Z Zomefy

RERA registered P52100052295 Active

Majestique Signature Towers A2

Balewadi, Pune · Residential / Group Housing by M/s. Samarth Builders

Official record Updated from the register 04 October 2026. Anything filed since then is not here yet.

In short

Majestique Signature Towers A2 in Balewadi is MahaRERA-registered (P52100052295) and still under construction, with possession filed for October 2027. Buyers have already registered 52 sales here at a median ₹17,068 per sq ft of carpet — not an asking price. About 71% of the 73 units are sold. M/s. Samarth Builders is the promoter.

Stock image, not a photograph of Majestique Signature Towers A2 Stock image
Where
Balewadi
pincode 411045
Sold here at
₹17,068
per sq ft, 52 registered sales
Available
3 BHK
7 left · 1,023 sq ft
Now due
Oct 2027
4 months later than first promised
A stock photograph, not Majestique Signature Towers A2. We have no picture of this site yet.

Where this is

Balewadi, PMC, Pune, 411045

Village
Balewadi
Taluka
Haveli
Pincode
411045
Coordinates
18.572729, 73.775817

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 73 flats are filed unit by unit with the authority, the highest on floor 19. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

2 BHK 35 units · none available

35 units 645 sq ft 59.95 sq m as filed

3 BHK 38 units · 7 available

35 units 1023 sq ft 95.0 sq m as filed
3 units 1184 sq ft 110.04 sq m as filed
Units sold

52 / 73

Selling steadily

71% absorption rate

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

2 BHK 35 flats · none available

645 sq ft carpet as drawn

Carpet, filed
645 sq ft
Built-up
about 774 sq ft
Super built-up
about 903 sq ft
Every room in this flat

Living and dining about 188 sq ft, Master bedroom about 125 sq ft, Second bedroom about 100 sq ft, Kitchen about 75 sq ft, Bath about 44 sq ft, Balcony about 44 sq ft, Second bath about 38 sq ft, Passage about 31 sq ft.

3 BHK 38 flats · 7 available

1,023 sq ft carpet as drawn, from 1,023–1,184 sq ft filed in this configuration

Carpet, filed
1,023 sq ft
Built-up
about 1,228 sq ft
Super built-up
about 1,432 sq ft
Every room in this flat

Living and dining about 252 sq ft, Master bedroom about 168 sq ft, Second bedroom about 134 sq ft, Third bedroom about 109 sq ft, Kitchen about 101 sq ft, Bath about 59 sq ft, Balcony about 59 sq ft, Second bath about 50 sq ft, Passage about 50 sq ft, Third bath about 42 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹17,068 per sq ft of carpet, median of 52 registered sales
Range across those sales ₹12,451 to ₹18,162 per sq ft
Sold and booked 52 sold, 0 booked
Still available 7 flats, 645–1184 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Jun 2027
Current status Due Oct 2027

Revised projection

The completion date has moved from June 2027 to October 2027, 4 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

SR NO 5/1, 5/2A, 5/2B, 5/3/1, 5/4/1, 6/4B, PLOT NO 6 OF SR NO 5/3/2 AND 5/4/2 is the plot this project is built on, as filed
Revenue village Balewadi
TalukaHaveli
Street, as filed Balewadi
Bounded north by SR NO 6 PART
Bounded east by 24 M DP ROAD
Bounded south by SR NO 5 PART
Bounded west by 30 M DP ROAD

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerM/s. Samarth Builders
Registered officeOffice At 9th Floor, Majestique Cityview, S No 510 + 511, Opposite Apsara Theater, Gultekadi, Pune 411037

Professionals named on the filing

Architect Jay Aeram CA/92/15811
Engineer Nagnath
Engineer Prakash
Chartered Accountant Rsar & Associates 168233
Chartered Accountant Sanket 154387

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

20 June 2023 is when an advocate last certified the title to this land
Title report STR HOMES_compressed.pdf 20 June 2023 1 older version on file
Promoter's declaration, Form B Form B Promoter.pdf 19 June 2023

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100052295
Promoter M/s. Samarth Builders
Project typeResidential / Group Housing · Building development
LocalityBalewadi — Haveli taluka, pincode 411045
Applied on21 June 2023
Registered on09 August 2023
Completion, as first filed30 June 2027
Due30 October 2027 4 months later
Units declared73
Units sold 52 of 73 sold (71%), 21 still unsold
Complaints0 on record with MahaRERA
Certificate on file Original registration certificate, issued 17 January 2024
Application referenceREA52100141057
Current statusActive
Record last changed 12 December 2023 · over 2 years ago 2 years untouched

Where the sold count comes from, and whether it holds up. 52 of 73 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 73 flats and reaches the same answer — 52 sold, 51 of them with money recorded as received against a named flat, and 7 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 12 December 2023.

MahaRERA has not recorded a change to this project's record in 2 years, while still listing it as under construction. That date moves on status changes and system updates as well as on anything the promoter files, so it is not proof the site is idle — but on a project still being sold, it is worth asking the promoter what has been filed since.

Common questions

Is Majestique Signature Towers A2 registered with MahaRERA?
Yes. It is registered as P52100052295, filed on 09 August 2023, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Majestique Signature Towers A2 due to be handed over?
The promoter has told MahaRERA October 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Majestique Signature Towers A2 been delayed?
Yes. The first date filed was June 2027. It now stands at October 2027, 4 months later.
What did buyers actually pay in Majestique Signature Towers A2?
A median of ₹17,068 per square foot of carpet, across 52 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Majestique Signature Towers A2?
7 of 73 were still unsold at the promoter's last filing, in 3 BHK, from 1,023 sq ft of carpet.
Are there complaints against Majestique Signature Towers A2?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Majestique Signature Towers A2?
M/s. Samarth Builders, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 04 October 2026. The authority's own page for P52100052295 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Balewadi