 39491
Engineer Anil Veer
Engineer Ganesh Pillay
Engineer Jagannath Halnor
Engineer Rajendra Bhasme
Engineer Suresh Fulari NA
Engineer Yuvraj Kamble
Chartered Accountant CA Ritesh Gujar 153429
Chartered Accountant Drp & Co. LLP 133042
Chartered Accountant Manish Pokharna 116154
Chartered Accountant V S Potdar & Co 227050

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

7 October 2021 is when an advocate last certified the title to this land
Title report SARCH REPORT 7R_compressed (2).pdf 7 October 2021 2 older versions on file
Promoter's declaration, Form B FORM B-Declaration.pdf 28 September 2018

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100018143
Promoter Tejraj Realtors LLP
Project typeResidential / Group Housing · Building development
LocalityBaner — Haveli taluka, pincode 411045
Applied on29 September 2018
Registered on11 October 2018
Completion, as first filed24 December 2028
Due24 December 2028
Units declared232
Units sold 223 of 232 sold (96%), 9 still unsold
Complaints0 on record with MahaRERA
Certificate on file Original registration certificate, issued 31 October 2021
Application referenceREA52100044735
Current statusActive
Record last changed 23 December 2024 · 22 months ago

Where the sold count comes from, and whether it holds up. 223 of 232 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 232 flats and reaches the same answer — 223 sold, every one with money recorded as received against a named flat, and 1 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 23 December 2024.

Public Due Diligence

Common questions & statutory checks

Direct answers to questions buyers ask, verified strictly against the MahaRERA filing and registered deed records.

Verified Checks 7 Direct Answers
Is Tejelevia Building - A,B registered with MahaRERA?
Yes. It is registered as P52100018143, filed on 11 October 2018, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Tejelevia Building - A,B due to be handed over?
The promoter has told MahaRERA December 2028. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Tejelevia Building - A,B been delayed?
No. December 2028 is the date first filed with the authority and it has not moved since.
What did buyers actually pay in Tejelevia Building - A,B?
A median of ₹13,292 per square foot of carpet, across 223 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Tejelevia Building - A,B?
1 of 232 were still unsold at the promoter's last filing, in 2 BHK, from 854 sq ft of carpet.
Are there complaints against Tejelevia Building - A,B?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Tejelevia Building - A,B?
Tejraj Realtors LLP, as the promoter named on the registration.

Verify Government Filings Yourself

This dossier restates public records as filed on 23 October 2026. The authority's own registry page for P52100018143 carries sanctioned layout drawings, escrow accounts, quarterly progress filings, and title documents.

MahaRERA requires a CAPTCHA first. That is their verification gate, not a broken link.

Other projects in Baner

Stock image, not a photograph of Onyx Haus Stock image
Locality median
₹12,364
Under construction

Onyx Haus

Vinayaka Developers · Baner

0 sold
Slipped 4 months
Due
Apr 2029
Units
50
Carpet
216–221
Typical flat
~₹26.8 lakh
PR1260002502230
Stock image, not a photograph of Pinewood Phase II Stock image
Registered here
₹9,500
On offer
2, 3 BHK
Under construction

Pinewood Phase II

Sainath Buildcon · Baner

36 sold
Slipped 4 months
Due
Apr 2028
Units
98
Carpet
351–1,358
Sold at
₹1.2 crore
P52100055098