RERA registered P52100046445 Active
27 Grand Residences- Tower 1
Balewadi, Pune · Others by Majestique Luxury Homes LLP
Official record Updated from the register 04 October 2026. Anything filed since then is not here yet.
In short
27 Grand Residences- Tower 1 in Balewadi is MahaRERA-registered (P52100046445) and still under construction, with possession filed for December 2027. Buyers have already registered 112 sales here at a median ₹13,046 per sq ft of carpet — not an asking price. About 87% of the 143 units are sold. Majestique Luxury Homes LLP is the promoter.
- Sold here at
- ₹13,046
- per sq ft, 112 registered sales
- Available
- 2 BHK, 3 BHK, Office Space, Shops
- 19 left · 607–1,131 sq ft
- Possession
- Dec 2027
- as filed with MahaRERA
Where this is
Balewadi, PMC, Pune, 411045
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Unit sizes on file
All 143 units are filed unit by unit with the authority, the highest on floor 32. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
2 BHK 64 units · 11 available
3 BHK 64 units · 5 available
Office Space 7 units · 1 available
Shops 8 units · 2 available
124 / 143
87% absorption rate
Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.
2 BHK 64 units · 11 available
643 sq ft carpet as drawn
- Carpet, filed
- 643 sq ft
- Built-up
- about 772 sq ft
- Super built-up
- about 900 sq ft
Every room in this unit
Living and dining about 187 sq ft, Master bedroom about 125 sq ft, Second bedroom about 100 sq ft, Kitchen about 75 sq ft, Bath about 44 sq ft, Balcony about 44 sq ft, Second bath about 37 sq ft, Passage about 31 sq ft.
3 BHK 64 units · 5 available
1,082 sq ft carpet as drawn
- Carpet, filed
- 1,082 sq ft
- Built-up
- about 1,298 sq ft
- Super built-up
- about 1,515 sq ft
Every room in this unit
Living and dining about 266 sq ft, Master bedroom about 177 sq ft, Second bedroom about 142 sq ft, Third bedroom about 115 sq ft, Kitchen about 106 sq ft, Bath about 62 sq ft, Balcony about 62 sq ft, Second bath about 53 sq ft, Passage about 53 sq ft, Third bath about 44 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹8,611 to ₹17,918 per sq ft |
|---|---|
| Sold and booked | 124 sold, 0 booked |
| Still available | 19 units, 226–1141 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Stable projection
No delay reported in the latest RERA filings. Construction is recorded against the original baseline date the promoter registered.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Balewadi |
|---|---|
| Taluka | Haveli |
| Street, as filed | BALEWADI |
| Bounded north by | SR NO 27-1-2-3 PART |
| Bounded east by | SR NO 27 PART |
| Bounded south by | 30 M DP ROAD |
| Bounded west by | MAHALUNGE SHIV |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Majestique Luxury Homes LLP |
|---|---|
| Registered office | 9th Floor, Majestique Cityview Building, Survey No 510+511, Opposite To Apsara Theater, Gultekadi, Pune 411037 |
Professionals named on the filing
| Architect | Jay Aeram CA-93/ 15811 |
|---|---|
| Engineer | Sagar Jangam |
| Chartered Accountant | Sanket Bhandari and Associates 194427 |
| Chartered Accountant | Vinod Kumar Jindal 070666 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report STR Balewadi 27_2022_Full compressed.pdf | 12 July 2022 1 older version on file |
|---|---|
| Promoter's declaration, Form B Form B Promoter.pdf | 14 May 2022 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100046445 |
| Promoter | Majestique Luxury Homes LLP |
| Project type | Others · Building development |
| Locality | Balewadi — Haveli taluka, pincode 411045 |
| Applied on | 17 June 2022 |
| Registered on | 28 July 2022 |
| Completion, as first filed | 31 December 2027 |
| Due | 31 December 2027 |
| Units declared | 143 |
| Units sold | 124 of 143 sold (87%), 19 still unsold |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 28 July 2022 |
| Application reference | REA52100114009 |
| Current status | Active |
| Record last changed | 28 July 2022 · over 4 years ago 4 years untouched |
Where the sold count comes from, and whether it holds up. 124 of 143 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 143 units and reaches the same answer — 124 sold, every one with money recorded as received against a named unit, and 19 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 28 July 2022.
MahaRERA has not recorded a change to this project's record in 4 years, while still listing it as under construction. That date moves on status changes and system updates as well as on anything the promoter files, so it is not proof the site is idle — but on a project still being sold, it is worth asking the promoter what has been filed since.
Common questions
- Is 27 Grand Residences- Tower 1 registered with MahaRERA?
- Yes. It is registered as P52100046445, filed on 28 July 2022, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is 27 Grand Residences- Tower 1 due to be handed over?
- The promoter has told MahaRERA December 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has 27 Grand Residences- Tower 1 been delayed?
- No. December 2027 is the date first filed with the authority and it has not moved since.
- What did buyers actually pay in 27 Grand Residences- Tower 1?
- A median of ₹13,046 per square foot of carpet, across 112 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many units are left in 27 Grand Residences- Tower 1?
- 19 of 143 were still unsold at the promoter's last filing, in 2, 3 BHK +2 more, from 607–1,131 sq ft of carpet.
- Are there complaints against 27 Grand Residences- Tower 1?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building 27 Grand Residences- Tower 1?
- Majestique Luxury Homes LLP, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 04 October 2026. The authority's own page for P52100046445 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Balewadi
Stock image
- Registered here
- ₹11,422
- On offer
- 3 BHK
- Due
- Jan 2027
- Units
- 36
- Carpet
- 1,264
- Sold at
- ₹1.4 crore
Stock image
- Registered here
- ₹9,931
- On offer
- 2 BHK
- Due
- Jul 2028
- Units
- 28
- Carpet
- 675–679
- Sold at
- ₹67 lakh
Stock image
- Nearby
- ₹13,753
- On offer
- 1 RK + offices
- Due
- May 2028
- Units
- 178
- Carpet
- 182–251
- Typical unit
- ~₹29.9 lakh